Good grief!

I’ve been saying for a long time that the people forecasting our weather just do so by looking out of the window and saying that what they can see out there will continue for the next two weeks.

Instead of waking up to yet another bright, dry morning as had been forecast just the day before, with the prospect of the temperature getting to 60 deg F in the next few days, we actually had rain overnight plus fog and heavy drizzle this morning and a new forecast of freezing temperatures again next week.

I went to Leroy Merlin as planned to pick up my bedroom floor laminate and my land was so wet and slippery when I got back, with it weighing down the back of my car I had to use 4-wheel drive to reverse and park up. I think the moral to the story is ‘Don’t Make Plans’ based on the weather forecast 😐

Oh, and BTW it’s wet again inside my house…

Halleluiah!

The builder and I had our follow-up meeting this afternoon to resolve my house’s roof problems and at last we’ve managed to come to an agreement. It isn’t what the builder was originally proposing or what I suggested following our last meeting.

The first positive step was when the builder finally admitted that the roof structure as it stands is mounted unacceptably too far forward on the walls of the house making the ‘balance’ of the roof all wrong when viewed from the south. Originally they suggested just adding extensions to the joists sticking out at the back for purely ‘cosmetic’ reasons and to overcome my objections. This I rejected out of hand and made a counter-proposal just to remove the tiles from the front elevation and push the structure back a few centimetres.

I knew that this might give rise to certain other problems. For example, the horizontal spacers between the joists that rest on the tops of the walls are attached to the joists and would therefore move with them. That wouldn’t matter at the rear of the house because the spacers would still be resting on the walls’ upper surfaces, but in the front the spacers would move off the walls and into the interior of the house, probably meaning that they’d have to be cut off and replaced somehow.

The builder has taken a different line and has now suggested lifting the tile support battens and waterproof plastic membrane off the rear of the roof and adding a separate new roof structure on top of and attached to the existing one. This would have the effect of raising the roof line a bit but as the additional joists will need to descend to the same level as the existing structure ie the bottom line of the roof, they will extend further, making the roof overhangs at the font and back of the house at the living room end the same.

This is almost the same as if they’d made the roof structure according to the width of the larger gable end right at the beginning, so I’ve gone along with this idea. It means that the house will end up with ‘débords’ (soffits) slightly wider than the original plan (28cm compared to 25cm) but that won’t matter. And I’ll also have to keep a close eye on the way the tops of the gable ends are finished off because the gaps that are now present in places between the tops of the blockwork at each and of the house and the underside of the roof will remain and will need to be filled and made solid with mortar.

This will be necessary in order to support the ‘Crépi’ rendering that I want to go right up to the underside of the roof. I certainly won’t allow it to be applied to the wood blocks that are currently placed on top of the blockwork to support the ends of the roof as it wouldn’t take long for it to break away as a result of differential expansion and contraction. That would give rise to all sorts of other problems in the future that I just won’t need, thank you. But now I’m just happy that work on the house can be resumed and we can start moving once again towards completion.

What’s happening?

With my house-build? I don’t know, I really don’t know. But it’s not all negative, as I’ll go on to explain.

Our site meeting that was called in order to attempt to resolve my house’s roof problems went ahead as planned last Friday and as expected, the builder attempted to steam-roller me into accepting what I regard as their half-baked solution. But I’m not one to be either bullied or intimidated, as I made clear to them.

So I responded in kind, said that if they intended to propose any solution that did not involve removing the roof and starting again, we might as well stop talking now and turned to walk away. That got their attention.

So then we started to have a meaningful, albeit tough, dialogue. They still wanted to try to hustle me, however, to accept their solution that would involve the fabrication of a large number of extra components and said they’d be along on the following Tuesday (last Tuesday) to fit them. They said that I’d be fully satisfied with the result.

Yeah, OK, but I’m not that easy. I said no, tell you what, if you’re so convinced, come back on Tuesday with just two samples to show me, then if they’re so good and I am convinced, you can come back and fit the rest. There wasn’t much that they could do other than agree and that’s how things were left.

But I don’t think they realised that the match was far from over. On Saturday I fired over an email making a counter-proposal based on the status quo that would NOT require any additional construction or fabrication. The result was that on Monday I received an email saying that they were seriously looking into it and, of course, nobody arrived back on site on Tuesday with the aforementioned ‘samples’.

This I took as an encouraging sign. Which brings us to this afternoon when I received an unexpected phone call from Didier. To cut a long story short, they’ll be coming over on Monday afternoon to look further at my proposal and see exactly what it involves.

I’m not going to say any more other than if it goes ahead it’ll meet my requirements and I’ll be very happy with the outcome. I also think that it will be sensible for them to accept it because the current impasse is doing neither of us any good and can’t be helping them with their project planning. I’ll let you know what happens on Monday.

Good news day

This morning a very special letter dropped into my postbox. It contained the certificate from the Oncology Department at Périgueux stating that five years after the end of my treatment for Lymphoma and following a final consultation last week, I have been officially declared clear of the disease and in full and complete remission.

It isn’t as though it’s been a shadow hanging over me as I’ve just been determined to get on with my life in the meantime come what may, but nevertheless it’s a nice thing to have. And I hope that it will be something that will give hope and encouragement to anyone else who has been diagnosed with Hodgkins and thinks that their life will change forever for the worse.

If you’re one of them, you need to understand that it’s up to you and it doesn’t have to if you don’t let it. Things may feel terrible right now and yes, the treatment at times is not very nice. But take my word that it’s worth it and things will work out in the end. As they have for me, thanks to the amazing team of very special people at Périgueux to whom I will be forever thankful.

S’no joke

It started snowing in the early evening yesterday and as it became harder at about 8.15 pm we had a power cut. It came back on a couple of times for a few moments but then went off again and whenever that happens we normally know that we’re in for a long one. Just in case I went up and checked my electricity supply box to see if there was any life in it and there wasn’t, so I decided to just make the best of things and go to bed early as I knew that the caravan would then cool down pretty quickly.

When I got up at about 7.30 am this morning the power was still off so I decided that I’d better get my generator running. I haven’t started it for at least a year, I think more, and it’s just been standing outside partially covered up with an old plastic tarpaulin. I didn’t know what to expect but in the event, it only took four or five pulls to get it going. This was a big relief, as I didn’t want to face not only having no power but also the prospect of having to fix the generator in these conditions.

Here’s a shot that I took after I’d got my generator running – the footprints are mine from when I trudged up and back a couple of times to check my electricity supply box and get some fuel that I had in my tool store to top the generator up ready for next time. This is bound to happen as, much like in the UK, we’ve got freezing temperatures forecast for the next seven days.

null

The electricity came back on again and went off again briefly a few minutes ago. This often happens after a longish power cut, presumably because once they’ve fixed the original problem the circuits are reverted to how they’re supposed to be, but although the sun’s out it’s still quite cold and the snow isn’t melting very rapidly.

This could complicate things slightly this afternoon if the roof of the house is still heavily covered because I’m having a site meeting with a senior director of the building company to discuss the roof problem. If there’s not much to see it won’t help very much but I guess we’ll have to see how things are looking later on.

I should be over the moon

But I’m not. A team of workmen turned up this morning at 8.00 am, before it was even light, to install the windows and doors in my new house. It rained all night and was still drizzling at the time so I knew the interior would be partially flooded and phoned Didier, the builder’s project manager.

I said that I thought it was ill-advised to go ahead and he said that he’d be right over. However, I had to leave for a medical appointment today so could not stay to discuss the matter and just told him that he should take note of our conversation.

The work went ahead in my absence and although it was still underway when I returned in the afternoon, I didn’t feel up to going up to take a look and only did so after the workers had completed the job and left. Under normal circumstances I’d have been very pleased with the results as the following shots show.

null

null

null

null

null

null

null

null

The last two shots show more clearly why I’m not at all happy. If you look through the double doors on the right into the interior you can see the large pool of rainwater that there is on the floor at the living room end.

null

Now if you look through the same door in this close-up towards the bedroom end of the house you can make out the large amount of water on the floor in that section also.

null

I have no idea when the builder will be back to continue work. What is absolutely clear, however, is that with all of the doors and windows now closed and locked, there’s absolutely no possibility that the interior will be able to dry out any time soon, especially as more water is still entering via the roof fault in the angle at the back of the house.

This is precisely why I was trying all along to avoid a winter build and in fact it’s turning out worse, much worse than I could ever have envisaged. I don’t know when I will have my meeting to discuss what is now our dispute concerning the roof but even though I wanted to still take it a bit easy tomorrow, I’m going to have to make yet another phone call to find out what’s going to be done about the appalling state of the interior because with even more rain forecast for the coming week, it can only get worse.

Bad news update

Well, anyone who’s been following my trials and tribulations involving my house-build project is probably thinking that since there’s been no further work for several days there are problems. And indeed they’d be right. The problems have now turned into a major dispute between me and the builder that also involves the sub-contractor that the latter used to install the roof on my house.

It started with my noticing that the roof structure was not sitting correctly on the building’s walls and that dimensions that we’d agreed when we’d signed the contract had not only not been adhered to but were totally wrong. I started with a softly-softly approach to the builder who had clearly made some fundamental errors, if not outright mistakes when they’d designed the roof structure but was met with an entrenched response and a demand that I accept compromises in my house’s roof design that were designed to get them out of the trouble that they’d created for themselves and that I did not like.

Naturally this caused me to harden my own position and we are currently in a position of stalemate where no party is willing to make any concession. As a result I have conducted a detailed analysis of the building’s roof structure and am 100% confident in having identified from where the problems have arisen and who was responsible. The builder said that they would propose a solution that would meet the conditions that I laid down, namely that it had to be (a) practical and (b) aesthetically acceptable and I had to wait a few days for it to be delivered.

When it arrived I knew immediately from my calculations that it was totally unfeasible. For a start it involved an initial dimension that does not exist and can only be achieved by removing the whole roof structure and moving it back several centimetres, which the builder refused to do right from the outset of our discussions. I don’t know if they do not realise this or are just being disingenuous in the hope that I won’t notice, so I decided not to tell them.

Instead I fired off an email asking if this is what they proposed to do as part of their ‘proposition’. If they say ‘yes’, it means having to take the roof off and if so they can strip it completely and do the job again, properly according to the contract. If not, what they propose is, as stated above, totally unfeasible.

I’m 100% confident in my calculations and also have the evidence to back them up in the form of the plan that the builder gave to the roofing contractor who has then not abided by it. I’ve given up talking to the builder’s local manager who I’m pretty sure knows where I’m coming from and is desperately trying to mount a rear-guard action. Instead, on the advice of our local mayor in Fleurac who knows about these things, I’ve demanded a meeting with the party named in the contract who is legally required to act as an intermediary to try to resolve any dispute that arises during its execution and am now awaiting their reply.

What has astonished me, and I’ve told them so, is that even though I’d already raised my objections regarding the roof structure of the house, the builder still allowed the roofing company to come on site and tile the front part of the roof. This will undoubtedly complicate matters and make whatever the ultimate solution is that we decide upon even more costly.

I told them that this was hardly what I would have expected of a company with 40 years experience and if they think that it will put more pressure on me to press on with the now much-delayed build then they could not be more wrong. I’ve told them on several occasions that a house is only built once and if mistakes occur during the build they will have to be rectified before continuing and not left to be bodged once the house is completed.

I don’t think that it’s got through, unfortunately, but it doesn’t help me to get my house built in a timely way and according to the requirements that were set out and agreed when the contract was signed. I stated in my (registered) letter that I sent to the above-mentioned intermediary, that all I am asking for is that I get the house that I ordered and was agreed when the contract was signed, no more, no less. I think that’s perfectly reasonable, don’t you?

Piggy-in-the-middle?

After rain followed by more rain, this morning we’re shrouded in thick mist which is actually a heavy drizzle. And the inside of my house is still half-flooded. Nobody came to work on the house yesterday and no-one has arrived today either and I wonder what’s going on as time continues to slip by.

During our discussions about the roof problem, as I briefly mentioned in a previous post, I picked up that the roofing sub-contractor may have set the roof too far forward on the house’s walls, thus exacerbating the problem of the overhang at the back being unacceptably too narrow. If this is so I’m wondering if there is now a dispute between the builder and the roofing company about who is responsible for solving the problem?

It would be pointless my intervening. As far as I’m concerned, even though it would mean causing an even greater delay, I’d prefer the roof to be totally removed and remade. When it looked as though the builder was responsible for the problem, I was told that this would not happen. I wonder if this still applies if it’s the roofing company at fault?

But in any case, if there is such a dispute, it isn’t helping me to get my house built any quicker. And I’m just the piggy-in-the-middle with little or no influence on the matter. No wonder my frustration level is going through the roof. At least it would be, if I had one.

Despair

I was awoken this morning just after 6.00 am by rain being lashed by strong wind and pounding on the roof of my caravan. I knew that this would not bode well and when I went up to take a look at my house during a break in the almost incessant rain, my worst fears were realised. Every time it has rained, water has run inside from the roof angle at the back, presumably because they didn’t make an effective seal in the plastic membrane there, and with the wind driving rain in through the doors and windows, the inside was partially flooded again

null

null

null

null

null

null

null

The pictures don’t make it look as bad as it actually is. The pool at the southern end was over 2cm deep and being prevented from draining out because of the new threshold that was put into place last week.

null

In fact, I can’t see how the water can now be easily removed. When I did so using a stiff yard broom the last time I could brush it straight out of the door openings. That can’t be done now the thresholds are in place and moreover, I can’t see how any meaningful work can be done inside the house until it has been dried out and water prevented from entering in the future.

No wonder I’m beginning to despair that my house is ever going to be finished within a reasonable time-scale, and all because the builder wasted so much time in the summer and autumn when the conditions were perfect. I just hope that quality and finish won’t suffer as a consequence and I’m now more determined than ever to make sure that I keep a very close eye on what goes on in the build, no matter who it might upset.

That was quick!

Two of the builder’s workmen began working again on site this morning. I wasn’t sure what they were doing and didn’t go up to find out until after they’d left for lunch at about midday. We’d only discussed what types of window sills and door thresholds I preferred in our meeting the other day – beige round-nosed for the window sills and plain grey straight front for the door thresholds – and to my surprise I found that the two ‘maçons’ were well on the way to getting them all into place.

null

null

null

null

null

null

null

I had to go out later in the afternoon and by the time I’d returned the two workmen had packed up and gone leaving the site clean and tidy and their work all completed to a high standard. Here’s a shot of the back of the house showing the threshold of the rear double doors, the window sills of bedrooms one and three further away both at the same height and that of the kitchen, closer, slightly higher so the opened window will clear the mixer tap on the sink.

null

Here are a couple of shots showing the thresholds for the south and front-facing double doors.

null

null

Now a couple of shots showing the front door and the separate WC window and the windows of the utility room, bathroom and bedroom two.

null

null

And to finish off, several internal views.

null

null

null

null

You might be asking yourself why it is that the window sills protrude outwards beyond the walls while the door thresholds don’t. The reason is that the door thresholds won’t be seen because all of the door frames will, of course, come with their own decorative colour-matched thresholds which will be about the same colour as the window sills.

There are also a couple of other things to note. The sills and thresholds all extend some way into the house and this is an indication of how much thicker the walls will become once the internal insulation and dry lining have been added as then the sills and thresholds won’t be visible.

You can also see how high above the floor level the tops of the thresholds are. There won’t actually be steps in the openings other than the door frame thresholds mentioned above. Some of the height difference will be taken up by the floor tiling but most of it will be an additional thickness of floor screed that will be laid in the near future to bring the floor to completely level all over.

This will be especially important in the far corner of bedroom one where the rainwater that entered the building before the roof covering went on flowed to causing a deep puddle. There are several other highs and hollows that were to be expected given that the first floor screed was only quickly laid by eye, with the team having done pretty well considering. The second screed will bring those all to dead level ready for the tiling and the bedroom floor coverings to be laid, the latter by myself.

Yesterday’s photos

It stayed too foggy for too long yesterday to get any decent shots of the roof work that was done. I’ve now managed to process some, however, so here they are starting with some general shots of the front elevation.

null

null

null

null

Next a couple of shots of the living room gable end showing how they’ve finished the edge of the roof.

null

null

I preferred an arrangement with a roof overhang because although most ‘pavillon’ style houses here like mine have the type of edge finish shown in the above shots, due to its proximity to the surface of the wall it seems to allow rainwater to pour down onto it. This eventually washes away some of the colour of the Crépi plaster allowing the outline of the block work underneath to show through.

I’ve spotted a couple of broken tiles as shown in the next two pics and they’ll have to be replaced whatever happens. They’ve been damaged by the roof workers walking over them which it’s unwise to do when you’re dealing with any kind of tile that doesn’t have a fairly flat profile.

null

null

Now some shots taken from the rear which can’t be tiled until the changes to the structure that I’ve agreed with the builder have been completed.

null

null

null

Next up is a closer shot showing how the hip on the joint between the two front faces of the roof is being constructed.

null

And a couple more general shots to finish off with.

null

null

In general, I’m very happy with the style and appearance of the roof tiles. However, something I’ve noticed from looking around the building is that after the roofers have cut and trimmed various tiles they’ve just randomly chucked the unwanted pieces onto the ground behind the house. As a result the large heap of topsoil that was put to one side and was ready to be reused at the end of the construction is now strewn with pieces of roof tile.

I’ll have to ask for them to be removed because as I know from my old house, if they are left in the soil they eventually have a habit of working their way back to the surface and are then not only unsightly but can also damage things like lawnmowers. I don’t know, if it’s not one it’s another 😐

Not a good day

Happy New Year, everyone. Although I’ve been quiet since Christmas Eve, it doesn’t mean that I’ve not been busy. In fact I’ve used the time since then very productively because I’ve been able to firm up on some important decisions.

Some readers may recall that I mentioned a few posts back that I’ve cancelled the doors that the builder of my new house wanted to install in favour of a model of my own choice. They tried to confuse the issue somewhat by suggesting that I needed an arrangement that was FAR more expensive than what I was proposing but I know what I want and how to fit them. In the end they understood that all they (and their plasterer) need to do is provide openings in the walls of exactly the dimensions that I have specified and that’s what will now be done.

The model is one in pine offered by one of the largest homeware and material suppliers here, Leroy Merlin. It’s not the most expensive available – far from it – but I have to carefully control my budget as I will have a LOT to spend on when the house is finished and I eventually move in. Here’s a promo shot that I’ve taken from the Leroy Merlin web site.

null

I’ve considered the feedback that previous buyers have posted and it looks as though people either love it or think it’s rubbish. When I looked more closely to try to understand why this was I’ve come to the conclusion that there was possibly a batch in about the middle of last year made from bad or not properly seasoned wood as the reviews before and since then have been good.

Anyway, I’m prepared to take the risk as I like the look of it, it will go well with the colours that I’ll be having in my house and in any case, it comes with a good manufacturer’s guarantee that I’m sure Leroy Merlin would honour in the event of any quality problems.

I’ve also decided on the laminate that I’ll be laying on the floors in my bedrooms and it, coincidentally, will also be coming from Leroy Merlin. The knock-on benefit of this is that I’ll be able to claim a ‘first order’ discount on all of the doors, door furniture, laminate and laminate accessories which comes to a figure well-worth having. I also looked at their kitchen range to see if I could add a kitchen to the list to increase the saving but they’re all a bit too twee for me and not to my taste unfortunately.

Here’s a shot of the floor laminate that I’ve chosen also taken from the Leroy Merlin web site.

null

It looks darker in this picture with a pattern heavier than it is in reality and I think that it will go well with the light grey patterned floor tiles that I’ve chosen for the whole of the rest of the house.

Now onto the darker side of this post. After the workmen had finished the roof work before Christmas and it had stopped raining I had a chance to inspect the results of their labours. The first thing I noticed on approaching the back of the house was that the join of the roof sections was some way off the join in the walls, as the following picture shows.

null

So I then went and took a look at the roof overhangs in the front and back of the house. Here’s the overhang at the back on the bedroom corner.

null

Here’s the overhang in the front at the living room end and when I checked, this was the same along the whole of the front of the house, right down to the bedroom 2 corner.

null

Then when I walked towards the rear of the house and looked up, it was obvious that the roof at the living room end of the house was not positioned centrally on the peak of the gable end with the ridge having apparently been moved forward several centimetres.

null

And this was confirmed when I checked the roof overhang on the rear of the house and found it to not only be almost non-existent but also narrower at one of its ends than the other.

null

This was clearly not acceptable and I wasted no time in zapping off an email to the builder expressing my displeasure with the situation. I received a reply saying that the ‘boss’ was on holiday in the South of France but that another representative from the company would be available for a meeting on site last Saturday, which went ahead as scheduled.

This got off to a bad start because he tried to bully me into accepting what had been done and I am not someone to be bullied. I told him that while I’d been waiting I’d retrieved a soaking wet sheet of paper from the waste bin that was actually the roof fabrication plan that the roofers had been using. This showed that this almost non-existent overhang was actually pre-planned by the builder and furthermore, I’d never seen it before.

I already knew that the ‘problem’ was linked to the fact that the gable ends of my house are of slightly different widths with the living room end being 12cm wider than the bedroom end, but the implications of this still hadn’t hit me. While I was trying to work things out, the representative from the builder and a French friend who I’d invited to be there to keep an eye on my interests as he’s in the building trade started going at each other hammer and tongs and although I couldn’t follow everything, I knew that the language being used became quite appalling.

In the end I told the man from the builder to calm down as it was his job to reflect a positive image for his company and engage with me in order to find a solution that we could both live with. He said that the builder had to ‘change’ my plan because of the dimension difference and that this had been discussed between me and his boss … in October 2021! I had already established that the length of the joists had been cut to length for the whole house according to the shorter gable width but had still not taken that fact to its logical conclusion. That came slightly later.

He said that a choice had had to be made between having the shorter overhang over the kitchen/living room end or a larger overhang below the length of roof over the bedrooms in the rear of the house. I refuted that such a conversation had ever taken place and said that even if it had done, there was a more than a year between such a conversation and the date when the joists were fabricated for the plan to have been referred to me, as it should have been as both the client and the ‘chief of works’ as defined in the contract, to make such a choice.

At the end of this somewhat rambunctious meeting I agreed that the only timely and cost-effective way out would be to add extensions to the joists along the rear of the house to make the overhang the same at the front and back of the house at the living room end where the difference was most visible. This would also mean increasing the overhang along the rear at the bedroom end but I reasoned that this would matter far less as it would hardly be visible to anyone who wasn’t already aware of it.

However, it was only on thinking about the issue more afterwards and sleeping on it that I realised what a bloody awful cock-up the builder had made. If they had cut the joists according to the longer gable end the ridge and overhang issues at the wider living room end, where they are now highly visible, would not exist at all.

The ridge ‘anomaly’ would have been at the far bedroom end and towards the rear where nobody would ever have been able to see it and although the roof overhang over the bedrooms at the rear would have been greater, as it now will be anyway (a) it would be hardly noticeable and (b) it could be seen as a design feature to provide additional shade from the sun during the warmest part of the day to help keep them cooler.

That’s when I became even more annoyed than I was already, because if the builder had consulted me as they should have done it would have been possible to have totally avoided this whole crisis, as that is what it has now become. I therefore rattled off another email and left a message with the ‘boss’ saying that despite what had been agreed at the meeting on Saturday, there was to be no further work on the roof until we had met on site with his new site manager (Didier) to discuss the way forward.

I pointed out that due to his unwillingness to engage in effective communication and despite my many requests, there had been no project planning or progress meeting between us since the initial contract meeting that he’d referred to in October 2021 and now and that this was wholly unacceptable. I also added that the idea of communication was to avoid crises such as this happening in the first place and not to frantically try to deal with them once they had occurred.

In the event we had not one but two meetings on site today, the first at around 8.00 am and the second at the end of the afternoon, and we covered a number of high-profile issues. To cut a long story short, in the first I reiterated the points that I’d raised in my email but as my opposite number was preparing to lock horns, I suggested that becoming entrenched in our positions would do no favours to either side, which he understood.

By the end of the meeting we’d managed to come to a satisfactory agreement subject to certain conditions on their side and just as the meeting was coming to an end, the roofing contractors arrived to tile the roof. We’d agreed that as changes were going to have to be made to the rear roof structure, only the front of the roof could be tiled, and that’s what they did. And they made a good job of it as I think the following pics show.

null

null

null

null

null

null

null

null

null

null

null

They’d finished the front half of the roof by lunchtime but as time passed it became apparent that they’d been told to wait for further orders. Eventually they must have been told that there’d be no further work today because they left at somewhere around 2.00pm. I found out later that it could be a few days before work can be resumed. This was when I left the caravan for bit of fresh air and came across Didier and the builder’s ‘boss’ back on site. I was told that their measurements had thrown up that the roofing contractors may have misplaced the roof anyway and that this might have to be addressed. So yet another bomb-shell!

But as I’ve emphasised to them so many times, things have got to be done right. The ‘solution’ that we agreed earlier has also apparently got to be run past the building standards department to ensure that it conforms so that may also delay things by a bit, but not much, which won’t be the end of the world.

Didier also gave me a quick appraisal of their timing plans from Thursday onwards, when they would be back on site, which I was pleased about. I also agreed with the ‘boss’ how much latitude would be acceptable in achieving our agreed ‘solution’ in order to expedite things as far as possible, adding that if I needed to disguise the faulty overhang – by fitting a sun roller blind for example – I’d be back chasing him for a contribution to the cost which would be a cheap way out for them. Didier was highly amused – the ‘boss’ slightly less so. Especially when he realised that I was serious 😉