Video – housebuild day 7

This video was actually shot quite a way back on 25th May. After a further delay of three weeks since the last time, the builder sent an excavator with driver whose job it was to begin back-filling the hole in which the house’s foundations had been built. The aim was to build up the level of the land around the house’s structure while leaving the space beneath it empty. This space is called a ‘vide sanitaire’ and is useful for insulation purposes and to provide future access if necessary to the services – water and electricity – running under the house.

Due to the amount of material that will be needed to raise the ground level at the rear of the house to the level of the house itself, it is clear that there is insufficient earth and that more will have to be brought in towards the end of the project to complete the job.