Not quite to plan

The following video tells the whole story.

As I hadn’t flown it for a while, I prepared my X-Air 24ZN yesterday evening ready for the flight I had planned for today, including running the engine up until it was hot. I did the same again this morning as per normal procedure and taxied down to Malbec’s runway to take off. Within a few seconds the engine suffered a large power loss, much as it had done in the UK while I was getting the aircraft ready to bring to France. But since then I’ve overhauled its fuel system including refurbing its fuel pump, replacing most of its fuel line and ensuring that there were no fuel or air leaks and its engine has run faultlessly as a result since that time.

But this was not the time to wonder what was going wrong as the gauge was showing ample fuel pressure and there was little that could immediately be done to rectify the problem. The aim was to keep flying the aircraft and what was evident was that despite the power loss, it was still able to climb, albeit very slowly. There’s no safe emergency landing area straight ahead out of Malbec but there are some suitable areas to the right which become more viable the higher you get, so as I was too low to turn back, I continued climbing with that in mind.

Eventually I decided that I was high enough to make the turn back and despite the engine still running rather erratically, managed to do so for a perfect precautionary landing. The problem was obviously fuel related. When I arrived this morning, despite having run the engine the night before, its fuel filter was half full of what looked like old, dark brown coloured fuel and I wish that I’d taken more notice because after I’d landed, it contained fresh, clean new fuel.

Afterwards I removed, checked and re-gapped the plugs and the engine ran smoothly. I chocked the wheels of the aircraft and ran the engine up to full power for nearly a minute and it didn’t miss a beat, so the problem may have cured itself if it was due to either some kind of blockage or a vapour lock. However, I’ll run a few more checks before having another try later this coming week, possibly on Tuesday morning which looks as though it could be much the way things were this morning.

Yes, tomorrow

What with the problems to do with my new house-build and this and that, I’ve hardly been doing any flying. At the very least this is economically ridiculous as it makes no sense to keep two aircraft in a hangar (barn actually) that are fully insured and not use them, but it’s also highly frustrating.

One of the problems, at this time of the year especially, is the weather because although it’s great for the holidaymakers and tourists who are now flooding into the area to have long, hot sunny days, it plays havoc for we pilots. As soon as the air significantly begins to warm up, thermals are created which can at the very least make flying bumpy and uncomfortable, but in more extreme cases, such as when landing on Malbec’s very short runway, make things quite dangerous.

The solution is to go flying early in the morning before the land has had a chance to warm up and for the wind to pick up, or in the evening when the land has had a chance to cool down and the wind to drop. I’m not so much of a fan of flying later so for me the choice is to go in the morning. However, I like to be here if the builders are going to be on site and that has disrupted my flying routine.

But now that there will be no further building activity until September, I can start to think seriously again about flying. I last flew in my Savannah so next time it’ll be the turn of my X-Air. I’ve been checking the weather and it looks as though the wind will be almost calm first thing tomorrow morning, so in order to avoid unnecessary haste and pressure, I thought I’d go and switch the aircraft around in the hangar, take 24ZN’s covers off and run its engine so it’ll be ready to go straight away. Here are a couple of shots after I’d put it back in the front of the barn.

null

null

And for the first time I got two GoPro’s mounted in sensible positions. I’ve not done that before with either of my X-Airs but I thought that it was time to dip into my collection of mounting brackets and see what I could do. The result, perfect! First inside the cabin.

null

Now under the starboard wing.

null

So not only am I now looking forward to an enjoyable flight tomorrow but I’ll also hopefully end up with a decent video too, as a record. Fingers crossed 😉

Giant step

Given the progress that has been made over the past few days, I suspected that there might be some more action today and when I looked out of my caravan door at 7.30 am, sure enough there was small team of three workmen waiting to start work. When I went up to have a word with them, just as I thought, they were waiting to get going laying my house’s floor slab.

A few minutes later, just as before when they’d concreted the foundations all those weeks ago, two large ready-mixed concrete trucks drew up, one with a pump attached and the other with the concrete mix that was going to be poured. It didn’t take them long for the team to get into position and for the trucks to get ready to start pumping the concrete.

null

null

null

null

They started in the farthest corner of the house in what will one day be bedroom 1 and as soon as they started swinging the pump boom around there was a bit of a problem with leaves and twigs being broken off from the oak tree overhead and falling into the fresh concrete. Luckily they saw what was happening and took care to remove the bits and pieces before smoothing the surface over, which I was very pleased to see.

Before the builders return to start putting up the walls, which won’t be until after the summer break, once the concrete has hardened enough I’ll have to get an expert in to cut the branches off as otherwise with the weight of leaves on them there won’t be enough height for the house’s walls, let alone its roof.

null

null

Here are a couple of interesting shots of the two ready-mixed concrete trucks in action.

null

null

With the team of three all working together to pump, spread and smooth out the fresh concrete surface, it was surprising yet again to see how quickly the work progressed. Pretty soon they were working over on the other half of the house and the whole job was finished in under an hour. Amazing!

null

null

null

null

null

I noticed that when the whole slab had been laid, the ‘boss man’ who’s always in charge of the work, went around and marked on the surface where the entrances will be – the three bay windows in the living room and the front door. You can see in the next shot where he roughed up the otherwise smooth surface where each one will be positioned and I’ll be interested to see later on why this was.

null

null

This is him taking a shot of the finished job with his own camera, presumably as a record to take back to the company.

null

And here are a couple of shots of the finished floor slab that I took after all of the workmen had left.

null

null

That’ll now be it for a while, until the beginning of September at least, because of the August shut-down that happens across the whole of France. The foreman told me that he’d be going off to Portugal for his holiday and I wished him well. Before he left he asked me if I’d give the slab a light hosing from time to time after 1.00 pm as if it gets too hot while it’s curing it could start to crack.

I asked him if any retardant had been added to the concrete mix and he said that some had been but that it should still be hosed down to keep it cool, and I said that of course I would. 30 degrees Celsius has been forecast for today, cooler than recently, but I’ll still make sure that the concrete gets a good watering after its surface has had a chance to harden a bit 😉

Been and gone – again

There were noises up on my housebuilding site at around 8.00 am and when I looked out I could see that two workmen were working putting the metal reinforcing mesh in place on top of the ‘hourdis’ in readiness for the floor slab of my house being laid. There wasn’t much to see as all they were doing was laying areas of mesh flat next to each other to cover the whole floor area and finishing up with trimming the last ones to fit into the odd shaped areas that remained as a result of the house’s ‘V’ shape.

They also filled in the gaps between the edge beams so when the concrete is poured onto the floor area it won’t just pour out of the spaces that are present and secured the areas of mesh to each other by applying a few twists of thin wire. They didn’t take very long – they were gone again not long after 9.30 am – and here are some shots that I took after they’d left.

null

null

They also marked out what will be door and bay-window openings in red paint and in the next shot you can see where the front door will be.

null

null

null

It’s lucky that I spent the time I did yesterday evening clipping down the lengths of piping that had been left loose because it wouldn’t have been done today. OK, the weight of the mesh and eventually the concrete will hold the tubing in place but I prefer knowing that the job has been done properly and everything is secured.

The next shot shows the area under bedroom one where I had to place a large number of clips as hardly any were securing the tubing before I did so.

null

Here’s a closer shot of the cut-back where the porch and front door will be.

null

The final three shots show corner details and how wooden blocks have been used to make corner shuttering, so when the concrete floor slab is poured it will be retained and prevented from pouring out from along the sides and corners of the building.

null

null

null

So I’m glad that I took time yesterday evening to properly clip the tubing down as it also gave me an opportunity while I was marching around on the ‘hourdis’ to pick up and dispose of what remained of the leaves and twigs that had dropped down from the oak tree above and fallen onto the floor area and into many little nooks and crannies.

Today I also did a little bit more tidying up. Some heavy plastic cable ties had been used to secure the mesh to the underlying reinforcing bars and had been left long and sticking up above what will be the floor level, so I trimmed those off as well. It should now be all-systems-go for laying the floor slab – whenever that will be… 😐

Pompe à chaleur time

OK, not quite but heading in that direction. All of the heat pumps that I’ve seen being installed in these parts supply underfloor heating, although when I come to think of it, a new one that Victor and Madeleine recently installed blows hot air into the spaces to be warmed. But anyway, mine will supply underfloor heating via plastic pipes embedded in the concrete floor slab and before the concrete can be poured these must obviously be put in place.

There was no sign of life on my house-building site first thing this morning but out of the blue, just before midday, I noticed a solitary figure on site making some measurements. It turned out that it was a single young workman who had come to do exactly that and I left him to it to allow him to get finished as quickly as possible. I shot some video with one of my drones just as he’d done so and was clearing up to go and I was amazed at how much he achieved in the relatively short time that he was here.

Here are some general shots to start off with.

null

null

null

The way the system works is this. The heat pump has a hot supply and a cool return but it wouldn’t be acceptable just to connect these to a single continuous pipe that runs into the floorspace, all around the house and back out again. The heat loss between the entry and the exit would be so great that the rooms nearest the supply would get hot but the ones closer to the exit would become cooler and cooler until the last few in the loop probably wouldn’t heat up at all.

To get around this several loops of piping are laid in the house, each one warming up a different section of the building. Each one has a beginning, connected to the heat pump’s supply, and an end, connected to the pump’s return and all of these are connected to the pump via what is called a manifold, another name for a valve with many connections. This manifold is mounted on a wall in a convenient location, in my case in what will be the cloak cupboard in the entrance foyer, and it can be seen standing upright, but covered for protection, in the next few images.

null

null

null

null

In the above shots the manifold is mounted on a wire frame, a placeholder if you like. I don’t know if it will stay in position after the house is finished, but if it does I hope that it will not be visible, although I’d prefer it to be removed. You can see in the next couple of shots how tubing goes from the manifold to all parts of the house and back again with the hot ‘supplies’ marked in red and the cooler ‘returns’ in blue.

null

null

The exception to this is the area near where the front door will be and the reason for this is because it will be outside in the porch area, which is why it has been marked off.

null

Finally, a couple more general shots to finish off and show how the whole of the house’s floor area has been covered.

null

null

The piping has been laid directly over the polystyrene ‘hourdis’, the plastic bridges between the floor beams that will support the concrete floor slab. It’s been held in place by plastic staples and before he left, the technician carefully conducted pressure tests on each section to ensure that there won’t be any leaks. Reinforcing steel mesh will be laid over the top of it before the concrete is poured and the builder is obviously confident following the checks that there won’t be any problems with leaks or anything else once the concrete has been laid.

I noticed that the technician has only laid the underfloor heating pipes and has not put the main supply and return in between the manifold and where the heat pump will be (outside on the corner of bedroom two). Presumably he’s left those for the heat pump people to do and they will take responsibility for installing and testing them when the time comes.

Footnote

I just came back to say that I now think I’m beginning to get the picture. When I went up to see how things were going at the end of the afternoon the young guy was finishing clearing up and he was taking lots of photos with his phone showing what he’d done. Then he finished completely and left. When I went up again at the beginning of the evening I noticed something.

There was a large heap of the clips that are used to hold down the tubing on the ‘hourdis’ left over and some more in the rubbish bin and when I looked more closely at the whole job it was obvious that at the end where he’d started, the living room end, the tubing loops were all evenly laid out and neatly clipped down, but at the other end of the building, the bedroom end where he’d finished, the same could definitely not be said. The loops were fairly evenly spaced but half of them were hardly clipped down at all and those that were only had only around half of the number of clips that they really needed to hold them securely in place.

The conclusion was obvious. He’d been instructed that he was only permitted to spend a certain number of hours on the job and no more and as time wore on he realised that he would have to skimp the last part. Consequently he’d finished off doing the minimum necessary before skipping off when the time limit was up.

Now I begin to understand why so few workers are being allocated to my job and why, when they have turned up, they leave again so quickly. Luckily on this occasion I was able to spend an hour or so collecting together all of the unused clips and then going over the floor area pinning down the areas of tubing that needed to be made more secure.

This is the first time that I’ve been disappointed by the work done by the builder but now that I know this, in future I’ll keep an even closer eye than I have been on what’s going on.

Video – housebuild day 7

This video was actually shot quite a way back on 25th May. After a further delay of three weeks since the last time, the builder sent an excavator with driver whose job it was to begin back-filling the hole in which the house’s foundations had been built. The aim was to build up the level of the land around the house’s structure while leaving the space beneath it empty. This space is called a ‘vide sanitaire’ and is useful for insulation purposes and to provide future access if necessary to the services – water and electricity – running under the house.

Due to the amount of material that will be needed to raise the ground level at the rear of the house to the level of the house itself, it is clear that there is insufficient earth and that more will have to be brought in towards the end of the project to complete the job.

House construction day 10 – images

These are the images from yesterday. Two workmen were on site by 7.30 am and when I went to greet them they’d already been working for well over an hour. I said that they must have got up very early that morning and they replied that yes, they had, because of the heat. They started by marking the ‘houdris’ (the polystyrene bridges between the floor beams that will eventually support the concrete floor slab) with red paint everywhere that a pipe or tube would emerge from underneath.

These pipes and tubes will carry the services – plastic tubing (‘gaine’) that will contain the incoming electricity cables, the incoming water pipes and the larger outgoing plastic pipes that will carry waste water into the waste treatment system (‘système d’assainissement’). Then they lifted each affected ‘houdris’ and made cut-outs before inserting the appropriate service or tube upwards through the floor from the space beneath (the ‘vide sanitaire’) which they’d entered into through a gap left for the purpose in the front of the house near where the front door will be (see later).

In a similar way the large diameter plastic pipes that will eventually carry waste water out to the ‘système d’assainissement’ exited the ‘vide sanitaire’ through spaces left for them below the northern end of the house below where bedrooms one and two will be (also see later). However, there was one difference for these pipes. Whereas the incoming water pipe and ‘gaine’ containing the electricity cable can be treated quite casually, even being allowed to rest on the earth below the ‘vide sanitaire’, the same is not true for the outgoing pipes containing the waste water.

The reason is that these must be carefully mounted with a slight downward fall so the waste water flows down and out of the building and in order to achieve that the pipes have to be suspended on cables or, as in this case, chains. The chains are, in turn attached to special suspension points which are also mounted into the ‘houdris’, so it becomes clear that quite a lot of experience and skill is required in order to do the job of installing the services properly, especially bearing in mind that they would soon be encased permanently in concrete.

The next five shots show the two workmen working after they’d cut out the ‘houdris’ to accept the various services and had then replaced them with the pipes and tubes in their correct positions sticking upwards through the floor.

null

null

null

null

null

The next shot shows the finished floor base with plastic mesh covering the main beam joints and the open pipe and tube ends temporarily sealed with orange plastic tape to prevent accidental ingress of concrete when the floor slab is eventually poured. You can also see a few of the black hanging points from which the chains supporting the large bore plastic pipes feeding the waste water system are suspended beneath the floor.

null

The next shot shows the gap left in the front of the house below where the front door will be to allow the electricity and water services to enter the under-floor space.

null

Here’s the open (but plugged) external end of the water pipe that will eventually run outside underground to connect the house to the mains.

null

The next shot shows what will be one of the waste water outlets in the kitchen. There will be two – one where the sink will be and the other to take the water from the dishwasher. This will be highly advantageous as it will save having to join the two waste systems up behind the fitted kitchen units as is usually the case. Note how the base of the piping is sealed with plastic foam that will rigidly hold it in position when the concrete floor slab is poured.

null

The next shot shows the piping that will feed the waste water system where it exits the house. The closest one is from the kitchen (the two outlets mentioned above have been joined under the floor), the next two are from the basin and WC in the bathroom and the furthest two are from the bathroom shower and the separate WC. Older systems meant that you had to separate ‘grey’ and ‘black’ water but newer systems like the one I’m having (‘toutes eaux’ meaning all waters) allow for all of the waste water from whatever source to feed into the single treatment chamber.

null

This final shot from the day’s work shows the waste water outlet pipe coming from the kitchen and also just visible is one of the securing chains from which it is suspended.

null

In my previous post I mentioned that about mid-morning the whole area was blanketed by thick smoke that was carried by the wind from the wild-fires in the Gironde and even further afield. The next few shots show exactly what I was talking about.

null

null

null

The smoke also returned once briefly during the afternoon but then dispersed and hasn’t returned since. The extreme heat has been the source of some major disasters both here in France, in the UK and further afield. Thankfully although there have been some serious losses of land and property the number of lives lost seems to have been quite small and hopefully things will stay that way. In comparison, my constructional problems pale into insignificance.

Ca marche!

After a break of several weeks, about five actually, I was awoken this morning at 7.30 am by sounds up on my house-building site. When I ambled up to investigate, two workers had been busy for over half-an-hour removing sections of the plastic ‘hourdis’ (the bridging between the beams that will support the concrete floor) in order to put the various services in place (water, electricity cables, waste outlet pipes) in advance of the concrete slab being laid.

I saw 42 degrees Celsius on my car temperature gauge yesterday but it will be cooler today, 36 degrees by the end of the afternoon, and even cooler tomorrow, so I asked if the concrete will be laid tomorrow when it will be more suitable. From what I could gather, it appears not. It looks as though the services will be installed and also all the under-floor pipework for the heat pump and the workman I spoke to said he wasn’t sure when the concrete is scheduled for.

This makes much more sense than the picture that I was originally given last week by ‘the office’. I always thought as I said at the time that it would make more sense to have the services in before laying the concrete and I didn’t think that there’d be two layers, one on the ‘hourdis’ and then another to cover the heat pump tubing. But anyway, all should become clearer as the day unfolds!

It’s now just after 10.00 am and all of a sudden we’ve been subjected to something rather weird. The whole area has become blanketed with what at first appears to be fog, except it’s not. The smell gives it away. It’s smoke. Being rather concerned I launched one of my drones to take some shots of the work that’s being done ‘up top’ but also to get up higher to see if I could see what’s going on.

I’m glad to say that there don’t seem to be any fires in the vicinity and the conclusion I’ve come to is that we’ve been enveloped by smoke carried by the wind from the fires that are currently raging in the south and west. At least I hope that that’s the case, anyway. If I’m right it gives an indication of the disaster that’s occurring in those parts 🙁

Good news at last?

After a period of rising tension between myself and my housebuilder and a series of unanswered emails (my main gripe – French friends say that poor communication by builders is ‘normal’) I at last received an update this morning.

I have updated the house’s ‘technical plan’ for its services since the builder’s initial stab at it and arrived at what will be the final version a couple of weeks ago. I’ve now got all the positions sorted for where I want plugs, switches, outside taps and exterior lights to be and shown where I want all the ceiling lights to be sited as I’m having LED spots throughout the house. This will be an extra but better to have them installed during construction rather than later.

I sent the plan over a while ago together with requests for some other information and in the meantime received a deathly silence. So I sent them again… and then again, the last time with the comment that if I did not receive an answer I would escalate the situation.

As a French neighbour who recently moved into their new house told me, the builders are not used to someone being there. She said that on several occasions her husband received assurances from their builder that such-and-such would be done ‘next week’ but when they managed to get onto site a couple of weeks or so later, nothing would have been done. My builder is probably squirming because I’m there, on site, the whole time, so they can’t get away with making hollow assurances that you can’t find out about until it’s too late.

But anyway, the message I received this morning assured me that the concrete floor slab would be laid for my house, thus covering and protecting the plastic ‘houdris’ between the floor beams that will support the slab until it has cured, in the second half of next week. It also said that then they will continue on to install the incoming services and outgoing waste pipes followed by the additional slab for the heating pipes for the heat pump, but I noted that the message didn’t specify when exactly the latter would be… 😐

But I was happy with that. They’ve not let me down yet when they’ve told me when they’ll be doing something – it’s just that they’re reluctant to do so. I mainly want to get the base slab down so the plastics are protected from the blazing sun that we’re enduring this year – 41 degrees C today and for the coming few days also.

The plastics are also getting covered in vegetable debris, twigs and leaves from the overhanging trees, and once the slab is down I’ll be able to get a specialist in to cut and remove the branches in question, which are hanging very low with the weight of their leaves, before building proper commences. The message said that the services would be installed after the slab has gone down, which will mean drilling the floor in several locations, probably while the concrete is still ‘green’ and not fully cured.

This will mean having to miss the reinforcing metal that it will contain when drilling, but I guess they think that that will be simpler than having to secure the services vertically in place where they rise up through the floor and accurately holding them in situ while concrete is being poured around them with little possibility of replacing them if they were moved during the process, depending on where they were sited in the building.

If the slab is down and the services in by the end of this month that will be OK by me, as I presume that they’ll then all go off on holiday for the month of August. If so, that’ll give me time to get the tree work done and will also ensure that the slab is well cured before they get back and resume work.

So some good news at last. On another front, I’m rather concerned for the welfare of my new little cherry trees in the light of the extreme temperatures that we’re getting just now. They are in desperate need of water but when I tip water on the ground around their bases, it just runs off because the ground is so dry and hard.

I’ve ordered a garden fork but it won’t be here for a few more days, so what I did was grab a short length of straight reinforcing rod from ‘up top’ on the building site and puncture the ground around the base of each tree, making sure not to go too deep so as not to damage their roots. I then slowly poured a watering can-full of water (11 litres) on the ground around each one and watched it sink in. I could see that it was doing so because the water level in each small hole rose to the surface and then fell again as it was absorbed by the soil and compost that I’d placed around the roots.

I’d estimate that only 1 litre at most was lost of the 11 litres poured around each tree, so hopefully this will do the trick for the time being. I’ll also keep repeating the process until this exceptionally hot spell is over and maybe I’ll try pouring a few litres around my own roots while I’m at it 😉

My housebuild project – day 6

It was over 6 weeks since the builders were last on site and I was becoming very concerned about the delays which were occurring. This day they positioned the main concrete beams onto the columns that they put in place 6 weeks previously, that will eventually take the weight of the whole house.

I know the beams had to be fabricated off-site in a precast concrete factory which required a certain lead-time but the builder had all of the dimensions etc right at the beginning of the project and did all of the stress and weight calculations themselves. So they could have placed the order in early March, and perhaps they did for all I know, so as I am not aware of the lead-time required for items such as these, for now I will give them the benefit of the doubt.

I’ve got another couple of videos in the pipeline but have been in no hurry to publish them precisely because progress has been so slow in the meantime. The fact is that all of the materials to run the services and utilities to and from the property have been on site (and paid for by me) for several weeks but the builders have been dragging their feet to actually do the work to the point that it’s now almost approaching becoming a dispute between us. More details will be provided in future videos.

Wanna see my plums?

Back in 2021, when they heard that I was buying the land that I now own in Fleurac and was going to build a house on it, my lovely friends presented me with two small fruit trees as birthday gifts. They stayed at my neighbour, Chantal’s, house and she watered and looked after them for me until I eventually brought them over to Labattut and planted them earlier this year.

Both have done well. Both produced blossom in the spring and although the little apple tree succeeded in converting one blossom to a single tiny fruit, that eventually dropped off, so I’ll have to wait to see if it will do better next year.

The other tree, a plum, has however proven to be a triumph. It has managed to produce and maintain a total of six small plums all of which are doing well and are now well on the way to becoming fully ripe, as the following two pics show.

null

null

OK, six plums are a bit different to the hundreds (if not thousands) that I got from the trees that I had at my old house, from which I made some lovely jam.

null

Many of them ended up littering my lawn making it difficult to mow. Because of that they were something of a pest, actually, as there were just too many of them for me to use.

I doubt that that will be a problem with my one (so far) little plum tree and I can’t wait to see how it grows and develops over the years to come. I’m also looking forward to seeing how my little cherry trees do and hope that I’m around for long enough to see some bumper harvests 😉

The little devils came back!

One evening a week or so ago I glanced out of my caravan window as this is what I saw.

null

Then I went outside to get some clearer pics and although you can’t see it in the next shots, the little devils stood and watched while I did so.

null

null

Mostly they seemed to be quite small, young pigs and some of them even still had stripes on their backs, so it’s probable that they were from this year’s litters. The problem with that is that as the hunting season finished at the end of March, it’s likely that they haven’t come across hunters before and haven’t heard the sound of guns, so they’re not yet unduly afraid of humans.

I then decided that enough was enough and putting on my best wild-man impression I ran towards them shouting and waving my arms. That initially worked and they scuttled off into the tree line, only to re-emerge a few moments later, so as I couldn’t see any large adult pigs amongst them I repeated the process except this time I continued running closer towards them until they’d all run away.

This did the trick and not long afterwards I spotted them all on the field in the valley below my land. They were too far away to wave my arms at so this time I let out a very loud whistle. And surprisingly, this did the trick as the whole herd belted off into the trees on the other side of the field that they were destroying and this time didn’t come back.

Was it worth the effort? I’d say so, because as the following shots show, even in the short time that they were on the land next to mine they did considerable damage.

null

null

Although I’ve now erected quite a bit of fencing, my land is still not fully enclosed and won’t be until the building work on my house is much further advanced. Having had to repair so much damage caused by these blighters in the past, anything I can do to prevent their returning will be worth it. Even if it means putting my wild-man impression on a few more times in the future.