Trying to get back to flying…

But it’s difficult. My Savannah lost its brakes (again) last year due to the summer’s intense heat and although I got them back again by the autumn I was reluctant to fly it because they were still very poor. In fact they’ve always been poor ever since I’ve owned the aircraft. I’ve been told that they should be able to hold the aircraft on the flat at full power, but that’s never been possible and I guessed that this was because the disc pads needed changing.

I obtained a new set last November but mainly due to issues associated with my house-build, I was unable to fit them at the time. It then became too cold to do the work as I’d have had to work in the open barn, so the new pads have been in the back of my car ever since. Anyway, now that the afternoons are warming up I managed to get myself organised enough to get cracking yesterday. Due to the learning curve involved, I only managed to get half the job done and I’d have liked to have done the second wheel today.

But I haven’t been able to because I’ve had to sit in all day waiting for a delivery from DHL which, at the time of writing, still hasn’t arrived. I can tell you, I’ll be very annoyed if the Ebay Global Shipping system fails to deliver and makes me wait in for a second day.

I’m waiting for a satellite dish to arrive from the UK. I wanted an oval one and couldn’t get one here in France and in any case, even with carriage from the UK and an import surcharge of over £10, it was still cheaper to source a dish from there rather than from a local supplier.

So to fill my time while I was waiting I thought I’d go up and have a clean-up in the house. The floor was filthy, which was not unexpected given the amount of work that’s been going on and with none of the workers involved wanting to spend time wielding a broom. So I did it myself with the windows and doors all wide-open and here’s how it looked afterwards.

null

Since taking the picture I dumped all of the dust and rubbish into a black bag to be disposed of later and also removed all of the stickers from the glass of the windows and doors. I also took some pictures of the roof space.

First, the bottoms of the large vent that will be connected as the extractor from the septic tank system and the smaller vent beside it. I don’t know what the latter is for, possibly it’ll be a vent over the kitchen, but I don’t know for sure.

null

Now the house’s ventilation system. As I understand it, this will be running the whole time and circulating fresh air through every space in the whole house.

null

The next shot shows the bottom of what I think will be a vent over the separate WC.

null

And finally, I was recently contacted by Enedis who are keen to connect up the house for electricity but it can’t be done until the house is finished with it’s electrical system fully installed and the latter having been officially inspected and approved. Only the builder knows when this will be so I referred the matter to them and have since had it confirmed by both Enedis and the builder that this will be on 29th March.

This is excellent news because Enedis must have a firm commitment for the date as otherwise they will render a penalty charge for which the builder will be responsible. So whether this means that the house will look like the following image by that date I’m not sure, but I reckon it should be pretty close 😉

null