Wasted time

It appears that roofing felt isn’t a very popular covering material here in France. Leroy Merlin is the only place that’s at all local that stocks both roofing felt (in green!) and the necessary bituminous adhesive to stick it down with. On the way I tried to save some time by stopping off in Brico Depot to see if they had a similar product but the (admittedly) young people to whom I explained what I was looking for didn’t understand either the idea of roofing felt, or the French words for it, which are ‘feutre bitûmé’, and tried to sell me something quite different and unsuitable for my job.

By the time I’d got over to Leroy Merlin, picked up what I wanted and got back home again, I’d already lost four hours and this is one of the problems with doing any kind of DIY work here in France, especially in a rural area like the Dordogne. Compared to where I used to live in the South-East of England, you have to travel comparatively huge distances to pick up even the simplest of materials and you can end up wasting so much time which would be much better spent on the job itself. But unfortunately you have no choice. It also means that small jobs take twice as long as they would do back in England and larger ones, like my new wood store, seem to just go on and on.

By the time I’d arrived home, the rain had cleared and it had actually become quite warm and humid. All the better to get the biting insects out, so I took the precaution of applying some insect repellent on my exposed arms and legs, but not before I’d already started work and picked up a couple already. I didn’t have much more than two or three hours today so there was no hope that I’d actually get the roof on, but I wanted to at least get to the point where I’d be able to tomorrow. I did my jiggery-pokery over the front door to get the level for my boarding and it all worked out beautifully.

null

Before I finished for the day, more or less in the dark actually, I even managed to get some boards nailed onto both sides of the store, which was nice and also showed me how quickly I’ll be able to get a weatherproof structure as soon as I have the roof on.

null

null

It was already beginning to rain lightly so I had no choice but to place the bare roof boards back on the roof to keep as much rain out as possible. Hopefully, this will be the last time though, and I don’t think that just one more night will do them any harm.

null

Oh dear…

It rained overnight and it’s raining now as I prepare to go over to Leroy Merlin this morning to buy a can of bituminous adhesive for the roofing felt. I’ve just checked outside and there are signs that the water is penetrating the OSB3 sheets I placed on the new wood store roof after all. I hope that I can get them permanently fitted and covered up before any long term damage is done 🙁

Every day…

It’s a-getting closer. It’s not going quite as quickly as a roller-coaster but the finishing line is almost in sight. I didn’t manage to get anything like a full day in today but nevertheless, I was still able to make good progress on the new wood store. The morning started wet but it cleared up before lunch time and although the forecast was for showers on and off for the whole day, that was all the rain that we ended up getting. When I went out to start work, it was obvious that we’d had quite a bit of rain overnight and that some had dripped down inside off the sides of the boards that I’d placed on the roof to keep the job as dry as possible. But they’d done their job quite well though, and it didn’t take that long to clean up.

The boards themselves are not strictly waterproof. They are made of a material called OSB3 that consists of compressed wood chips and shavings bound in a hard glue or resin. They are not designed to be constantly exposed to the weather but a few wet days (or nights) won’t do them any harm. The main danger is allowing water to penetrate the material from its edges and that won’t be a problem in the long term as it will be painted with a sealant and then covered by a layer of roofing felt.

I didn’t expect to be working on the roof itself today, but I did want to get the whole of the rest of the basic framework completed, which is what I managed to do. That included all of the remaining horizontal frame bars, bracers for the tops of the door frame sides and most especially, the back horizontal roof support. I hadn’t been looking forward to doing the latter at all because it had to be firmly fixed to the house wall, which is not only made of very uneven stone making it difficult to find regularly spaced fixing points, but is also very hard to drill.

My solution was to pop down to Les Briconautes for some new diamond-tipped stone drills in progressive sizes so I could start small and gradually increase the hole diameters up to the size that I required. They made the job very much easier than I’d expected, so my old drills that I had been using up until then must be pretty well worn out!

But anyway, I did it and here are some shots that I took at the end of the day as the light was failing after I’d finished work and cleared up for the day.

null

null

null

So all being well, if the weather is kind again, tomorrow should be the day of the great leap forward involving the fitting of the roof. I’ve got to complete the top of the door frame first and fix the top board on each side. I have to do that to give me my level to work to and my exact roof dimensions but I won’t bother explaining as it’s a bit complicated and all to do with calculations of the number of wall boards from bottom to top, having the right amount of overhang below the bottom of the frame down the sides of the concrete base so the weather can’t get at the bottom wood of the frame and having the ‘right’ amount of board over the door and at the top on each side. After all, what matters most in the final event, is that not only should it look right but it must also work 😉

Rain interrupted play

Stopped it, really. None had originally been forecast for today but the day never looked as though it was going to do very much. First I had to get a few things in Montignac, including some nails for fixing the new wood store’s wall boarding, but I should have put my brain into gear before dashing off because it ended up being not the only time I had to visit Les Briconautes today.

After a quick early lunch, the first thing I did was remove the sheets that I bought from Leroy Merlin on Saturday for covering the roof, from the roof where I’d placed them to keep the rain off over Saturday night and Sunday. However, immediately I did so it began to lightly rain again, so I replaced them immediately. I decided that although I’d not be able to do any work on the roof itself if it continued raining, at least I’d be able to cut and fit the frame horizontal side bars and other parts, working under the cover to stay dry.

I did the three bars on the left hand side and then realised that I was running out of my ‘general purpose’ screws. I thought that despite the inconvenience due to my stupidity in not checking what else I needed when I went to Les Briconautes this morning, I might as well go back again straightaway as there would then still be enough time left this afternoon to get a bit more done. However, I was wrong on that because by the time I got back, it was raining hard and steadily, as the following pics show, especially the first of the two.

null

null

So that was that and now that the weather forecast for the week has been revised, it looks as though it will be difficult, though not impossible if I can work around the showers, to get as much done this week as I would have liked. It won’t be too bad if I get enough dry spells for me to get the roof on because it will then be easy enough to nail the wall boarding on even if I have to do it in the rain. So it looks as though I’ll have to wait and see how it actually turns out. It’s annoying but I’ve been very lucky really that the good weather should have lasted this long as looking back, although we were still getting some nice days, by this time last year the weather was becoming much more unsettled than it is now and we’d also had a few stormy nights and days. I just need it to keep holding for a little while longer 😉

Recovery – day 4

Right, here’s my take on it. Every time you get bitten by a dog you don’t get rabies, so why should you get Lyme Disease just because you’ve been bitten by a tick? Common sense tells you that you don’t. OK, the tick bite that you get might be infected with some bacteria or other, but that could be lots of things other than Lyme Disease. I sat up late last night learning about Lyme Disease and the one conclusion that I came to is that I don’t, and didn’t, have it. There are lots of unfortunate people out there, millions of them worldwide, who suffer from the debilitating and life-changing effects of chronic Lyme Disease and I would be doing them a grave disservice and showing them no respect if I compared the puny effects of my tick bite to what they have to endure on a daily basis through no fault of their own.

Yup, I’m sure I got a tick bite just as many of them did and yes, it must have been infected, but after all the evidence and images of real Lyme Disease that I’ve now seen, I do not think that I am or was a victim of it. Maybe I’ve just been lucky. OK the game hasn’t been fully played out yet, but that’s the conclusion that I’ve been forced to come to after everything I now know and have seen and read. For the record, here are some shots of my ‘rash’ on the site of the bite, the first on 26 September, pre-treatment.

null

The second on 27 September, also pre-treatment.

null

The third on 28 September, also pre-treatment.

null

The last one, taken this morning after 3 full days of treatment with Doxycycline.

null

It seems clear to me that all of the first three show an infected tick bite but none of them show the really pronounced ‘bulls eye’ effect that accompanies Lyme Disease if, indeed, any rash at all shows after a bite by an infected tick. And I have to say that after reading about the appalling symptoms that most sufferers of Lyme Disease experience, either I’ve been fortunate to have been spared them practically in their entirety or, alternatively, I wasn’t afflicted by the disease in the first place. Coincidentally, Doxycycline is the preferred antibiotic of choice for the treatment of Lyme but as one of the tetracycline group, it’s also the preferred method of treating many other general infections.

So I won’t amend my earlier postings as they are a genuine reflection of my thoughts at the time, but I’m now going to stop referring to myself as having been infected by Lyme Disease. It over-dramatises what I think is possibly a common health-hazard of living in a rural area such as the one in which I live. What happened to me could just as easily have happened to a member of my family living in the UK who regularly exercise their dogs in the New Forest and for whom ticks are almost an occupational hazard, so it’s not just a local French problem. In fact my sympathies go out to the poor souls who could well number millions of all ages in enormous swathes of country across Canada and North America whose lives have been blighted by what could well be one of the most serious epidemics of modern times.

And one final thing before I put this subject to bed, for good hopefully. As I said to my doctor who, incidentally, I think has applied exactly the right treatment, if I’d been bitten by a tick, I’m sure I’d have noticed. OK, so they’re small, but I think I’d have noticed some kind of wound left after a dang insect had stuck half of its ruddy head in my leg. So I don’t think that I was bitten by a tick. I’ve been bitten by plenty of other insects, though, while I’ve been working outside on my new wood store and at other times, and I think that I was the victim of just a badly infected insect bite. End of story.

It was another good day

In just about every way, actually. The weather was glorious – another beautiful still, sunny day with the sky a clear blue all day and temperature again around 25 degrees Celsius. Just how long can this go on for? Long enough for me to get my wood store finished, I hope. After a quick shopping trip this morning I was able to enjoy another very productive day, because I felt no Lyme effects to speak of (in fact after only a couple of days, I’m already considering not mentioning it at all, it’s become so insignificant) and the work on the wood store just flowed. After today, I’ve got very little to do to finish the frame structure, as the following pictures I took this evening just as the light was beginning to fail, show.

null

null

null

Like any structure of its type, the frame will not be fully rigid until the sides and roof are all on, but as I’ve been able to pin one of the roof cross-members with a screw to one of the stairway uprights, it’s already much more rigid than I’d expected it would be at this stage. The two little corner trusses that I’ve fixed in the bottom right and left corners have also helped and I’m going to add two more tomorrow in the corresponding top corners, which will help even more.

With the progress I’m making, I’m becoming optimistic that if the weather holds, I might even be adding the roof and starting to apply the wall boarding over the week end. However, rain is forecast for overnight tomorrow and the early hours of Sunday, so I’ll have to wait and see how things go. The rain will only last briefly and it’s then forecast to return to similar weather to what we’ve been enjoying for another several days afterwards, so even if I have to leave the wood to dry out for a day before continuing, it looks as though I’ll have time to finish the job off before the weather starts to turn really bad. So it’s fingers crossed for that.

And the other good news was that after getting hold of some insect repellent this morning, I did a right proper ‘Enry Cooper’ and splashed it all over before going outside. I didn’t really expect it to work, but even after spending quite a while with my shirt off, I don’t appear to have been troubled by any insect bites at all. Frankly, I’m amazed because my experience is that these things usually don’t match the hype that goes with them. However, on this occasion it appears that I was wrong – and it was one of those times when I was glad to be 😉

Recovery – day 3

Well, I don’t wish to appear complacent or over-optimistic, but so far at least this Lyme Disease thing is turning out to be something of a non-event. I’ve just taken number 7 (of 30) of my course of Doxycycline tablets and although I won’t claim to be feeling 100%, I’m not far off. I am experiencing a bit of a loss of appetite but that’s no bad thing as I never did manage to lose the weight I put on when I had family and others visiting me over the summer and anything that helps me to shed a few pounds will surely be a good thing. However, it’s not the way that I’d necessarily have chosen to do it if I’d had the choice.

I mentioned yesterday that I planned to spend the whole day working on my new wood store but in all honesty, I really expected that I’d have to call it a day by late afternoon at the latest, as I’d had to last week while the disease was taking its grip. But that couldn’t have been further from the truth and I ended up working until nearly 7.00 pm, until I’d finished what I wanted to get done, having suffered no major ill effects the whole time. So this is more ‘continue with your life more or less as usual’ rather than ‘fighting your way back from illness’ and I hope that that gives some encouragement to anyone who might read this in the future who is worried after they have contracted Lyme Disease and have been alarmed by all of the horrendous stories they have read on the internet about it and the effects that it has. I’m convinced that the key is early diagnosis and treatment and then hitting the bacteria hard with antibiotics and so far at least, I am sure that that’s what has done the trick in my own case. I won’t show any pics yet, but even the characteristic ‘bulls eye’ rash on my ankle where the ruddy tick obviously bit me has also started to change and whereas the ‘bulls eye’ was originally highly pronounced, now it has already turned into more of a ‘port wine’ patch which, weirdly, seems to be regaining its original skin colour from the centre outwards.

But enough of that for today and what about the wood store? I wanted to get the basic framework up and secured and that’s what I managed to do, despite one or two setbacks. A chunk of the edge of the new concrete base split out while I was drilling it to take a plug and also one of the stones on the house wall, so I had to make both good as I went, which slowed me down a bit, but at the end of the day, here’s as far as I managed to get.

null

null

I was very pleased with the progress made, especially under the circumstances, and I have to say that I doubt that I’d ever have got that far without my new little Black and Decker ‘Visseuse Sans Fil’, which turned out to be a godsend.

null

So today’s plan is for more of the same. As I type this I’m scratching away at insect bites that I received yesterday as well as at least one on my left calf that I’m sure is from this morning. I gave my whole house a spray with Raid ‘anti mouches et moustiques’ yesterday and ran out while I was spraying my bedroom, so I’ll have to get some more of that as well as a few other things. While I’m out I’ll also drop into the Pharmacie and pick up some spray-on repellent because I’m getting a bit of sick of presenting myself as a free lunch to every passing insect every time I go outside my door and quite frankly, I need to find a way to stop it 😐

Recovery – day 2

In case anyone thinks otherwise, I am taking the whole Lyme Disease thing very seriously. It only needs a few minutes searching on the internet to find lots of awful stories about how some people’s lives have been changed forever by what can all too soon become a very serious condition if not diagnosed and treated promptly, with long term symptoms of chronic fatigue, joint and muscle pain and damage to major bodily organs. However, the other side of the coin is that if the disease is dealt with speedily, a full recovery is anticipated with no long term effects for the majority of sufferers and it’s for this reason that I am fully optimistic of an excellent outcome in my own case, and why I will also be documenting my own experiences as an example, I hope, to others coming after who may not have quite as positive an attitude as I have.

My doctor prescribed a 14 day course of 100 mg Doxycycline taken twice a day together with 1000 mg Paracetamol to be taken in conjunction as required. The latter I think are to help reduce the symptoms of feverishness and headache and feel like swallowing a small bomb when you take them, due to their size. This morning, I’ve just taken my fourth Doxycycline and whether due to psychological reasons or the ‘placebo effect’, I’m convinced that I already feel much better than I did the same time yesterday before I started on my course of medication. As I mentioned in my last post, although the prescription is for two Doxycyclines per day, yesterday I took three and I’ll be doing the same again today so as to get my blood levels up as quickly as possible and give it a fighting chance to get cracking on the Lyme Disease spirochetal bacteria.

I took the day off yesterday as quite honestly, I didn’t much feel like working. But I’m not going to do the same today and intend to try and get the framework for my wood store fully up and fixed firmly in place by this evening. However, I’m not going to push myself to the point where I start to go backwards again because my health is the top priority a long way ahead of my wood store. Fortunately, we’re still enjoying temperatures in the mid-20 degrees Celsius with no rain expected before Sunday, so all being well, I should still be able to make the progress that I want to. But that doesn’t stop me being very annoyed that this setback has hit me totally out of the blue and it just goes to show how easily one’s plans can be frustrated for the most unexpected of reasons.

The fight back begins

I needed to go back to Rouffignac for my blood test good and early because I received a message yesterday saying that a new Black and Decker cordless screwdriver that I ordered would be delivered some time before 1.00 pm, and I know what happens if you’re not in when the delivery happens. You end up losing at least another 24 hours. So I arrived in the health centre waiting room at around 8.20 am thinking that I’d be first in the queue. However, I’d totally underestimated the ability of elderly French people to get out of bed and get themselves organised as there were already two people in front of me! No matter, I was dealt with by a very considerate lady nurse within 15 minutes or so and as the adjacent Pharmacie was still not open by that time, I was then off back home again to receive my delivery.

It came after the usual telephone call from the driver to get directions to my house by about 11.00 am and then, thank goodness, I was free to get down to the Pharmacie at Montignac to pick up my antibiotics. And just as well too, because by that time I wasn’t feeling too well, as my ‘light flu-like’ symptoms of yesterday had progressed to ‘moderate’, if not ‘severe’. This was the first time that I’d used the French ‘Ordonnance’ (prescription) system but all I had to do was hand over one of the two copies of the prescription that my doctor had printed off yesterday together with my ‘Carte Vitale’ health card. You need to produce your Carte Vitale whenever you apply for any form of treatment – I’d had to with both my doctor and the nurse – and they plug it into a small terminal that’s similar to a credit card machine that records that you’ve received treatment. Then they work out the cost.

As a retired person in the UK, I was entitled to free NHS health care, including prescriptions, but that isn’t the case here. I had to write a cheque for 23€ to my doctor for his consultation and pay 6.10€ for my blood test. And my prescription cost 4.65€. So that makes a total of 33.75€ (around £25), not an inconsiderable sum for quite a few retired people living on limited incomes, but for me a small price to pay I think for the incredibly speedy, considerate and effective service that I consider that I’ve received. My old doctor in the UK was a lovely person and never gave me less than her full consideration and attention, but overall I think that the French system has performed much better than the UK one over the last couple of days and without any fuss or drama. Plus, as I mentioned in my last post, I was mortified by some of the reports I found on the internet about the appalling level of care, lack of it more like, that many patients infected with Lyme Disease had received at the hands of the UK NHS.

My 14 day course of two antibiotic tablets per day comes to a total of 28 tablets. In fact, I was given a full pack of 30, so as I’ve been advised on many occasions in the past to boost the dosage in the first couple of days to rapidly get the medication up to the required level, I’ll take 3 today and tomorrow and then cut back to the normal level. And I’m glad to say that it already feels like it’s working and I’m sure that my ‘flu-like’ symptoms are already beginning to subside. But as I still don’t feel well, I’ll not be taking on any ‘heavy’ work today. The next four days or so will remain dry so I should have enough time after tomorrow to get the back of the wood store build broken. Plenty of time, I hope, to roll up my sleeves and get the job done.

Some mixed news today

I was going to go anyway, but after being admonished in no uncertain terms by friends and family, I made a visit to my local doctor in Rouffignac this morning. He’s a very amusing chap and only speaks a little English, which is surprising for a professional. But we get by. He quoted with great relish some English he did know though, when he saw my ankle – ‘Don’t let the bed-bugs bite!’

He seems to think that it’s not a spider bite, but a tick bite instead. When I said that surely I’d have seen a tick because my old Toddie used to get them and I used to pull ’em off him, he said, ‘No!’ (searching for a small freckle on the back of his hand, and after finding one), ‘look, they are only that big’.

Anyway, he’s concerned about Lyme Disease because of the livid ‘bull’s eye’ look of it, especially when I said that I feel a bit sick as well, so he’s put me on a 14 day course of antibiotics. He checked my blood pressure and asked when I last had a blood test. When I said that I can’t remember because I’m never ill, he rolled his eyes and said how did I know I wasn’t ill if I never had a blood test and didn’t I think that it would be a good idea to have one now and again? Up against logic like that, what could I say, so he’s insisted that I go back again tomorrow morning when the nurse is there.

The whole thing here is much more relaxed than in the UK. When you phone you go straight through to the doctor himself, not some Gestapo-like receptionist whose sole aim in life is to minimise the number of patients coming into the surgery. It’s a lovely new health centre in Rouffignac and you all just turn up and sit in a nice bright, open waiting area awaiting your turn. There were only 5 or so people in front of me and it turned out 3 of those were for the dentist and the other 2 doctors, so waiting time was very reasonable. Anyway, I’m hoping that the antibios will do the trick – when I can get them.

It all began to unravel when I took my prescription to the adjoining ‘Pharmacie’ to pick them up. It turns out that today around ‘95% de pharmacies en Perigord’ are on strike in opposition to a proposal for the more wide-spread availability of medicines, eg in supermarkets, much as in the UK I guess. Some, like the one in Montignac, have been ‘requisitioned’ by the Directeur Général to force them to open for emergency purposes, for people desperately in need of medication. But if Montignac was anything to go by, the staff in those pharmacies just ignored the ‘avis’ stuck on their front doors and kept them closed, presumably without come-back. So ‘la système française’ always gets you in the end. ‘Plus ça change’ – this is the 21st century but it’s still the same old France 😉

When I got back from my abortive ‘Pharmacie’ trip, I Googled ‘Lyme Disease’. It definitely appears that I have got an infected tick bite because the pictures I found, the description and the symptoms all match my leg and my symptoms. The reports posted from those infected in the UK seem to be all doom and gloom, mainly because the treatment they received from the NHS was either negligible or non-existent. One lady, who was obviously more informed than her General Practitioner, was reduced to tears and asked why she wanted to be ill? That’s negligent and scandalous, especially as the lady in question now suffers from the long-tern effects of the untreated disease.

The more informed comments posted on US web sites paint a different picture entirely. So long as the disease is caught in its early stages (like mine has been) and the correct course of antibiotics prescribed (the ones prescribed by my French doctor are the standard treatment), people like me can expect a full and complete recovery. It’s a pity that I couldn’t get the tablets today as now I’ll waste yet more time tomorrow (although I do, admittedly, have to go back early to Rouffignac for my blood test) and every day lost means that finishing my wood store off becomes more urgent. Also, the sooner I start the sooner I’ll start feeling better as I am now experiencing some light flu-like symptoms that make doing heavy work more difficult than it necessarily need be.

These things are sent to try us 🙁

Something I really hate about France

Well, this part of it anyway. Insects. You can live with the little blighters if you’re just lying out in the sun because for some reason, maybe because you’re not moving around and creating a disturbance in the air, very few of them then notice you and the ones that do are just a minor nuisance. However, as soon as you go outdoors to do something heavier, gardening, or building something as I have been doing this week, they are on you from the moment that you start. And we’re not just talking five or six here, we’re talking about dozens. And they all seem to have one mission in life, especially if it’s a bit hot and humid and you have worked up a bit of a sweat, and that’s to bite or sting you.

There are lots down here that want to do that, ranging from midges, mosquitoes, wood wasps, mites (or jiggers as some call them) horse flies and so on. Even the little black flies that look quite harmless, like small house-flies, and you think are just being an awful pest swarming around your eyes, ears and mouth, give you a nasty little bite if you don’t notice when they land on you, and when you’re heaving and straining laying concrete, moving stone around or cutting wood, it’s impossible to spot every one.

The result has been that as I’ve been working outside on my new wood store, I started off being bitten all over the lower parts of my legs and every evening after my shower I’ve been frantically rubbing Cortisone ointment over all the little red raised bumps and welts in an attempt to derive some relief. However, for some reason, as the week has worn on, they seem to have transferred their attentions a bit higher and I now have insect bites all over my upper torso. With one exception.

When I was getting ready for my shower right at the beginning of the week, I noticed a small pink patch on my left ankle. It wasn’t like a normal insect bite and I couldn’t see any obvious puncture wounds and as it wasn’t causing me any pain or irritation I thought nothing more of it. As the week progressed, however, the patch began to expand day by day, becoming much more livid in colour and although it still isn’t causing me any pain or discomfort, this is how it looked this morning before I started work on the wood store.

null

I know of no insect here that could cause such a wound and I suspect that I’ve been bitten by a spider. Just as there are so-called False Widows in the UK, I’m sure that France also has its share and I’m wondering if one of those was responsible. One of the things I did right at the start of last week was remove two long oak planks from my ‘grenier’ to use as scaffold boards. They can’t have been moved for at least four years since the previous resident of my house put them up there and I wonder if when I pulled them out, I disturbed a spider that had been enjoying a blissful life in the darkness of my loft and demonstrated its displeasure in the only way it knew. The good news is that they don’t kill you but they can cause you to feel a bit unwell, depending on how big a slug of venom they inject into you.

As it happens, I have been feeling a bit off-colour for the past couple of days – a slight heaviness as though I’ve got a minor dose of flu – and I’ve put that down to the venom still going around my system as my body tries to get rid of it. I started work outside today with the hope that I’d get a goodly portion of the wood store’s wooden frame under my belt but there was no chance of that happening. I got a fair bit done but I called it a day at around 5.00 pm when I started to make silly mistakes, like picking things up that I’d forgotten were plugged in, or picking up a drill bit only to find that in fact I had my pencil in my hand instead. That was time to call it a day, I think, before I did damage to the job or, indeed, myself.

The only practical thing I did yesterday was finish off and make good the new concrete base after removing the wooden shuttering from around it. I made good any small bits of the edge that broke away when I removed the shuttering as well as any obvious holes in the exposed faces where the wet concrete hadn’t been able to pack down. I needed to do that in case any water subsequently found its way into them and then froze because that could potentially cause a bit of serious damage. I also had to cut back the stones on a section of the house wall in order to fix an upright of the new timber frame vertically to it and made that good afterwards as well, as shown in the second of the following two pics.

null

null

So today was supposed to have been the day of the big leap forward with much of the shelter’s wooden frame being completed by the end of the day. However, for the reason given above, that didn’t happen, but some useful progress was made nevertheless.

null

null

null

Tomorrow I’ll be going to Brico Depot to get some more wood, some long screws and some large plugs to fix the frame to the house wall and base with and possibly the plywood for the roof, although that can come a bit later in the week. Fixing the frame to the house wall and the concrete base will be more tedious than tricky because of the number of holes that I’ll have to drill into hard stone. But the upside is that once it’s done, then the job really will begin to move along quite a bit faster. At least I hope so, anyway 😉

And relaaaax…

I finished off the last small section of concrete this morning, as I intended to. I then went around with a sand/cement mixture making good the several small areas and holes where stones came to the surface or where there was a bad join between adjoining bays and I’m pleased with the results as it came out as least as well as I’d expected, if not better, as shown below.

null

It was satisfying cleaning up all my tools afterwards and getting them ready to be put away again until the next time. I think that putting down the base will be the worst part of building the wood store and I hope that it’ll only take a couple of days or so to get the basic framework up. I then went off for a good wash and a late lunch at around 2.30 pm, gave myself the rest of the day off and awarded myself a well-earned rest.

What about flying? Well, quite honestly, building my new wood store has to take precedence while the weather is as dry and settled as it is, so I can’t see myself getting airborne again until next week at the earliest. In any case, Victor’s not around as he and Madeleine are in Belgium and Wim is off grape picking in the Gironde, so it would be a solo experience anyway. All the more reason to press on while they’re away so we can fly together when they return.

Well, would you believe it!

I single-handedly mixed, barrowed and laid about a ton of concrete today and still it wasn’t quite enough 😕 Today was the first day that I got to use the cement mixer that I bought about two years ago for the very first time. And I was very pleased with it too, especially when I only paid 60€ for it! Here’s how I set myself up for the day’s work.

null

As planned, I started laying the concrete base of my new wood store from the back left hand corner, working across to the right and then moving forward and repeating the process. And don’t forget, that I’d banged little wooden pegs in regularly spaced across the whole area to give me a guide for the level to work to. I always thought that the first two bays were going to be the worst, mainly because of access and interference from the two vertical wooden supports for the stairs and landing of my ‘grenier’ and here’s a shot after I’d done them.

null

It was then just a matter of plodding steadily on. I didn’t bother stopping for any lunch, just a few drinks when I needed them, but it was tiring work and I didn’t get finished until around 5.30 pm. In fact, the two 400 kg ‘big bags’ of the ‘mélange’ of stone and sand that I’d bought from Brico Depot weren’t quite enough to finish the job off, as the next shot shows.

null

An accurate estimate was always going to be difficult due to the unevenness of the base itself and the fact that the concrete is thicker on the right hand side and I always suspected that it would be touch and go. So nothing for it, I had to clean the mixer, my wheel-barrow and my tools before the concrete in and on them got too hard and then I had to decide what to do. In the event, I thought it best to drive to Brico Depot this evening to get another bag so I can make an early start tomorrow and get finished off. Another ‘big bag’ is more than I need for the base but I’ll use what’s left and more when I come to lay my new path along the front of my house and round to the new wood store, which I might as well crack on with when I’ve finished the latter. By the time I got back from Brico Depot it was too late to do anything except park the car with the trailer still attached and then it was time for a well-deserved hot shower and meal.

All ready to rock-and-roll

When Wim saw my idea of placing three lengths of old metal in the ‘built-up’ end of the concrete of my new wood store (and workshop) with the aim of hopefully preventing it dropping in the future and cracking, he said that it would be better to put some proper reinforcing steel in. And I had to agree with him. So having fitted my old roof bars on the Kia over the week-end, today I went dashing off to Brico Depot to get a suitable piece. I had to rush over there as I thought that I might be too late to get there before Brico Depot closed for lunch at mid-day. In the event, I was wrong on both counts. The ‘old’ lunch-time closing time was 12.30 pm to 2.00 pm, but Brico Depot have now applied a new policy of remaining open ‘non-stop’, all day from 7.30 am to 7.30 pm, as they have been doing for some time on Saturdays.

So have the management of a French company (OK, owned by the UK’s Kingfisher who also owns B & Q) at last seen the light about how to sell more product and boost profits? Is this perhaps the beginning of the revolution that will drag France kicking and screaming into the 21st century and at the same time start to re-vitalise its sagging economy? We don’t know, it’s too early to say, but I for one hope so. And I commend Brico Depot for being the first to take the step that challenges a key issue at the heart of French working tradition and practices. Someone had to and I hope that it works for them and other major companies decide to follow their lead.

The reinforcing sheet was only just over 16 euros so I think that it will be an investment. I only needed to put it in the built-up end and here’s how it looked after I’d done it. It was a perfect fit with no cutting needed.

null

null

So then all I needed to do to get me all ready to start concreting tomorrow was put a couple of boards in place for me to run the wheel-barrow on. I found a couple of what I thought were scaffold boards in my ‘grenier’ when I first moved in so I went upstairs and dug them out. It turned out that they are actually two cut oak planks but they’ll be OK for what I want to do. I’ll be starting up in the back top left of the new base, laying the concrete from left to right and then moving forward until I’ve completed the whole job. Here’s how I set the two oak planks up.

null

null

So now I’m all set to go. The weather should be almost perfect tomorrow with no rain forecast (for the whole week, actually) and a temperature starting at around 13 degrees Celsius and rising to about 20 degrees by mid-day. I don’t know how long the job will take but I’m now all ready to go and can’t wait to get started at last 😉

Shpot the differensh, Moneypenny

After the Scottish independence ‘No’ vote on Thursday, that’s my best Sean Connery accent. Take a look at the two pictures shown below. Here’s the first one, showing the front of my Kia.

null

And here’s the second showing the back.

null

Differences not too hard to spot, eh? Every French ‘département’ has a code and old-style number plates had them incorporated within the vehicle registrations themselves. So from before I first started coming to France up until quite recently, cars from Paris used to have registrations ending in 75, those from the Charente 16 and so on. But as in the UK, the old-style numbers eventually began to run out and a new format had to be devised. This was done, but in the process the automatic indication of département was lost, because it consisted of two letters followed by three numbers followed by two more letters.

Anywhere else but France, this probably would not have presented too much of a problem, but here it touched a nerve. It turned out that French drivers liked to display their départements on their number plates, so a compromise was worked out whereby drivers were given the option of displaying not only their département on their new number plates but also the region of which it is a part, by way of a flag-style motif on the right of their plates counterbalancing the ‘F’ for France that appears on the left under the multi-starred EU flag.

Unlike in England, before a vehicle with old-style number plates changes hands, it has to be re-registered with a new-style number and this is what happened with my Kia Sportage. So when I acquired it, it had plates that ended in 09 for the Ariège because the previous owner lived there in the commune of Verniolle, which is in the greater region Midi-Pyrénées. So when I bought it, it had new-style plates with ’09’ and ‘Midi-Pyrénées’ on the right of them. There’s no need to change this nowadays when you buy a vehicle from outside your region but as an indication of how entrenched attitudes are here, here’s a little story.

During last week I went up to the ‘poubelles’ to dispose of some rubbish that included… ahem… quite a few empty beer bottles. As it happened, there was an elderly gent there who was also disposing of a few himself and as we were chucking our bottles into the waste glass container, I made a comment that ‘this was evidently the end of the summer holidays’. He picked up on this and asked if I was up on holiday from the Ariège, having spotted the Kia’s registration. I replied that no, this was merely where I had bought the car from and he grumpily said that in that case, I should change the number. Apart from showing that not everyone in France is full of sweetness and light, it shows just how ingrained this number plate thing is.

Well, I had to buy a third plate for my trailer, so I thought that I might as well go the whole hog and buy matching new ones for the Kia too. They arrived today so after sorting out the trailer, I thought I might as well finish the job off and replace the ones on the vehicle as well.

null

null

So that should keep France’s Victor Meldrew happy if I bump into him again up at the poubelles. The new plates now show ‘Aquitaine’ and ’24’ for the département of Dordogne and while I was at it, I thought that I might also see if the old roof bars that I had for the Astra, which were supposed to be ‘universal’, actually are. And surprise, surprise, they fitted very nicely, so at the end of the day, everyone was happy. Result!

Kia tow-bar day 2

We had thunderstorms that woke me up just before dawn. Not a lot of rain fortunately, so at least the ground wasn’t made soft and muddy, which would have made installing the tow-bar electrics a rather nasty job. As it was, just as I’d got everything all ready to start work, we had another heavy shower accompanied by a few rumblings of thunder, so it was after mid-day by the time I really got going.

The first job was to mount the trailer socket and this was easy enough. However, I found that I had to angle it slightly downwards (see pic below) which meant that the cable sleeve passing through the rubber shield into the back of the socket is a high point. I just hope that this doesn’t encourage ingress of water if the socket is in the path of spray while driving over wet roads.

null

Then it was time to make all of the necessary electrical connections. The main problem with many vehicles, including my old Astra, is finding a convenient route for the bunch of cables from the tow hitch up to each of the rear lights, but I’d already looked on the internet and was encouraged to see that apparently as the rear lamp clusters are accessed, eg for bulb changes, from the outside of the Kia and not from the inside, the cables can all be easily run to either rear light along the inside of the bumper. When I checked by removing the left rear lamp, this is what I saw looking down behind the bumper.

null

So the videos on the internet were dead right, and from then on it was a piece of cake and I didn’t bother taking any more pictures. I ran an extension from the right rear lamp (driving light and flasher) over to the left where I made all my connections, including an indicator buzzer that I had left over from when I fitted the Astra tow-bar. This tells you that the trailer indicators are working and is required in the UK but not in France. However, I think it’s handy to have, although I found that because it had to be fitted on the outside under the bumper, I couldn’t actually hear it from the driving seat with the engine running. Nevertheless, it’ll mean that I can check the trailer indicators with the engine off without having to get out and physically check them.

I was worried at one point that the length of harness supplied was going to be too short. In fact, it was just long enough, but a little bit too close for comfort in my book. At the end of the job, I’m pleased to say that when I tested the set up, everything worked exactly as it should do immediately, so that was a relief. The fog lamp didn’t work, but as I recall I had the same problem with the Astra, so I think it may not be connected in the trailer plug. I also found that when I looked underneath it, my trailer had a bit of spare cable coiled up to ‘shorten’ it, and when I released it, it easily reached the power socket on the vehicle. So taken all round, another good day’s work.

But what about flying? Well, depending on which forecast you believe, either Saturday or Sunday will be the best for flying in the next few days, so I’ll have to wait and see and make my choice accordingly. I’m now well overdue for another flight in 56NE, but in the meantime it’s back to the wood store!

Another very useful day

The weather forecast is very problematic going towards the end of the week. The reason is that we’re getting high temperatures – today we had 30 degrees Celsius – and they often turn into thunderstorms if the air is also a bit unstable. So with that possibility in mind, I wanted to get across to Brico Depot as son as possible now that the Kia has its tow-bar fitted, even without trailer electrics, to pick up the ballast I need. It also gave me the opportunity to drop my last few rubbish bags off, which were a bot mucky from having stood outside for a while, in the ‘poubelles’ as I drove past. I took the following two pictures with the trailer hitched up before I drove off.

null

null

I was a bit worried that the Kia tow-bar might be a bit high for my relatively quite small trailer and that its nose might be slightly raised, but in the event I needn’t have worried, because it sat level, especially with a weight in. The ‘big bags’ of ballast that I wanted to fetch each weighed 400 kg, which happens to be the maximum rating of my trailer, so I had to make two trips this afternoon over to Trélissac. In fact I also loaded two 35 kg bags of cement as well on the first trip and one on the second, so my trailer did very well as it was pretty much loaded down.

I had to un-hitch the trailer and tip it up backwards to get each bag off, but now they’re standing side-by-side outside where I plan to run the cement mixer. I don’t think I’ll do that straight away tomorrow as I think that I’ll finish the tow-bar installation first and run the trailer electrics. I don’t like leaving too many things half-done and hopefully it won’t take more than a couple of hours. In any event, the new tow-bar did its job well and today ended up being very useful.

Kia tow-bar day 1

It was a bit windier than on recent days but the weather forecast said that despite the small possibility of thunderstorms later in the day, this would be a good day to fit the Kia tow-bar. I got myself organised by identifying, labelling and laying out all the parts according to the assembly instruction diagrams, on my kitchen floor.

null

null

Then I set the Kia up on a slope at the side of my front lawn for easy access to its rear end with some nice clean plastic sheets to lie on in the hope of keeping the ‘Aoûtats’ at bay.

null

Following the assembly instruction diagrams was a lot easier than I’d thought it would be. The main reason was that whereas the Astra tow-bar was a ‘custom’ design that needed the boot to be drilled as there were no built-in tow-bar mounting points, the Kia tow-bar uses mounting points that were designed in by the manufacturer. Some of these already had bolts in that were discarded as the kit came with a complete set of bolts and others were covered by small round plastic stickers that I had to remove and throw away. All went pretty well until I got to the main mounting plates for the right-hand end of the tow-bar which used bolt holes that were already being used for the original towing eye. The diagrams were far from explicit about how to deal with this but luckily in my researches before selecting a tow-bar to buy, I’d read ‘how to’ instructions on various manufacturers’ web sites. Some of these had mentioned removing and cutting a chunk off the towing eye, which I hadn’t understood at the time, but as soon as I saw it for real, I did. Out came my trusty ‘meuleuse’ and off came the top part of the towing eye mounting bracket.

null

Both end mounting plates went on much easier than I’d thought they would do. In fact, one of the most difficult bits was removing the rear exhaust rubber hangers which were pigs to get off even using silicone lubricant spray that I luckily had in my ‘atelier’. Here’s how they looked when fitted.

null

null

According to the instructions, I then had to cut a notch in the bottom edge of my plastic bumper measuring 5 cm x 4.5 cm. I found afterwards that the 4.5 cm dimension was a bit excessive and it could have been up to 2 cm less, making for a neater final job. However, with the tow hitch fitted you can’t see it unless you get right down and look for it, so it isn’t too important. Then came the most tricky bit of the whole job – fitting the main bar that holds the swan-neck with the tow-ball on it. Each end had a hole in that was tapped for a large bolt and I took the precaution of running a bolt into each one before offering the bar up to the vehicle for fitting. And lucky I did, because one must have had some over-spray in it because it was very tight and would probably have been impossible to fit if I hadn’t, lying on my back under the car taking the weight of the bar with my legs. It was a pig anyway and the air around Le Bousquet was blue for a while until I’d got the bolts tightened.

Here’s a final shot taken under the car with the main bar and tow hitch in place. You can see the bracket for the electrics socket on the rear securing bolt of the tow hitch swan neck and fitting those will be the final part of the job.

null

Here’s a ‘selfie’ that I took when I’d finished and had caught a glimpse of my face in the mirror!

null

The final job (OK, without electrics) looks pretty good I think. There were a couple of scratches on the swan-neck that I had to splash a bit of smooth black Hammerite on but I don’t think that that will be too important in the whole scheme of things.

null

So what were my conclusions? Overall, very positive. The sheets that came with the kit gave an installation time of 3 hours and I guess that that would be possible for an experienced installer who’d done a few of these before. The instructions could have been more explicit about how to deal with the existing towing eye ie the necessity to cut the bracket, but luckily I’d read about this elsewhere before. I also found that the number of large flat and locking washers was incorrect – there were too many small ones and an equal number too few of the large ones. I worked around it, but it would have been nice if the quantities had been correct.

The main weakness, that I haven’t come onto yet, seems to be the kit’s electrics. Nothing is assembled. I don’t mind connecting the wiring to the electrical socket but the wires themselves have just been supplied in a bundle and not fed through a long plastic sleeve, which is separate. Feeding them all through together is proving to be tricky and it looks as though I shall have to find a length of stiff wire to attach to one end of the bundle and then pass through the plastic sleeve bringing the wires with it.

I’m also a bit concerned that by fitting the car socket to the rear of the hitch under the car, the wiring to my trailer plug might be a bit too short to reach and could require lengthening. But that’s for another day. At least as it is without electrics I can now get across to Brico Depot and pick up some ballast and cement in my trailer and then get on with laying the base for my new wood store. So at the end of the day, I’m a happy bunny 🙂

Boring kind of day

After missing the delivery of my new tow-bar for the Kia on Friday, I had to wait around for it to be delivered today. As it was very warm, dry and sunny, I thought I might as well make the most of the weather by doing my washing (it has to be done…) and the two loads that I put through the machine were both dry minutes after I’d hung them out. So that was good. The delivery lady eventually arrived mid-afternoon as she’d promised on Friday and said that she’d found my address easily after I’d given her directions. She then zoomed off again in her little van after we’d yanked my parcel, which was very heavy, off it and I’d signed her delivery docket. Here’s what I found when I unpacked it – the box was mostly full of plastic ‘filler’, which I removed before taking them.

null

null

null

So now I’m ready to go ahead and fit it. I’m not looking forward to it very much, for three reasons. Firstly, there are no ‘written’ fitting instructions – all you get are a few sheets of pictures and diagrams and I think that it’s going to be a bit challenging as a result. Secondly, I ordered a tow-bar that will take a good size caravan and not just my tiddly little trailer, so it’s ruddy heavy. And thirdly, it was this time of year when I fitted the tow-bar on the Astra and after rolling around on the ground doing it, I got covered in bites from the horrible little mites that are called ‘Aoûtats‘ in this part of the world. They are so called because they are particularly prevalent during the month of August (Août) and people who walk their dogs in the grass or walk around in flip-flops are particularly susceptible to them. I’ve got bites from them already just from working outside in my flip-flops on my new wood store, so I’m not looking forward at all to getting ‘down and dirty’ on my back on the ground again, which will bring me in even closer proximity to the little blighters. Forewarned is forearmed, as they say, so I’ll have to find something to lay on the ground for me to roll around on. But in any case, I don’t have a choice 🙁

Yesterday, today

Yesterday – meet-up, English friends, St Emilion. Today – back to the wood store. St Emilion is one of the principal wine centres in the Gironde giving its name to one of the most important Bordeaux wine ‘appellations’ and although the meet-up was arranged at the last minute, it’s only two hours away from my house and the visit was well worth the drive.

It’s surrounded by a sea of vineyards, as well as by some of the region’s principal chateaux, which come right up to its edge in some cases. The roads around the town to the north (I can’t speak for the roads to the south but I imagine they’re the same) are bordered on both sides by high grey stone walls, all the more to protect the valuable produce behind them from the hordes of tourists who visit the town every year. The feeling driving on them in your car, even in the Kia which has a high view-point, must be like being a horse with blinkers on. Driving through the region and approaching the town, it’s obvious from the state of the vineyards, chateaux and other buildings involved in wine production that wine has brought great wealth to the region. This is even more evident in St Emilion itself, which is very beautiful, very chic, chock-a-block with wine shops and rather pricey for the most part.

St Emilion is built on the side of a steep hill and although vehicles can get right into the centre of the town, they are discouraged by no-entry signs on all sides. Those in the know just ignore them but I didn’t know that and found a parking spot just outside the city wall high up on the northern side that was quite fortuitously not far from where we were meeting-up. My approach down into the town was on foot down a precipitous cobbled road which must be lethal for pedestrians (and vehicles too, probably) in the wet. But that didn’t apply yesterday as the weather was glorious, at least as good as, or even better than, the very best days that we had over the summer.

St Emilion itself was still alive with tourists even though the end of the season is almost upon us. The ones who are there at this time of year, though, are predominantly older, without children, with a high proportion of retired folk. I took quite a few pictures and show one or two below to give a flavour of the place. When I eventually get around to putting up a ‘scenery and places’ gallery here on My Trike to show all the pics I’ve still got from when I was down south, I’ll also include the remainder that I took yesterday in St Emilion.

null

null

null

null

null

null

Today it was back to more mundane things – the concrete base for my new wood store. The only thing I could do while waiting for my new tow-bar to arrive from Poland was to fill it with hardcore ready for concreting. I’ve been talking about it for several days now, but today was the day when I finally did it. It took me longer and required more effort than I’d anticipated, but eventually it was done, as you can see below.

null

null

I’m pleased with how it turned out. It took longer than I’d thought because it needed a bit of care to keep the hardcore uniform across the base at the right level. I don’t need, or want, to lay too thick a concrete base as the thicker it is the more effort it’ll require to lay and the more it’ll cost. I think it’s now about right. Because I’m a bit worried about the right-hand end, which I’ve built up, dropping a bit over time, I’ve also chucked in three lengths of metal that I hope might help prevent the base sagging and cracking.

Only problem was, as usual, the driver delivering my new tow-bar phoned to find out where my house is and unfortunately I missed the call. She (because indeed it was a ‘she’) phoned again – while I was in the shower. When we eventually got to speak she was over in La Douze, which is too far away for her to have come back from, so she’ll be doing the delivery on Monday. Pity, as I’d like to have fitted the tow-bar over the week-end. It also looks as though the weather could be on the change and we might even have storms for much of the week as from Monday. It never rains but it pours, eh 😕

Now back to the wood store!

With all the disruption and toing-and-froing to do with my phone and internet problems, work on the new wood store took a back-seat last week. That’s not to say that there wasn’t a bit of progress, but not that much I have to confess. Since I last wrote about it on August 31, I have only got as far as finishing off the shuttering and getting the surface pegged out ready for concreting.

null

null

null

Anyone who doesn’t know might wonder what all the pegs are for. My dad was an expert and I learnt almost everything I know about doing DIY and building work from him and I watched him do this on many occasions. The pegs are banged into the ground in regular intervals to exactly the height that you want the surface of the concrete to be. The area between each set of four pegs then becomes a ‘bay’ and this is useful if, like me, you are working alone, can only mix the concrete in small quantities (ie one mixer load at a time) and can’t lay it very quickly. Then you can mix and lay a bay at a time working to the level of the pegs, knowing that the finished surface will end up level. As you reach each set of pegs you can either remove them, using the new concrete edge as your level, or leave them in even depending on how the base will be used in the future. I’ll be removing mine as I go.

I only need to add hardcore before concreting and I mentioned in a previous post that as I don’t yet have a tow bar on my Kia, I investigated having some ballast delivered from my local builders’ merchants, as you routinely would in the UK. It would cost me 29.60€ to pick up a 400 kg bag of ballast in my own trailer from Brico Depot. However, Point P at Montignac wanted over 60€ for the same quantity of ballast and over 90€ to run it the four or five miles up the road to my house. Clearly I have to get a tow bar fitted and I now have one on order. In the meantime, work on the wood shelter has come to a halt while it is being delivered from… Poland. As usual, it’s much cheaper to buy one in from hundreds and hundreds of miles away than to source one locally from France. Will they ever learn?

Flight 7 September

We had some pretty nice weather last week while my life was being disrupted by my telephone and internet problems, so I was bent on getting at least one decent flight in by way of compensation. However, when it gets hot down here during the day it also gets very thermic, which can make for some very uncomfortable flying as I’d found out when I flew out to Vergt on 18 August. That’s why lots of pilots fly early in the morning or in the early evening, when conditions can be almost perfect. I left it too late on Saturday because at this time of the year you need to be back on the ground by 7.45 pm to give enough time to put the aircraft to bed before it gets too dark, so I decided that Sunday it would be and gave myself plenty of time to fuel up 56NE and get airborne. Lucky that, as I had to return home after starting out having forgotten to bring some sticky-backed dacron that I’d recently purchased and needed to put over a small slit that I’d carelessly put into an aileron skin with my thumbnail while re-fitting the covers a few weeks ago.

I had a flight already loaded into my satnav, as shown below, that was planned to take about 52 minutes. The dark green line shows my planned route and the red one the track I actually flew.

null

I planned to fly north-west up towards Périgueux flying close enough to get a view of Bassillac airport and taking in Boulazac and Trélissac where all the big stores and warehouse outlets are to the east of the city and Périgueux itself, before turning south over the motorway to Bordeaux and heading back south-east to return to Galinat. I got away at 6.37 pm and immediately knew that my timing was perfect. I was only wearing shorts and a tee shirt and after the heat of the day, the air felt warm against my arm. But despite the heat, the air was perfectly smooth, and so it remained for the whole of the flight. Unfortunately, I knew that at that time of the day the sun wasn’t going to be very sympathetic to any photographs that I took and also that most of the main ‘sights’ would be on the other side of the aircraft from where I was seated, but I hoped to get a few decent ones nevertheless.

As I headed off to the north-west I saw my house pass under my starboard wing and 20 minutes or so later was approaching Périgueux Bassillac airport. It isn’t as grand as the name might suggest and that’s it in the large ‘clearing’ behind the wing strut in the shot below.

null

And then on to the adjacent commercial area of Boulazac/Trélissac.

null

I didn’t really expect to get any decent pictures of Périgueux itself but took a few pointing my camera out of the other side of the aircraft, of which the following two were the best.

null

null

Four or five minutes after leaving Bassillac behind me, I turned over the motorway interchange to the south of Périgueux to begin my return journey to Galinat. It was a surprisingly uninteresting sight with very little to see but I took a shot nevertheless 😉

null

The short southerly leg took me to my final waypoint, Eglise-Nueve-de-Vergt, where I turned to the south-east to head back towards Thonac. There was hardly anything to see there either, but I decided to take a photograph anyway.

null

Twenty minutes later, I was turning final for a landing back at Galinat and a touch-down that was the closest you could ever get to a ‘greaser’ on Galinat’s rather bumpy, it has to be said, grass surface. The whole flight took 53 minutes and averaged exactly 60 mph in conditions that were as near perfect as they could ever be. I went home well satisfied with a broad grin on my face after my trials and tribulations with Orange and a feeling that the world isn’t such a bad place after all 🙂

Cut off – yet again

Except for the roads, for the most part the infrastructure in rural France especially, such as telephone, water and electricity is crumbling. And when you combine that with the fact that there is no real competition, since the state-owned monopolies still exercise almost complete control, and the general French attitude towards customer service, which is to fob the customer off and get rid of them for as long as possible, when things go wrong you have a recipe for disaster and intense frustration for the consumer. And this especially applies for anyone from northern Europe (eg UK, Germany, Holland) who are used to things being done rather differently.

This week I’ve been on the receiving end once more because yet again my telephone and internet went down for no apparent reason. This would not be an issue in northern Europe because after reporting it, a technician would have checked to see if it was a system problem and an engineer then despatched if all was found to be well technically, to check if there was a local problem. But in any case, telephone systems aren’t regarded nowadays in most advanced countries as being that complex and the problem would almost always have been resolved within a day or so.

But not so in France. As of yesterday, my service had been down for over a week and due to Orange (France Telecom) customer service spewing out a web of fantasy as to the cause, nothing had been done in practical terms to deal with or rectify the problem. The local Orange shop (which at over 25 kms I had to visit two or three times in order to try and get any kind of action) eventually just exchanged my modem, which turned out not to be faulty and I subsequently hit the roof after a friend insisted that Orange technical service (an oxymoron if ever there was one) who I could not call myself, called me and then, after a week they just asked me if I’d tried unplugging my modem and plugging it back in again. I ask you!

After I’d insisted, they eventually arranged for an engineer to call at my house despite my saying that nothing had changed here and that from my (long) experience both here and in the UK, it was obviously once again an internal Orange system problem as no signal was being received and that they should look within their system for the source of the problem. They told me that this is the ‘system’ and, monsieur, the way things are done in France.

Sadly the French can apparently see no connection with all of the above and why their economy is such a basket case. The stupid politicians will not break up the state monopolies, sell them off and encourage competition and hence greater efficiency as Mrs Thatcher did in the UK because such a notion is ideologically unacceptable to them. And the French just shrug their shoulders when you tell them about your problems, agree that the situation is awful and say that the same things happen to them too, so what hope is there that things will ever improve? I fear that unless there is a sea-change in attitude there never will be any improvement and France will continue to languish down the field or fall even further behind the other more competent nations. How sad if France is eventually viewed as just a beautiful country in which to live so long as you can put up with the down side that holds it back – short-sighted politicians, poor planning, bad management and ineffective administration. It’s a certainty in my view that France will never recover from the slump that it is in until these issues are addressed – and sooner rather than later I think.

A properly qualified telephone engineer arrived outside my home yesterday morning and was soon checking my line at the top of the pole on his elevating platform. He disappeared down the road a couple of times, presumably to the connection box about a kilometre or so away, and eventually had things back up and running in an hour or so. If only technology companies would stop having non-technical customer service departments who know nothing about the technology of their product and just end up wasting your time and theirs and irritating the customer big time. If the company had referred the problem to a real technician a week ago when they were first made aware of it a whole lot of time and aggravation could have been saved. And cost too, as a perfectly good modem was junked by the Orange shop – what kind of scale must that happen on if my case was anything to go by? But they never learn 😡

A footnote about attitude. As I do not currently have a tow bar on my Kia, I enquired at Point P, the local builders merchants, about delivering some ballast for concrete to my house. The cost for me to pick up a 400 kg bag from Brico Depot in my trailer would be 29.60 euros. The Point P depot is 7 or 8 kms from my house. They wanted over 60 euros for the same amount of ballast and over 90 euros to deliver it. I think that that says an awful lot. They had the last laugh though. I clearly have to get a tow bar for my car pretty quickly as otherwise work on my new wood shelter will come to a grinding halt with a change in the weather soon to be in sight. Only one problem. I couldn’t order one… because I had no internet. What a system, eh 😕

Almost there…

But not quite. I’d hoped to get all of the shuttering in for the new wood shelter’s concrete base today, but didn’t quite manage to do it. I’ve been finding the work on it very heavy going, mainly because the ground is hard, dry and full of rocks. I’ve had to use a pick-axe all the time rather than a shovel, which has made for rather hard work, and whenever I’ve banged a peg into the ground to nail the boards to, I’ve hit a rock. So I eventually decided that I was too shuttered – sorry, shattered – to continue and called it a day at 6.30 pm with one section of board still not in.

null

I should be able to finish that off pretty quickly tomorrow, when I’m feeling fresher again. And at just gone 11.00 pm I’m now going to turn in at what is quite early for me, so I can make an early start. I want to drop into the Point P builders merchants first thing tomorrow to see what it will cost to get a big bag of ballast delivered, although actually I have very little choice as for the time being I don’t have a tow bar on the Kia so can’t pick it up myself in my trailer. Then I can look forward to using up a lot of the hardcore that I dug out of my lawn a few weeks ago as sub-base for the concrete. It should be an interesting week as it’s forecast to be a hot one – not the best conditions for doing this kind of work. I’ll have to wait and see how it turns out. Might even be able to get a flight in if I’m lucky 😉

Bad luck? Good luck!

There’s an old saying that ‘things happen for a reason’ and sometimes things happen that you originally think are a set-back and a total pain in the back-side but turn out eventually to be a bit of good fortune. And that exactly sums yesterday up.

While levelling the base for the concrete floor of my new wood store I’d already come across the waste from my bathroom and the pipe for the house’s main water supply. I was pleased to have done that because I had no idea where they were before and now that I did know, I didn’t mind that they’d be covered up again with concrete later on. I took a picture in case I needed to refer to it at some time in the future.

null

I’d had even less idea where the waste from my kitchen sink was until I also came across that while I was digging out a channel in which to place the first length of shuttering for the concrete. Quite unexpectedly, it turned out to be about two metres from the wall of the house and I’d only come across it because I’d heard a hollow sound while I was hacking at the ground with my pick-axe. As it was plastic, I’d thought that I’d taken great care not to hit and break it, but while I was preparing the ground I took a close look at it and noticed that it was cracked. There was a large tree root tightly up against it which may have caused the damage but maybe I had damaged it with my pick-axe after all. In any case, it didn’t matter because the damaged section had to come out and be replaced, and I was cursing my luck.

So as it was already late afternoon, I quickly had to have a wash, change out of my working togs and head across to Brico Depot at Trelissac to get the materials that I needed, otherwise I’d not have been able to use my kitchen sink. As I was going over there anyway, I thought that I might as well drop into the Orange shop because when I’d signed up, I’d been promised that on provision of proof of payment, I would be given a voucher for the 45€ that I’d had to pay for terminating my SFR contract for telephone and internet.

As I already had a short length of 40mm plastic tube left over from when I put Val’s kitchen in for her, the other bits and pieces that I needed for the repair only cost a few euros. So then I dropped into the Orange shop. The young lady who I spoke to first initially said that the offer had expired but after I said that it was linked to the date when I signed the contract she asked a young chap about it. He recognised me and spoke a few words of English before telling the young lady that it was OK as I was indeed due the voucher.

I’ve been absolutely delighted with Orange. I’ve been connected since the first week of June and so far haven’t paid a centime for my phone and internet as I received an initial 3 months free. This has saved me over 100€ compared to what I’d have paid SFR in that period. Now I’m getting another 45€ to pay for my SFR termination charge! OK, I’ve already paid this and I’ll just be getting it back, but it means that I’ll go for another month or so before Orange starts to take anything out of my bank account.

So where does the good luck/bad luck bit come in, you might be asking? Before the young guy left the young lady to sort out my voucher, he looked at the paperwork and said how fortunate it was that I’d come in yesterday. The reason was that I’d not read the small print and the voucher offer terminated one month after the end of the special offer period. And that date was yesterday! So see what I mean 😀

I had to repair the plastic pipe soon after getting home and that didn’t take too much time as it wasn’t that complicated. Here’s a shot showing the repair with the bits of broken pipe that I’d removed lying next to it.

null

All in all I was very happy with the way that things had turned out. If I hadn’t had to carry out the repair that had only cost a few euros and taken just a few minutes to do, I’d have missed out on my 45€ Orange voucher. I think it was well worth it 😉

Surprise surprise!

I forgot to switch my mobile on yesterday – either that or it went off because the battery got too low. Anyway, when I switched it on this morning I found that I’d got about six voice-mails… from the wood man. It seemed that whereas I was expecting him sometime on Saturday, he wanted to deliver straight away! I spoke to him eventually at 10.30 am and suggested he might like to come in a couple of hours time, to give me time to get to the bank, but I forgot that that would have collided violently with his lunch-time! He wanted to come at 11.30, so that didn’t leave me much time to dash up to the cash machine at Rouffignac. If anyone wants proof that when you start to impose unreasonable levels of tax on people you actually raise less tax, they only need to look at France. All of the small tradesmen now insist on being paid in cash, for obvious reasons, and who can blame them 😉

I explained to the wood man how to find my house and he came trundling into my drive-in with his tractor and trailer at about 11.20. I showed him where I’d like it dropped and he was really helpful, reversing his trailer right next to the spot I’d chosen. We set to together and had the 3 stères neatly stacked up in about 10 minutes or so.

null

null

After a short conversation and my paying him, I then had to cover the stack up because we were expecting rain later, possibly early evening or in the early hours of the morning and it would have been daft to get the nice, dry wood wet unnecessarily. Luckily, I just had enough of the thick, black impervious plastic that I made 56NE’s covers from left over to do the job.

So this afternoon I was able to make a start on the new wood store base. The first job is to get the ground levelled off and prepared, which meant taking a pick-axe to it. While I was doing it, the humidity level was chronic and although I wasn’t exerting myself that much, I was wringing wet. In fact, we even had a ‘phantom’ shower from nowhere later on in the afternoon and eventually it began to rain quite hard for a while, causing me to stop work. Lucky that I got the wood covered, eh? Here’s what I got done today – not that much, but it’s a start.

null

I’ve got to make the base a bit high in the front because eventually there’ll be a path there and I can’t afford the floor of the store to be lower otherwise I’ll have water running in. And I don’t want any nasty surprises like that, that’s for sure 😕

Here we go again

Now I’ve made a start on my new wood store, I’d hoped that with the cold weather still being a couple of months away I’d not be under too much pressure to get the work done. But it’s not to be after all. My neighbour, Benjamin, is coordinating communications between several of us and the local wood merchant so that by combining all of our requirements we can order in bulk and get the best price. Well, it’s certainly worked because for 3 stères of dry oak, my price has worked out at 45€/stère, which is very cheap (for more info on choosing and buying wood down here CLICK HERE). Only problem is the wood merchant wants to deliver this Saturday, which doesn’t fit in with my plans at all.

But I have no choice. I’ll just have to take it, stack it up on my grass and find some more good waterproof plastic sheeting to cover it up until my new wood store is ready. I mentioned previously that I’ve done a drawing of what I’m intending to put up and here it is.

null

I’ve since compared my plan to the store that Benjamin already has and coincidentally the dimensions are very similar. His is the same height as I’m planning but at 2.2m deep and 3.3m wide, the other dimensions of his are slightly different. However, mine will have a slightly greater floor area than his and as he has 4 stères of wood comfortably stacked in one side of his, mine should be able to accommodate much the same sort of volume. In fact as shown on my drawing, 4 stères will stack up to a height of about 1.6m in the area I’ve allocated for it, leaving quite a large floor area clear over on the other side where I’ll be able to keep my lawn mower, concrete mixer, rotavator, log splitter and other heavy tools. I’m hoping to put up a few shelves and that there might also be enough room for a small bench so with light and power that I’ll be able to bring through from kitchen on the other side of the end wall, I’ll have a nice bright and airy little workshop as well as a good store for my wood.

Now all I have to do is build it 😕

Another year older

No, it isn’t my birthday – that’s in February – it’s just that this evening I was given to reflecting that whereas this time last year I was seemingly dashing off job after job in and around the house and garden, and some of them quite heavy too, with little by way of physical discomfort to show for it, this year I’ve ‘felt it’ whenever I’ve completed tasks that in comparison have been quite light. Take today for instance. After procrastinating for far too long, I decided that I really must make some progress on improving my wood shelter in readiness for the coming winter. Wim and I had originally planned to fly south to the find the strip where Gordon, who we met at the Cavarc open day, keeps his 1941 Taylorcraft but as the weather looked as though it could be a bit ‘iffy’ for much of the day, I decided that we’d do the flight another time instead. That left me no excuse, so I had to get stuck in. I ended up having a successful day but as I mentioned at the beginning, although the work was not that heavy, I am rather ‘feeling it’ this evening 😕

I had seriously considered just trying to make the existing shelter more weather-proof but always knew that this would be a bit of a cop-out. The structure, if you could call it that, was so ramshackle that any work done on it would have been a total waste of time and effort and would have needed to be re-done all over again at some time in the very near future. So my conclusion was that something much more drastic was the order of the day. Here are some shots of the existing shelter that were taken at various times over the past few months.

null

null

null

There was nothing else for it, it had to come down, so that’s what I started on this morning. First, the side supports, many of which consisted of old branches, for which I suppose I have to thank the previous occupier of my house, starting with the ones I could kick down with little or almost no effort.

null

null

Then the roof supports, some of which I attacked with my chain saw to speed things up a bit.

null

null

And finally, all the other verticals and bits and pieces that comprised the remainder of what truly had to be one of the shoddiest and most pitiful ‘structures’ that I’ve ever come across. In some ways, it’s surprising that it had remained standing for as long as it had done and also the amount of effort that was needed to eventually reduce it to a heap of old wood and sheets of corrugated iron, leaving the space clear under the stairs to my ‘grenier’ for the first time for many years, I suspect.

null

null

I saved any of the wood that I might possibly be able to re-use in any way whatsoever (some to use as a frame when laying a proposed concrete base for the new shelter) and covered it up. The remainder consisting of old, dry wood, I should be able to burn on my wood burner, so I piled that up to one side and covered that up also with one of the old roof sheets to keep that dry too. Afterwards, I thought that the space left looked quite tidy.

null

null

I’ve never seen my house looking like this before and I hope that it won’t stay this way for too long before a spanking new wood shelter begins to take shape to replace the old one.

null

I’ve already got my plans done for the new one and for its framework I’ll use the wood that I’ve still got in my ‘cave’ that I bought two years ago when I thought about making a temporary ‘lean-to’ shelter in which to work on 56NE shortly after I’d bought it, when we had a long period of wet weather. I knew that it had to come in handy eventually 😉

Back in Plazac, back in the air

I enjoyed my trip back to England to see my family, my first in two years actually, but it’s always nice to get back home again, isn’t it. I’d had a flight planned from before I left so I’d been getting quite impatient in the meantime to get airborne again. Here’s a pic showing my intended route in green and the track I actually flew today in red.

null

I planned to fly west from Galinat to Cendrieux, which is just a dot on the map really, and then onwards to the large village, or small town even, of Vergt. I then planned to head south to my next waypoint St Marcel where I would turn slightly left for Moliéres and then turn left again to head up to St Cyprien and back to Galinat. The whole flight was planned to take just over an hour.

I took off at 03.12 pm, later than I would have liked as I’d originally planned to make it a morning flight. Wim has always advised flying in the early morning or early evening and never was this more appropriate than today. The high was only about 23 degrees Celsius and most of the broken cloud that we had today had cleared by the time I took off, so I expected conditions to be fairly smooth. I couldn’t have been more wrong. I experienced turbulence almost immediately after taking off and during the flight, this became quite severe as I’ll mention later.

My left turn out of Galinat took me over La Roque St Christophe and I took the following shot as I flew over it.

null

This is a remarkable place as it’s what might be referred to as a ‘troglodyte village’ in the rock face cut by the Vézère river in prehistoric times. It consists of caves and walk-ways created and inhabited by prehistoric man although at the height I was flying, not much detail of these can be seen. It’s well worth a visit if anyone’s in the area and although this area is full of such places, not all of them have been restored in the way that La Roque St Christophe has and some even, which might be major attractions elsewhere, are just closed off to prevent vandals entering them and causing damage.

Cendrieux came up as planned but as I couldn’t see any feature there worth photographing, I didn’t bother. So the next waypoint was Vergt. I was flying at around 1500 ft and as I approached it, the turbulence wasn’t too bad. Although it was a bit bumpy, I managed to shoot the following series of pics.

null

null

null

null

null

But as I began to make my left turn to head south, the turbulence began to increase quite substantially. There was no obvious reason for this but a few moments after I’d completed the turn, it became very severe. By then, I’d descended to about 1200 ft so I thought it wise to begin a climb to see if I could get out of it. That did indeed do the trick, but not until I’d climbed to 2000 ft where there were still quite a few severe bumps, but nothing like as bad as at the lower altitude. For some reason I also kept experiencing quite violent lifting of my right wing necessitating some very rapid control responses in order to maintain any semblance of level flight.

On my way south to Moliéres, I spotted a very pretty little village which I’ve since found out from Google Earth was Pressignac. Here’s a pic I shot of it, unfortunately while I was still at 2000 ft.

null

My next waypoint was Moliéres, which turned out to be a hamlet on the top of a small hill and I took the next shot as I turned left to head for St Cyprien.

null

As I headed towards St Cyprien, I spotted another interesting village that I would have passed directly over, so I eased slightly south of it and took the following shot as I passed by.

null

Once again, I had to consult Google Earth to identify it, and it turned out to be the village of Cadouin. It is noted for its spectacular medieval abbey, which is clearly visible in the above shot (the large walled structure). My last waypoint was St Cyprien, which I’ve flown by and taken a picture of previously, but from a different direction, so today I took another, below.

null

Although Galinat should have been only another 11 minutes or so further on, whenever I approach the airfield from the south-west, I always have difficulty spotting it. And today was no different. My solution is always to head for Thonac and then turn onto a heading of 151 degrees, which is a straight-in approach for Galinat. Sure enough, the trick worked again today and I was soon set up for a landing. But not without a few bumps yet again, which made things tricky enough to call for quite a high level of concentration.

The flight lasted for 1 hour 10 minutes and was, I think, the most turbulent that I’ve experienced since being here. There’s an old saying that ‘it’s better to be on the ground wishing you were flying than to be flying wishing you were on the ground’. It wasn’t quite that bad today, but the bumps and turbulence did rather take the edge of what should have been a really enjoyable flight. But any flight that you land and walk away from is a good one, they say, so I guess today’s was one that just has to be put down to experience 😉

Cavarc ‘Porte Ouverte’

That’s an ‘open day’ in English, and that’s what was going on today down at the Aéroclub de Castillonnès at Cavarc. So we all decided to go. Victor, Madeleine and Sophie said they’d go by car but if possible, Wim and I wanted to fly in, of course. However, the weather has been a bit unstable for the last couple of days so there was no guarantee that we’d be able to make it, but despite a forecast for occasional light showers and even the possibility of a passing thunderstorm, we decided to give it a go.

The plan was for Wim to fly into Galinat in the Red Baron at midday and for us both to go in 56NE, but I could see that although Galinat was clear, there was a heavy shower over Plazac at that time. So it was several minutes later that Wim came into view and landed.

null

null

I’d planned the flight to Cavarc via Beaumont and as we approached the latter we had both been keeping an eye on a very active storm cell a few miles off to our right. We’d passed Belvès airfield off to our left a few minutes before and when we saw lightening jumping from the storm cloud to the ground, we both decided that as we couldn’t see exactly how big the cell was in the direction that we wanted to fly, it would be a good idea to make a precautionary landing at Belvès and wait for a few minutes on the ground to see what happened. So that’s what we did, switching the engine off some 30 minutes after leaving Galinat.

The edge of the cell didn’t actually touch us at Belvès but we could see that it was dark looking and very vicious. After 20 minutes on the ground, we decided that it was safe to take off again and continue our journey but even though the edge of the cell had passed through several minutes previously, we were surprised by just how much we were thrown about during the climb out. 20 minutes later and we were at Cavarc to find the airfield bathed in glorious sunshine. We were told that the storm had passed through there, though. Here’s a shot of 56NE parked up next to the hangar and a locally registered Sky Ranger

null

Victor told the Club what had happened and they were kind enough to have delayed things a bit to wait for us to arrive. Here’s a shot of the group under the trees for the splendid meal laid on by the Club for just 10€ a head.

null

The flight line shown in the pic consists of a beautiful Colibri biplane, a Rans Coyote, a very pretty little Jodel and a 1941-built G registered Taylorcraft owned by Gordon, a Geordie lad who has retired down here much the same as me. I took loads of shots of all of them, together with a Sky Leader that had been flown in from Monpazat by the French Rotax and Sky Ranger/Leader distributor but for some unexplained reason, none of them were saved by my camera to the memory card! I am so disappointed because a unique opportunity has now been lost to photograph some unique and lovely aircraft, especially the Taylorcraft, Jodel and Colibri, all together in the same place 🙁

There was a terrific turnout of people supporting the Club and the final two shots are of the group just after they’d eaten and my great bunch of friends, Sophie, Madeleine, Wim and Victor, all smiling in unison 😀

null

null

That’s Gordon on the far left of the last shot, partially hidden by the tree. He told us that he flies from a small airfield further south down near Fumel, and its owner was also there. He said he’d have no objection to us flying in, so that’s on the to-do list for when I get back from England in a week or so’s time. That’s something to look forward to.