These are the images from yesterday. Two workmen were on site by 7.30 am and when I went to greet them they’d already been working for well over an hour. I said that they must have got up very early that morning and they replied that yes, they had, because of the heat. They started by marking the ‘houdris’ (the polystyrene bridges between the floor beams that will eventually support the concrete floor slab) with red paint everywhere that a pipe or tube would emerge from underneath.
These pipes and tubes will carry the services – plastic tubing (‘gaine’) that will contain the incoming electricity cables, the incoming water pipes and the larger outgoing plastic pipes that will carry waste water into the waste treatment system (‘système d’assainissement’). Then they lifted each affected ‘houdris’ and made cut-outs before inserting the appropriate service or tube upwards through the floor from the space beneath (the ‘vide sanitaire’) which they’d entered into through a gap left for the purpose in the front of the house near where the front door will be (see later).
In a similar way the large diameter plastic pipes that will eventually carry waste water out to the ‘système d’assainissement’ exited the ‘vide sanitaire’ through spaces left for them below the northern end of the house below where bedrooms one and two will be (also see later). However, there was one difference for these pipes. Whereas the incoming water pipe and ‘gaine’ containing the electricity cable can be treated quite casually, even being allowed to rest on the earth below the ‘vide sanitaire’, the same is not true for the outgoing pipes containing the waste water.
The reason is that these must be carefully mounted with a slight downward fall so the waste water flows down and out of the building and in order to achieve that the pipes have to be suspended on cables or, as in this case, chains. The chains are, in turn attached to special suspension points which are also mounted into the ‘houdris’, so it becomes clear that quite a lot of experience and skill is required in order to do the job of installing the services properly, especially bearing in mind that they would soon be encased permanently in concrete.
The next five shots show the two workmen working after they’d cut out the ‘houdris’ to accept the various services and had then replaced them with the pipes and tubes in their correct positions sticking upwards through the floor.
The next shot shows the finished floor base with plastic mesh covering the main beam joints and the open pipe and tube ends temporarily sealed with orange plastic tape to prevent accidental ingress of concrete when the floor slab is eventually poured. You can also see a few of the black hanging points from which the chains supporting the large bore plastic pipes feeding the waste water system are suspended beneath the floor.
The next shot shows the gap left in the front of the house below where the front door will be to allow the electricity and water services to enter the under-floor space.
Here’s the open (but plugged) external end of the water pipe that will eventually run outside underground to connect the house to the mains.
The next shot shows what will be one of the waste water outlets in the kitchen. There will be two – one where the sink will be and the other to take the water from the dishwasher. This will be highly advantageous as it will save having to join the two waste systems up behind the fitted kitchen units as is usually the case. Note how the base of the piping is sealed with plastic foam that will rigidly hold it in position when the concrete floor slab is poured.
The next shot shows the piping that will feed the waste water system where it exits the house. The closest one is from the kitchen (the two outlets mentioned above have been joined under the floor), the next two are from the basin and WC in the bathroom and the furthest two are from the bathroom shower and the separate WC. Older systems meant that you had to separate ‘grey’ and ‘black’ water but newer systems like the one I’m having (‘toutes eaux’ meaning all waters) allow for all of the waste water from whatever source to feed into the single treatment chamber.
This final shot from the day’s work shows the waste water outlet pipe coming from the kitchen and also just visible is one of the securing chains from which it is suspended.
In my previous post I mentioned that about mid-morning the whole area was blanketed by thick smoke that was carried by the wind from the wild-fires in the Gironde and even further afield. The next few shots show exactly what I was talking about.
The smoke also returned once briefly during the afternoon but then dispersed and hasn’t returned since. The extreme heat has been the source of some major disasters both here in France, in the UK and further afield. Thankfully although there have been some serious losses of land and property the number of lives lost seems to have been quite small and hopefully things will stay that way. In comparison, my constructional problems pale into insignificance.