The beginning of the end?

Or just the end of the beginning, to paraphrase Winston Churchill’s immortal words? OK, a lot has been done but there’s still a long way to go before the house is finished and ready to be handed over. No electrician today, just the plaster-board workers who finished getting all of the plaster-board up everywhere in the house and cleaning up behind themselves before they left around mid-afternoon.

Another worker, I don’t know if he was a member of the same team, was also on site early on but had disappeared later. His job was finishing the walls and ceilings off by taping over the joints in the plaster-board and skimming plaster over the nail heads that had been used to fix them to give a flat surface ready for decorating. He left a lot still to be done as the following pictures show.

First the now standard shot taken from just inside the front door.

null

The next two shots were taken from in the living room looking back towards and then past the kitchen. With all of the walls now up and all of the rubbish gone you can get a feel for the size of the spaces in the house for the first time. I’m very pleased with the results and think the spaces will be very comfortable to live in.

null

null

Now two shots of the kitchen taken from each direction.

null

null

The next shot shows the alcove that will become the cloaks cupboard with the separate WC beyond.

null

Here’s the ‘cellier’, or utility room.

null

The next shot shows the bathroom. The far corner will contain a walk-in shower (what’s known as a ‘douche italienne’ here) with a washbasin between it and the WC along the same wall. I’ve kept it pretty simple and they’ll just be a mirror-fronted cupboard like I had at Plazac (I had two actually) on the wall opposite the basin for toiletries, shampoo and all that stuff.

I intend to keep all my cleaning products in the kitchen and/or utility room and there shouldn’t be a need for a heated towel rail as towels should dry easily in the summer and in the winter the room will be under-floor heated by the heat pump. That’s my hope anyway.

null

Now three shots of the bedrooms in order bedroom 3, bedroom 1, bedroom 2.

null

null

null

Next are a couple of shots up and down the corridor.

null

null

And to finish off, a longer shot from the living room looking down the corridor past the kitchen.

null

I don’t know what the plans are for tomorrow. I assume the plaster-finishing man will be along but I don’t know about the electrician who has a lot of work still to do. As will I have when he’s finished, because it’ll be my job to install and connect all of the ceiling lights – all 41 of them!

Coming on fast

Today saw another great leap forward with the interior of the house. The electrician arrived early at about 8.15 am and I nipped up to tell him about needing to move the plug points that I mentioned in a previous post. He said that putting them to one side of the appliances they were for was usually OK and I said that it wasn’t for me.

I referred to the dishwasher and asked how on earth was I supposed to plug it in with the fitted cabinets in place if its power point was behind the adjacent cabinet and over half a metre away? He got the message and said it wouldn’t be a problem moving all three of them.

I also said that I’m probably going for Indesit appliances and whereas I can buy an under-counter Indesit fridge in the UK, there’s no such thing in France (true). The only Indesit model I could fit in is 142cm high, so it would mean shortening the worktop and making it free-standing in the corner.

In that case as it stands, it would cover the power point that he’s placed in that corner above the counter. He understood that too (he’d marked the wall out to show where the various appliances and power outlets would be) and said that he’d move that over as well.

I popped my head into the house at lunchtime and while I was there I told the plaster-work team about the mis-positioned walls. They didn’t like it and said that they’d worked to the builder’s plan. I said that I’d given them a print of my plan as I’d designed the house and highlighted the importance of getting the measurements dead right, especially at the bedroom end wall. They said that the difference was all down to the angle, which was just plain silly.

I said that anyway, it wasn’t worth arguing about because I’d worked out over the week-end how to cope with the difference in measurements but I emphasised that if I hadn’t done so and couldn’t get my kitchen units in they’d have had no choice but to move the wall. End of.

I then had to leave and was away for the afternoon checking out kitchen stuff at Brico-Depot. I’ve now definitely decided I’ll be sourcing my kitchen furniture from there, as I did for my old house at Plazac. Their stuff is of high quality and their marketing is second-to-none in my opinion.

As well as having several models on display incorporating many features and accessories, they also provide a 12 page leaflet covering every model, worktop, accessory, component, finishing piece etc that they offer together with the price of every single item. This means that while you’re making your choice of model you can also do detailed calculations showing exactly how much to the centime your choice will work out to.

Having obtained the information I needed, by the time I got back to the house the workers had all left and unfortunately the light was beginning to fail. Nevertheless I managed to get several usable shots showing the progress that had been made, with several walls now being full double-sided, enormous strides made with the wiring for the lighting throughout the house and the cable bundle now hanging down in the ‘cellier’ ready to be connected up to the breaker box.

First some general shots of the living room showing the mass of cabling now hanging down for the ceiling lighting. The electrician is a bright spark, if you’ll excuse the pun, because he showed me how he’d marked out the positions of the spots (and therefore the ceiling holes) on the floor and then used a laser to project them up onto the ceiling. Very clever, and it meant that the ceiling positions and lighting pattern were exactly right. You could say ‘spot on’ ahemm…

null

null

null

Now a couple of shots of the kitchen showing the lighting cables and in which you can make out the moved power outlets.

null

null

Here’s a shot showing the kitchen lighting cables (seven of them) in more detail.

null

The next two shots show the ‘cellier’ (utility room) and the huge bundle of cables hanging down in the far left corner ready to be connected to the main breaker box.

null

null

The next shot shows the lighting in bedroom 3. Both of the other bedrooms have the same number of ceiling spots and are therefore similar.

null

The final shot shows the ceiling cabling in the bathroom. There are four spots and also visible is another hole in the centre of the left-hand wall. This is for ventilation and there are also similar vents in the kitchen, utility room and the separate WC.

null

Only the kitchen vent has a switch and my guess is that the other three will be working non-stop. This makes sense because the main living spaces (the living room and the three bedrooms) will be constantly ventilated by way of the system mounted in the roof space and slots in the tops of all of the double-glazed widows and doors.

So that was it for today. I’m happier and more relaxed than I was over the week-end as I now know precisely how I’ll be installing the kitchen cabinets in a way that will give me exactly what I want. And as a result of my discussion with the plaster-work man who showed me what he had discovered, it now appears that the living room end of the house is about 10cm longer than the plan, so my house will end up being slightly bigger and even more value for money than I originally thought it was 😀

Disaster struck

My priority today was to try and see if the problem concerning the mis-positioning of my kitchen walls could be resolved without tearing them down and rebuilding them. My plan was to drive to Brico-Depot before they closed at 1.00 pm to take detailed measurements of their base units as I’d done yesterday at Brico-Marché in Le Bugue and pick up any other information that might help. But it was to be thwarted.

I was quietly drinking a cup of tea mid-morning and thinking about my plan of action when there was an almighty thump and when I looked up I couldn’t see out of my caravan window because it was blocked by the roof of one of my ‘tonnelles’. I knew that high winds had been forecast for today with strong gusts so I’d made preparations accordingly by opening the curtains of my ‘tonnelles’ so the wind could blow through them rather than against them. But it appeared that this wasn’t enough this time.

Moments before there had been a huge gust which had snapped the ties of the ‘tonnelle’ concerned, picked it up, turned it over and hurled it against the side of my caravan. When I tried to get out to see what was going on I couldn’t because the force of the wind was so great blowing the ‘tonnelle’ against the outside of my caravan door that I couldn’t open it.

I managed to however, when the wind dropped slightly and this is what I found although the pictures were taken after I’d removed the ‘tonnelle’s’ side curtains which were being blown in the wind and risked being further damaged and moved the framework away from my caravan.

null

null

null

null

null

As can be seen, several parts of the framework have been broken exactly as had occurred almost a year ago when the same thing happened with my original ‘tonnelle’. However, I’m a ‘glass-half-full’ kind of a person and as I’ve never got around to disposing of the parts, damaged and otherwise, of the original ‘tonnelle’ I decided to go and see what I could find. Here’s what I managed to salvage.

null

The bundle shown above contains just about everything I need to repair this ‘tonnelle’. Some of the parts are a little bit rusty from where they’ve been left outside for so long but that won’t matter. There’s also a part of this damaged ‘tonnelle’ that I don’t have a replacement for. However, it’s straight and the damage it’s suffered is only slight in the form of a crack in one of its welds. The crack is actually a bit rusty so it might have been there before today’s incident, so I don’t think it will be important.

It’s still blowing a hooley out there so I’ve added another extra strong tie-down to the second ‘tonnelle’ which is weathering the storm quite well despite the wind trying to rip its roof off. I can’t do anything more for now until the wind drops fully after which I’ll have a go at getting the damaged one back into some kind of shape as although I think there may be a few nicks in its fabric, its condition otherwise doesn’t look too bad. Getting the framework upright again without doing any more damage will be quite a challenge, though.

I didn’t end up making it to Brico-Depot of course, which means that I’ll have to ‘wing’ my decision about the mis-positioned kitchen walls. However, this afternoon I’ve been carefully checking the geometry by drawing a series of very detailed drawings and I think that I can get around the problem when I fit my kitchen units without too much effort. I hope I’m right because after tomorrow I doubt there’ll be another opportunity to return to the issue 🙁

Oh dear, more problems

When the plaster-work men started working on the interior of my house we had a conversation about the kitchen. I emphasised to them that the dimensions had to be precise because I’d planned them so standard size kitchen units would fit exactly into the spaces. I even went so far as to do a print of my original plan on my computer which I gave them to refer to.

So you can imagine my dismay when I went around and checked all of the measurements and found that ONLY ONE was actually correct! But that’s not the worst part.

One of the kitchen walls, the one along which I plan to have the oven, hot plate and fridge, is offset into bedroom 3. The size of the offset is not random – it was carefully calculated to allow the fitted items, the oven and the fridge, to fit under the worktop with the proper amount of worktop overhang in the front, and the hot plate to go on top with a proper amount of worktop around it on all sides.

Standard under-worktop units are 57cm deep and items like the oven and fridge need all of that. So I decided on a worktop depth of 60cm which means that the wall has to be offset by the same amount, or even just a bit more, and that measurement is critical. But see the image below. When I measured it I found it to be only 58cm.

null

So that was when I went around and checked all of the other dimensions and the image below shows what I found. Only one, the wall marked B in the image below, to the right of the sink, is of the correct length. However, because the length of the run in which the sink unit will be installed is 6cm too long (166cm compared to 160cm) it means that the wall B has been placed 6cm too far to the right, into the living room.

null

And there’s more wrong with wall A. As the wall offset is 2cm too small, it means that the wall has not been set back far enough into bedroom 3, but as well as that, it’s also 2cm too long at 284cm rather than the 282cm it should be (not shown in the above image). I can live with that difference but I’m not sure about the 2cm difference in the wall offset and hence the depth of the worktop.

I’m having to see how much can be trimmed off the backs of the frames of the base units yet still leave enough space inside to accommodate the oven, fridge and hob unit while still having a reasonable front overhang. When I say ‘reasonable’ I’m only talking about 1-1.5cm which isn’t reasonable at all really, because so as not to look weird, it’ll have to be repeated all around the kitchen.

Today I went to Brico Marché in Le Bugue to check out the exact dimensions of their base units as I’m (slightly) interested in one of their models. Tomorrow I’ll do the same at Brico Depot, but if things go pear-shaped I’m afraid that the plaster-work boys (and Didier and the builder) will be told on Monday that they’re going to have to take down and move a wall because there are limits to how much I can, and will, compromise with my kitchen.

But sadly, that’s not all. When I looked at the photographs that I posted yesterday I noticed something that I hadn’t been aware of before. Whoever prepared my house’s technical plan has obviously never previously designed a kitchen because the outlets for the under-worktop units have been specified in completely the wrong places ie behind the units to the side of the ones housing the appliances.

Take a look at the next shot which shows the outlets for the oven and hob units and where they are in relation to the wallspace (in red) at the rear of the units in which the units will be housed.

null

OK, so what does this mean? It means that when the base units are secured in place and you come to install the appliances there won’t be any access to plug them into their power outlets as they’ll be behind the base unit next to them. I’ve shown in the above image by how much the electrician will have to move them on Monday.

And the following image shows how the same has occurred with the power outlet for the dishwasher – except this time the error is even greater!

null

It’s a pretty fundamental error and it’s a pity that I didn’t spot it previously when I was scanning the technical plan. It won’t take much to move the cables but even though the existing holes will be hidden behind the base units when the latter are installed, I think I’d still like them to be patched up.

‘Sparks’ did well

‘Sparks’ is what we call an electrician in Britain. He started at around 9.00 am as usual and the two-man plaster-board team only turned up today for a short while to give him a clear field. And he needed it because he was everywhere, including up in the roof-space, as the following pictures show.

I didn’t take any photos at lunchtime because I had to go out to get hold of a few things, including a 5 x 4 metre plastic tarpaulin. I needed that because I wanted to move the interior doors out of the house today and my plan was to put them in one of my ‘tonnelles’ double wrapped in the tarp so even if any rainwater did blow in there, it wouldn’t stand a chance of wetting the doors.

The first thing I saw when I went up to see how Sparks was doing was the cable for my satellite dish that he’d drilled the wall for and poked through. He said that he would to save me climbing a ladder and crawling around in the roof space myself but I didn’t expect him to do it today.

null

First off as usual, a general shot from the living room.

null

Next the TV corner. We had a short debate on where to site the plug sockets – close to the front wall or further away towards the middle of the section of wall. After umming-and-ahhing for a few moments we decided on a compromise 🙂

null

Now a view from the TV corner towards the kitchen showing the cables that have been poked down from the ceiling in that area alone.

null

Another view back towards the corridor leading to the utility room, bathroom and bedrooms showing yet more cables.

null

The kitchen wall showing the cables for plug points, the fridge, the oven, the hob unit and the cooker hood that will vent to the outdoors through the roof.

null

The view straight up the corridor towards the bedrooms. Insulation-come-sound deadening material has now been placed in position along the right hand side as viewed ready for the plaster-board to be attached along that side.

null

Looking back through the kitchen door at the wall on the opposite side showing the cables for two plug points, a light switch and the plug point for a dishwasher. There’s also another low level plug point on the right which can’t be seen as it’s behind the doors leaning against the right hand wall.

null

Now the ‘cellier’, or utility room. The washer-dryer combo will be on the right against the outer wall and there will also be lots of storage and other stuff that I’ll go into in more detail in another post. It’ll be great because I had no such thing in my old house in Plazac and it was a total nightmare just because of the lack of storage space alone.

null

The next two shots show bedroom 1 and the alcove space it contains in which I’ll be building full-height wardrobes and storage cupboards.

null

null

Now the same again – two shots of bedroom 2.

null

null

And now bedroom 3.

null

And finally two shots in each direction up and down the corridor.

null

null

I also received some excellent news today. As regular readers will know, the cables and water pipes were put into place before the the concrete floor slab was laid so are now pretty much fixed in place with additional ones being hard to do. I recently asked whether as I’ve now decided to build a garage-workshop in front a cable could be laid to supply power to it ready for when it’s built and was told that this would be OK.

Today, while the electrician was there, I asked whether the same again could be done to provide a power cable at the back of the house that I could use to run a small swimming pool pump. That’s more challenging because it would mean a cable being pushed through under the house from above and someone then going into the space below to bring it out at the back.

It would be an ‘extra’, of course, but my view is that it would be better to do it now, during the build, than to leave it to afterwards. The electrician, fine chap that he is, said that he would be able to do it, so I can look forward to having a proper little semi-above-ground swimming pool (what’s called ‘hors sol’ in France) to languish in during the hot summer months when I’m not slaving in the garden. And if the worst comes to the worst, it could always be used for some fancy lights on the terrace 🙂

Shaping up nicely

The interior of my house is looking more and more like an interior now the internal walls are going up. The walls and the doors as well as the windows seem very high but that’s because the floor is low and will be raised by something like 3 inches (7.5 cm) when the second layer of concrete is poured as a screed to completely level the floor and the floor tiles go down.

When I went up to take a look at progress half-way through the day all of the doors bar one had been installed and a good start had been made on putting up the internal partitions that will form the interior walls. When all of the doors are in I’ll then have to remove them from the house to ensure that they won’t be damaged during the work that follows.

As yet none of the internal partitions have had plaster-board fixed on both sides because several will have cables fed down through them from the ceiling and from the unopened rolls that are standing around, I assume that insulation will be inserted between the wall surfaces as a sandwich that will also act as sound deadening. Here are the shots that I took at lunchtime.

null

The next shot was taken looking across the kitchen with bedroom 3 on the other side of the partition.

null

The following shot was taken looking towards the bedroom end of the house through the utility room and bathroom. The coloured heating pipes sticking up in the foreground will end up being in the back of the cloaks cupboard.

null

The following shot was taken looking into bedroom 3 with the kitchen beyond.

null

null

null

null

It was dull and wet all-day today and by the time that I went up to check on progress after the workmen had finished it was really dark inside the house. Although there’s a power socket available in my ‘coffre de chantier’ (site electric box) that I installed before work began on the house, these guys haven’t been using it and I’m thinking that they could hardly be seeing what they were doing by the time they finished work in the late afternoon.

For some reason I can’t get my phone camera flash to work either and many of the shots that I took were unusable as a result. The ones that follow below are heavily edited and of rather poor quality but are the best of the bunch.

The first was taken from the middle of the living room and shows the door into the separate WC behind the front door with the cloaks cupboard beside it. I will be fitting a pair of bi-fold doors on the latter with a shelf inside.

null

The next one is from the living room looking down the corridor towards the bedrooms. All of the doors are now installed and have been removed ready for me to take them out to keep them safe.

null

The next shot was taken from inside what will be the bathroom looking across to the entrances to bedrooms 1 (farther doorway on the left) and 3. Bedroom 2 is on the left of the position from where the photo was taken.

null

Next is a shot taken from inside bedroom 1 looking out across to the doorways of bedroom 2 (on the right) and the bathroom.

null

The next shot was taken from the kitchen looking out through the opening (that will stay open) into the living room. I wish now that I’d specified a curved/arched top to the opening but I was told that it’s now too late as they would have needed to cut the plaster-board to shape before fitting it.

null

And finally a general shot looking back from the living room towards the corridor leading to the utility room, bathroom and the bedrooms.

null

Although the interior still has a way to go, it’s beginning to look remarkably like the ‘walk through’ that I did of my computer model. When it’s finally completed it’ll be interesting to do a proper comparison.

The plaster-work duo will be back tomorrow as should be the electrician. The latter will start on installing all the cabling for the lighting and power points and will need to climb up into the roof-space. While he’s there I’ll also ask him to drill a hole through the southern-facing wall for my satellite cable.

It shouldn’t come as a complete surprise to him as we discussed it the last time he was here. I assembled the satellite dish today so we can work out exactly where the hole should be with the dish as close to the roof corner as possible without breaking above the roof line. If he doesn’t want to do it I’ll just grab my drill and ladder and do it myself 😉

Getting it done

First off, I managed to resolve my dilemma by just saying that I thought I’d spotted a problem yesterday with one of the electrical cables. The guy in charge of the plaster-work just said that on his drawing the cable is shown as containing the wiring for both a plug point and a light switch and that it would be up to the electrician who is due to return on Friday to make sure that they are each at the correct heights. So that was that one sorted and we’re able to keep our little secret concerning the key 😉

He said that they’d start putting the doors in today and when I went up to have a look at progress at lunchtime I found that they’d been marking out the positions of all of the partitions that will make up the rooms and had started on the kitchen door. They’d also cut an access into the roof space in the utility room ceiling as they’d said they would do a few days ago.

null

This is the far, bedroom end of the central corridor.

null

null

null

null

null

A gap of about 2 cm has to be left below each door to allow for ventilation I was told, so the above images show what the combined thickness of the second concrete layer plus floor tiles will be. They measure the floor to ceiling height downwards from the ceiling so the thickness will become greater approaching the bedroom end of the house, especially in the outer corner of bedroom 1.

I had to go up to the house mid-afternoon to discuss a small problem with Didier concerning the electric cabling for the heat pump. The original plan was to enclose it in the wall of bedroom 2 (see the far corner in the above image that hasn’t yet been plaster-boarded) with the heat pump being positioned outside on the back corner of the house.

However, apparently there’s now a regulation that says that the heat pump cabling has to be ‘accessible’ so the builder has recommended moving the heat pump to the centre of the bedroom wall and running the cabling up into the ceiling in the corner of the space that’s being created for fitted cupboards in bedroom 2. This is the only alternative as it clearly can’t go outside the wall in the other corner where it would be a visual eyesore, so I’ve agreed to it.

After we’d finished talking I took the next couple of shots showing the progress that had been made with the walls and doors since the morning.

null

null

And finally, here’s the situation at the end of the day.

null

null

null

null

null

null

The next view is looking across the kitchen out into the living room.

null

If the electrician is due back on Friday, the two guys doing the plaster-board work must expect to be finished tomorrow. And I won’t be surprised if they are the way they are going 🙂

More solid progress

Still working on the walls and making slow but steady progress. I’ve been left with a dilemma which I’ll go into at the end of the post. The first shots show the situation as at lunchtime today.

null

null

null

null

null

null

The next shot shows the thickness of the insulation that’s being put into the walls and now I see why the door and window frames all protruded so much into the house’s interior and when they marked out the floor so much interior space was being given up.

null

The next batch of shots show that at the end of the day all of the insulation had been put into place together with most of the dry lining board. The site had also had a good clean and tidy-up.

null

null

null

null

null

And now we come to my dilemma. I noticed this evening after the workmen had left that they’d made a small error. Two cables emerge where the heads of the beds will be in bedrooms 1 and 2, one of which is a plug point and the other a switch for the main room lights.

The plug point needs to be low-level but the light switch needs to be higher so it can be operated while you’re in bed. You can see what I mean in the following image.

null

Here’s my dilemma. If I don’t tell the workmen they could make the same mistake in bedroom 2 and then both bedrooms will need to be rectified. If they have by then applied any finish to the walls, this could be even more difficult, and possibly unsightly even, than if the problem is brought to their attention now.

So far so good. But what’s my dilemma? If I tell them they’ll know that I’ve been into the house after they’d left and that to do so I must have a key, which I’m not really supposed to have. But I do have one as I had a copy made over the week-end when I moved my doors into the house. Now d’you see the problem? 🙂

Now the walls

The two workmen arrived at about 9.00 am and got cracking straight away on the interior walls. I went up to see them shortly after they’d started and asked how they were doing. They replied, ‘No problem’, I said that those were the words I wanted to hear and left them to it.

They had made a bit of progress by lunch time as the following shots show.

null

null

null

I went up again to see how they’d done at the end of the afternoon and found that they’d managed to get quite a bit more done. It isn’t just a matter of getting the dry-lining boards up. The insulation also has to be carefully measured, cut and installed before the boards are put into place.

null

null

null

null

null

null

null

null

It looks as though putting the walls up may take a little bit longer than I originally anticipated. However, I’d prefer to have a slower good job rather than a quick bad one and it looks pretty good so far. I’ll be interested to see what progress is made tomorrow 😉

The doors

No, not the 1960/70s rock group (Jim Morrison, Riders on the Storm and all that – dates me, eh…) but the ones I recently acquired to have installed inside my new house. After I’d picked them up from Leroy Merlin a week or so ago in the van I’d hired, I’d dropped them off in the barn at Malbec in which I have my aircraft where they’ve remained ever since. Here are a couple of shots of the front and back of one that I took at the time.

null

null

The doors are supplied already hung in their door frames complete with locks ready to be installed.

null

null

The workmen who are installing the interior ceilings and walls would usually install the doors at the same time but as I cancelled the ones that the builder would have supplied, installation of interior doors has been excluded from the contract. Nevertheless, as they need to make the apertures in the partition walls of the correct dimensions we agreed that I’d drop a door round as a reference for them to work to.

I’ve now come to an arrangement, as I expected I probably would, for them to install all of the doors for me. It makes sense as they’ll do a better job than I would and it will also be one less job for me to do as I’ll already have enough of a list when I move in. When they left yesterday they left me the key for the house so I could put the doors inside so this morning I went round and picked them up three at a time in my large trailer.

Getting them in and out all by myself was a hefty job and as I was lifting the last one to carry it into the house something ‘popped’ in my left elbow. It was quite painful and my arm became quite weak afterwards but here are some shots that I took anyway starting with the last two in my trailer before I lifted them out to take them indoors.

null

null

And now all of the doors inside ready to be installed, although they’ll have to be moved before they are so the interior walls can be put into place.

null

null

When I dropped the doors inside, I also noticed that as well as putting up one horizontal support bar all around the interior walls, the workmen had also marked out the floor to what I suppose will be the full width of the walls including insulation. I have no idea what the second line is for.

null

null

The weather’s still great and I’m planning on doing the second brake on my Savannah tomorrow. Until then I’m just going to be giving my elbow a bit of a rest 🙁

Early wrap

The two-man team working on the interior arrived at around 9.00 am and got cracking on filling the small hole in the ceiling left over from yesterday, sealing the gaps between the ceiling and the walls with foam and putting the metal framework up that will hold the insulation and support the dry-lining that will make up the interior surfaces of the external walls.

However, something must have happened, maybe a problem on another job that needed their attention or something like that, because they abruptly locked up and left for the day just before noon. They left all their tools behind and told me that they’d be back on Monday as usual so that was an early wrap for work this week.

The pictures I took show that they only put up one horizontal wall bar around the whole house before leaving for the day.

null

null

null

null

null

In the next shot, that’s one of my new doors leaning against the wall over on the right. They said they’d like to have one for when they start working on the interior partition walls, so they can get the doorway aperture dimensions exactly right.

null

null

null

null

null

null

Here are a couple of shots showing how they’ve sealed the ceiling edges.

null

null

I’m really pleased with their work. The quality is excellent. The whole ceiling surface is really level and there are no joint gaps as far as I can see between any of the sheets. If the partition walls are of the same standard the completed interior will be amazing 😉

Surprise, surprise!

It turns out I was wrong. Work on my house is to continue without delay and when I went up to check just before 9.00 am this morning to my surprise one of m+ matériaux’s large delivery trucks was already there and about to be unloaded.

null

As usual, it only took one man and a Hiab to do the job and it didn’t take him very long to remove all of the materials from the truck and have them stacked neatly on the ground to the front and side of the house ready for use.

null

null

null

null

The materials were for the ceilings, the inner surfaces of the main walls and the internal partitions and before the driver had finished unloading the truck a small team who were going to do the work had turned up. I had to nip out and when I got back the team had been reduced to the two men who’d put up the ceiling supports a week or so ago.

I left them to it and shortly before they left for the day as the end of the afternoon approached I took the following shots of their handiwork.

null

null

null

null

null

null

null

null

So in a bit less than a day all of the ceiling board had been put up. There was just a small area left and I think they intend to use the piece that they remove to make an access to the roofspace in the utility room to fill it, but I don’t know for sure.

So progress was pretty quick and when I asked him the elder of the two workmen told me that it would probably take eight to nine days to get the whole interior finished off. I guessed about a week in my last post so it seems that although these guys are pretty quick, I was still being a bit overoptimistic 😉

I’ve gotta roof

At last. The roofers returned this morning to finish off the roof by filling in the hole they’d left over bedroom 1 and adding the edge tile that was missing at the living room end where they’d run out of tiles the last time they were here. I was very pleased with the results and although the weather is fantastic at the moment and no rain is forecast within the foreseeable future, it’s nice to know that the house is fully waterproof. Here are some shots that I’ve lifted from some drone footage that I shot today.

null

null

null

null

null

I’m really pleased with the next shot. One of the main problems that I originally had was that the roofers had fitted the roof structure too far forward on the house’s walls and because of the way the builder had designed and cut the roof joists there was almost no roof overhang on the back of the building.

I’d designed the overhang to be the same all round and after the modifications the builder made a few days ago, the next shot shows that they’ve achieved that as near as dammit.

null

null

null

null

null

So the next stage is the interior. My guess is that the contractors who will be putting the walls and the interior partitions in place are busy working on another contract. If so, I hope they’ll be along shortly because it’ll be interesting to see how long it takes them to do my house’s interior. I’m guessing a week. Any bets anyone? 😉

Trying to get back to flying…

But it’s difficult. My Savannah lost its brakes (again) last year due to the summer’s intense heat and although I got them back again by the autumn I was reluctant to fly it because they were still very poor. In fact they’ve always been poor ever since I’ve owned the aircraft. I’ve been told that they should be able to hold the aircraft on the flat at full power, but that’s never been possible and I guessed that this was because the disc pads needed changing.

I obtained a new set last November but mainly due to issues associated with my house-build, I was unable to fit them at the time. It then became too cold to do the work as I’d have had to work in the open barn, so the new pads have been in the back of my car ever since. Anyway, now that the afternoons are warming up I managed to get myself organised enough to get cracking yesterday. Due to the learning curve involved, I only managed to get half the job done and I’d have liked to have done the second wheel today.

But I haven’t been able to because I’ve had to sit in all day waiting for a delivery from DHL which, at the time of writing, still hasn’t arrived. I can tell you, I’ll be very annoyed if the Ebay Global Shipping system fails to deliver and makes me wait in for a second day.

I’m waiting for a satellite dish to arrive from the UK. I wanted an oval one and couldn’t get one here in France and in any case, even with carriage from the UK and an import surcharge of over £10, it was still cheaper to source a dish from there rather than from a local supplier.

So to fill my time while I was waiting I thought I’d go up and have a clean-up in the house. The floor was filthy, which was not unexpected given the amount of work that’s been going on and with none of the workers involved wanting to spend time wielding a broom. So I did it myself with the windows and doors all wide-open and here’s how it looked afterwards.

null

Since taking the picture I dumped all of the dust and rubbish into a black bag to be disposed of later and also removed all of the stickers from the glass of the windows and doors. I also took some pictures of the roof space.

First, the bottoms of the large vent that will be connected as the extractor from the septic tank system and the smaller vent beside it. I don’t know what the latter is for, possibly it’ll be a vent over the kitchen, but I don’t know for sure.

null

Now the house’s ventilation system. As I understand it, this will be running the whole time and circulating fresh air through every space in the whole house.

null

The next shot shows the bottom of what I think will be a vent over the separate WC.

null

And finally, I was recently contacted by Enedis who are keen to connect up the house for electricity but it can’t be done until the house is finished with it’s electrical system fully installed and the latter having been officially inspected and approved. Only the builder knows when this will be so I referred the matter to them and have since had it confirmed by both Enedis and the builder that this will be on 29th March.

This is excellent news because Enedis must have a firm commitment for the date as otherwise they will render a penalty charge for which the builder will be responsible. So whether this means that the house will look like the following image by that date I’m not sure, but I reckon it should be pretty close 😉

null

Vent pipe

We were talking about the vent pipe that’s been installed in the rear of the roof and which sticks up rather obtrusively above the roof ridge line.

null

null

I have to confess that I didn’t know what it was for and thought that it was perhaps something to do with the ventilation system that is now hanging in the roof space waiting to be connected. But I realised I was wrong when I came across the following image.

null

So it appears that it will be used to connect the secondary, or extractor, vent of the house’s proposed ‘fosse septique’ (septic tank) waste water disposal system and one of the two smaller vents in the roof, the one below it, will be the primary inlet vent. According to the image the secondary vent has to stick up 40 cm above the roof line so although it’s a bit of an eyesore at least it’s nice to know that my house will conform to all of the latest regulations 😉

Going international

It’s official. My Trike has now gone international. Well, it has been I suppose ever since I came to live in France, but if you check out the top right-hand corner of your phone or computer screen there’s now a language flag and if you click on it there’s a drop-down that will allow my French and Dutch friends and neighbours and other visitors to the site to read My-Trike in their own language.

null

null

null

It’s a plug-in that uses Google Translate to automatically translate the WHOLE web site, not just the page that’s being viewed. OK, the translations are done by AI, ie by machine, but it looks to me as though they’re pretty good actually although I’m not sure that ‘Mon tricycle’ (see last image above) is the French translation of ‘My Trike’ that I’d have gone for given the chance 🙂

Isn’t technology fantastic. I’ve included French, Dutch, German, Italian, Spanish and Portuguese but many others are available if I activate them. Chinese or Arabic anyone?

Proper job

It had been a cold night with quite a heavy frost but the roofers were back on site this morning at around 8.00 am. When I looked out of the caravan a bit later, a ladder was already up against the back wall of the house and they’d already removed the shuttering put in place by the builder’s ‘maçon’ two days before so they could get cracking on sealing the roof with the waterproof plastic membrane and fitting the tiles.

null

null

null

null

null

With the plastic membrane in place and fully secured by vertical laths nailed to the roof joists they could then go ahead and attach the battens on which to hang the tiles. One of the men had already replaced the front edge tiles at the living room end and they began hanging the new tiles on the back of the roof starting from the same end.

null

Once they’d started hanging the tiles one of the men attached the new edge tiles on the front of the roof at the bedroom end while another prepared the metal trays to be installed in the valley of the join in the angle of the roof.

null

null

The gent in the orange overall trousers seemed to be in charge providing the supervision of the other workers that I think was lacking the last time when they messed up fitting the roof too far forward, but that’s just my own opinion.

null

null

null

You can clearly see in the next pic how the overhang on the back of the roof at the living room end matches that on the front, which was far from the case originally.

null

null

null

They hung the tiles starting from the bottom and as they proceeded, one of the workers began to cut back the new tiles on the back of the ridge with an angle grinder ready for ridge capping pieces to be added later to complete the structure.

null

null

null

By mid-afternoon the living room end of the roof was completed all bar one edge tile and the ridge and the team had also made good progress on the bedroom end. Work had also begun on creating openings in the tiles for the house’s ventilation system.

null

null

null

null

null

null

In this shot you can see the white round polythene ventilation tube being put in place on the front of the roof over the separate WC.

null

null

In the next shot the holes for what I think are the main air inlet pipe and another vent are also visible on the rear of the roof.

null

And that’s about as far as they got, so they’ll probably be back tomorrow to finish off. The last few shots show the roof as at the end of today.

null

null

null

null

null

I’m really happy. The roof is now an enormous improvement on what was there before and I’m only glad that I was on site to make sure that the builder wasn’t able to continue will-nilly with it as it was. The house’s general appearance would have been very badly affected and it would have been much too late to do anything about it if that had happened.

Only in France

I picked up the internal doors for my house today from Leroy Merlin. They have an excellent system. You arrange a time for the pickup and they have the goods ready to be brought to your vehicle. It worked perfectly the other day when I picked up the laminate for my bedroom floors.

When I arrived at the barrier at the entrance into the pickup area this morning I pressed the button and gave my name and order number and went to bay 2 as requested. Within moments a young lady arrived with my doors on a trolley and even helped me to load them into the van I’d hired.

I then drove off – but I could have been anyone taking them away really, because nobody had asked me for any form of proof of ID! So, a great system but…

Now the story about my hire van. I’d arranged just a short hire from Leclerc who I’d hired the van from for a few days when I moved out of my old house. Best price around and van in excellent condition. I only wanted the van for a couple of hours and arrived some time before my pick up time of 10.00 am in order to get all of the formalities sorted out.

Only one problem. They use a telephone dial-up card system and I swear that it took around ten minutes for it to complete the transaction after the button had been pressed. The young guy had asked me when I’d be back and I said that it’d be around midday. He then said that to make it easy for me, he’d put a return time of 2.30 pm on the paperwork.

By the time we’d completed the paperwork after the card machine delay and the agent had scraped off the windscreen for me so I could see out (didn’t think about doing it before I arrived…) it was around 10.30 am before I got away. So it was actually just after midday, about 12.10 pm when I got back, and to my surprise the office was shut up and barred – literally.

But I could see a young lady inside and tapped on the window. She told me that her colleague was not there and the office was shut. She than asked for my paperwork and on seeing the return time, that I had not asked for mind, of 2.30 pm, she said that I needed to come back then. And that was it! Her colleague hadn’t told me that the office would actually be shut until that time…

So I had no choice but to go off, grab a sandwich and a drink for lunch and sit in my car in the parking for something over two hours, suspecting all the while that the time of 2.30 pm that the original guy had put on my paperwork was not to help me at all, really, but was to help them…

But wait, it gets worse! When I returned to the now open window at just after 2.30 pm I was greeted by yet another gloomy face who told me that their computer wasn’t working and they could neither rent nor return vans at that time. He said that I’d have to hang onto the van until the system was working again (I’d actually parked it up in a return bay) but had no idea when that would be.

I went back at around 3.00 pm (having brought the van back just after midday remember) and was told that the system still wasn’t working. I suggested that maybe it might be a good idea to save time if he came out to inspect the vehicle to confirm that it was in the same condition as when I took it and take the kilometrage reading, and this he did.

When he got back about five minutes later there was a small group gathered around a boffin who was anxiously trying to reboot the computer system. He more or less managed to get it up and running and I was able to pay the additional fee for the distance driven. They then asked me if I’d like to wait a few more minutes for an invoice to be printed.

As what remains of my life flashed before my eyes I declined and fled the scene as quickly as possible. I think that they still haven’t really got the hang of using these damn computer systems here in France. That may or may not be so, but in a way it’s part of the charm of the place 🙂

Turning point

It’s been over a month since I’ve been locking horns with my builder over the roof problems on my house. Work didn’t completely come to a halt during that period but things certainly slowed down to the point that I can’t now see how the target completion date of 8th March can possibly be met. The builder and I came to a bit of an impasse, although I knew that if push came to shove and the matter became legal, it could then take months if not years as things go in France to be resolved.

But I decided to stand my ground and today I feel fully justified in doing so because having shaken hands with one of the builder’s directors a week or so ago on a solution that he undertook to personally guarantee for me, today was the day when that solution at last began to be put into action.

It all started at about 8.45 am when the local manager whom I’ve been dealing with arrived on site together with two workmen from the roofing company. He instructed them on what had to be done and they set to stripping off the rear of the roof and the edge tiles that had been put on the last time they were here.

null

null

null

Shortly after they’d started a small truck drew in bringing the new wooden components that would be needed to extend the rear of the roof. The driver was one of the builder’s own employees who was working on the house a few weeks back and it would be his job to carry out the necessary repairs to the gable end blockwork that I’ll show later below.

null

This shot was taken after the living room end had been stripped and that’s Didier taking a look to see how the job was progressing.

null

null

null

The next shot was taken a bit later in the day when the weather had brightened up considerably and it was much warmer. By this time the extensions had been added to the joists at the living room end of the house and the roofers were busy working on the bedroom end.

null

null

null

null

null

It’s not that clear in the following shot because of its brightness, but the extensions were fixed to the sides of the existing joints and as they are higher, they raise the roof line a bit but extend further beyond the house walls. Initially they are pointed but the points are then cut off to give the desired width of soffit, or overhang, and a vertical face on which the fascia board that carries the gutter can be fixed.

You can also see the builder’s ‘maçon’ working on the corner of the gable end over bedroom 2.

null

null

null

null

Here’s how things ended up at the end of the day. New waterproof membrane was put partially in place but couldn’t be fully installed because the shuttering put in place by the builder’s ‘maçon’ can’t be removed until tomorrow when the mortar it contains has cured.

null

null

null

null

null

null

null

So what was actually achieved today? First the ‘debord’ (soffit or overhang) on the rear of the roof behind the living room. Here’s how it looked previously, with only a very small overhang, much less than on the front of the house, tapering to almost nothing at the angle end.

If it had been left ie if I hadn’t been on site and spotted it, by the time ‘Crépi’ rendering had been applied to the wall there would have been no overhang at all at the angle end. This would have been totally unacceptable for both practical and aesthetic reasons.

null

And here’s how it looks after today – much more acceptable, with the overhang being about the same as on the front of the house.

null

The builder’s ‘maçon’ did a splendid job and was here until nearly 6.00 pm finishing off. Before he left I thanked him for his efforts and he said that he could only sleep well knowing that the job was done right. Here are the rectifications that he did on the gable ends.

First the corner of the roof on the front of the house at the living room end. The following shot shows how it looked previously with the roof supported on wooden blocks and a large gap between the wall and the end of the roof that was unacceptable for two reasons. Firstly, the gap wouldn’t have been filled by the ‘Crépi’ and secondly, the ‘Crépi’ wouldn’t have stuck to the wood. As the roofers had fitted end tiles, these had to come off before the repair could be made.

null

Now several shots showing the huge improvement after the’maçon’ had finished his work.

null

null

null

Now the corner of the gable end in the front of the house over bedroom 2. This was similar to the corner on the other end of the house but not quite as bad. Even so, the wooden blocks supporting the roof can clearly be seen in the next shot.

null

And now the same corner after the ‘maçon’ had worked his magic. Perfect.

null

And the cherry on the cake was that while he was here, the ‘maçon’ also drilled new holes through the walls and raised the height of the two errant exterior lights that I preferred to be at the same height as those over the doors.

null

So all in all, a very satisfactory day. The roofers and the ‘maçon’ will be back to finish things off tomorrow and then it will be the turn of the contractors to come back to fit the internal walls, ceilings, partitions and insulation. But I think that today marks a turning point in the project as a whole.

There’s still a lot of work to be done but it’s mostly ‘routine’ and the most important thing is that the house’s external appearance has been safeguarded. As I said to Didier before he left today, this was the most important thing for me because how it looks will be for the rest of its life.

Garage? Workshop?

I didn’t have to think too much about this when I was living in my old house. I had a workshop that already had a good size bench when I moved in and that I’d fitted out with shelving and power. I also added a separate wooden garden tool store in which to keep things like my ride-on mower and other garden tools.

That’s not the case with my new place because the design doesn’t include a garage and the metal tool store that I’ve erected in front of it isn’t big enough to take all my tools, let alone function as a workshop. So, as I’ll need to empty the storage that I’m renting when the house is complete, I’ll need to have somewhere to put everything, and that’s more challenging than it sounds.

There’s already almost no spare space in the tool store. OK, I’ve got two cement mixers, one of which is in the storage and the other in my tool store, so I’ll need to get rid of one of them. That’ll be a tough decision as one is electric and in great condition and the other motorized and not in such good shape. I’ve also got a rotavator in storage that I’ve hardly used since I acquired it but which I guess I’m going to need when I start doing my garden, together with some other large items.

My barbecue is in the storage. I made a cover for it so it could stand out at Plazac so I guess it can do the same at the new house, but I’ve got lots of other smaller stuff and most of my tools still in there too. I’ll need them when I start doing the interior work in the house, the kitchen and the bedroom floors, so I’ve come to the conclusion that I’ll have to move them into bedroom 3 where they’ll have to stay until it’s eventually time to do the floor in there.

But it’s obvious that I’m going to need a much more permanent arrangement. I always intended to move the existing tool store down to the bottom of my land where I’ve currently sited the caravan and I’ll be able to put my mower, rotavator and other stuff down there. But I now know from living in the caravan that it’ll be totally unsuitable for storing other types of high-value items, such as electrically powered tools, because it’ll get cold and damp down there in the winter and make things start to rust.

So what’s the solution? I’ve been musing over the idea of building a separate garage in the same style and colour as the house and I’m now thinking that like it or not, I’m going to have to do it sooner rather than later. And I mean before next winter. I have in mind a garage that’s large enough for a medium-size car with additional space at the end for a bench and at the sides for shelving.

So I’m probably talking about 6 metres long and 4.5 metres wide. I’ve been tinkering with my architectural design software today (with great difficulty I might add as it’s been so long since I’ve used it, I’ve forgotten how) and here’s what I’ve come up with.

null

It’ll mean extending the concrete base that I put down for the tool store and also turning it slightly to align it with the house. I haven’t yet worked out its exact position and how far it will be from the house (I’m thinking about 2 meters) so although the above image isn’t precise, it does give a very good impression of the final result. I’ll have a lot to do when the house is handed over so I’ll just have to hope the late spring, summer and autumn are kind if I have to leave things outside before it’s built.

I’d like to do the build myself if I can using what is called ‘parpaing’ (concrete blocks) that are much cheaper than the type used for the house, but I’ll have to wait and see if that’ll be possible. The other thing as well, of course, is that if/when I do go ahead with it, I’ll need to have an electrical supply that I need to arrange right now! So that’s another job, but at least I’ve now got a picture of what I’d like to think I’ll be aiming for 😉

More electrics

When the electricians first came on site they told me they’d be here for two days, but it took them not much more than half that time to complete their work because they originally arrived late Thursday morning and were gone by early afternoon Friday. I don’t have a key to my house, and will not be allowed one during its construction for insurance reasons I’m told, but I grabbed some shots of the interior on Friday before they’d finished and the outside after they’d left.

So, starting with the interior, which looks like a rat’s nest with so many cables hanging down. This is mainly because I’ve specified that the house will be lit throughout by LED spotlights and there are over 40 of them!

null

null

null

null

null

Now the outside. Here’s a shot of the east-facing living room door showing the exterior light above it and the external plug point on the back wall on what will be the patio area. Very handy.

null

Another shot of the back of the house again showing the exterior light above the living room door and also the exterior light between the windows of bedrooms one and three. I haven’t quite made up my mind about the height of the latter which I’d always intended to be at the same height as the lights over the doors.

The same applies to another one on the front of the house. It wouldn’t take much to move them both higher before the interior walls are put in place – all that would be necessary would be to pull the cables back inside, drill new holes higher up and push the cables back out again, but I need to arrange for that pretty quickly if I intend to do it. I can’t understand why the electrician placed them lower – maybe he drilled one hole in the wrong place and decided to do the second in the same way 🙁

null

The next two shots show the exterior lights over the other two living room doors.

null

null

Now a general shot of the front of the house showing the cable for the entrance porch light, the other (low) exterior light between the bathroom and the utility room and the external plug point which will be handy for doing odd jobs in the garden or on the car that require electricity.

null

Here are the connections in place for the heat pump.

null

I was pleased to see that before leaving they’d sealed around the external plug point boxes with some mortar to secure them in the walls.

null

null

And finally, here’s the cable in place for the porch light.

null

So they got through a lot of work. OK, there’s an awful lot going on because I’ve specified the house’s electrical system quite highly, but it’s better to do that now during construction than to add features once the house has been completed.

One thing that’s missing though, is a connection for a generator. I’ll maybe have to add that later in an external structure, such as a workshop or garage, when I have such a thing available. It’ll mean breaking into the house’s main electrical supply but I can’t see any other way at the moment.

Thinking ‘interior’

I mentioned in an earlier post that I’d rejected the interior doors that the builder originally wanted to install in favour of some pine ones that I’ve sourced from Leroy Merlin and which I’ve just been told have arrived and are ready for me to pick up. I’ll arrange that for some time next week when the electricians have finished their initial cable installation and the guys who will be installing the interior partition walls are back.

They already asked me about the doors and said that they’ve been supplied with the dimensions of the openings that they’ll need to leave in the partitions for them to fit into that I supplied to the builder a few weeks ago (see image below). However, they said that usually they’d prefer to fit the doors as they go to ensure the best possible fit and finish.

null

They also said that the doors are generally fitted before the final floor screed goes down to provide the level surface on which the tiles are mounted. I suggested that in that case, maybe it would be a good idea for me to drop the doors into the house when I’ve got them and for us to come to an arrangement for them to fit them for me. This was generally seen as being a good idea so that’s what we’ll do 😉

The order I placed on Leroy Merlin was quite sizeable and was split into three deliveries. The other day I picked up the laminate for the bedroom floors that the builder doesn’t fit here in France – the bedrooms are left with just a plain concrete screed (see ‘chape’ in the image above) – and that you have to install yourself. At the same time I picked up the laminate underlay and since then the door handles and escutcheons that I ordered have also arrived.

Before I put all of that stuff into storage yesterday I took a few pictures which I’ve included below starting with the floor covering.

null

null

Now the door handles.

null

null

null

Instead of going for door handles with the handle and keyhole in the same plate mounted on the face of the door I’ve gone for beautifully smooth, curve shaped handles and separate round escutcheons containing the keyholes which I think are more ‘French’ (I don’t know what’s fashionable in the UK nowadays). I’ll also be having special keyless escutcheons in the bathroom and separate WC which will allow the doors to be locked by turning a knob, a nice touch I think. I already have them but I’ll need to buy two special keyless door locks to replace the ones that the doors will come with.

The electricians resumed work today and I was able to have a quick word about the cable for my planned satellite dish. The builder confirmed to me yesterday that the TV point that will be sited in one corner of the living room is intended for that purpose and that the cable will be left in the roof space ready for the dish to be connected to it.

null

I showed the electrician where I want to site the dish (which I’ve now ordered) and he said that rather than leave the cable in the roof space he’ll drill the wall and push it through ready for use. This will be an excellent arrangement as it will avoid having unnecessary connectors in the cable run as well as being a very tidy install, and will also ensure that I get the best possible reception 🙂

Electrics

I dunno, I was told that the roofers would be along today to deal with the roof problems but by mid-morning no-one at all had arrived on site. However, by late morning a van and a small car were ‘up top’ and it turned out they were electricians who’d come to install the house’s wiring. They said they’d be here for two days.

When I went up to take some shots in the early afternoon the two younger guys who’d been here to help unload the van and set things up had left and there was only one more senior workmen who was doing the installation. Here are the pics that I took.

null

null

null

null

null

It’s a shame that the roofers aren’t on site because it’s turned into a nice warm, sunny day ie just the day to be doing roof work. I can’t fathom why the builder always seems to get it wrong – presumably the roofers will be along in a few days time when the weather has changed again and the electrical wiring that’s been installed has had a chance to get a good soaking 😐

Getting back into gear

My house-build is moving forward again. At last! Two workmen arrived this morning just before I was on my way out to a follow-up dental appointment. I noticed that they’d thrown out all of the wood and everything else that had been left on the floor inside and when I went up later to see what and how they were doing I found that they were sub-contractors who will be installing the ceilings and partition walls.

Here are some shots that I took in the middle of the afternoon. Their first job was to mount all of the ceiling bars that will hold the ceiling in place and when I peaked in earlier I saw that they were using a laser to make sure that the hangers are all at exactly the same height. This will ensure that the ceilings are completely level.

null

null

null

The boss, an elderly Portuguese gentleman, told me that they’ve been waiting for the go-ahead for some time and he’d heard that there had been some problems with the build that were only resolved on Monday. He said that the roofers will definitely be coming in tomorrow to fix the roof and make the house fully watertight as there is still water on the floor and afterwards he said that he and his partner will be there until the ceilings and interior partitions are all in place.

A couple more shots taken at end of day (so poor as light was failing). So all of the ceiling supporting bars are now in place.

null

null

The question is… is this the ‘Reawakening’ that I’ve been waiting for?

null

Mother Nature says ‘Yes!’