After a period of rising tension between myself and my housebuilder and a series of unanswered emails (my main gripe – French friends say that poor communication by builders is ‘normal’) I at last received an update this morning.
I have updated the house’s ‘technical plan’ for its services since the builder’s initial stab at it and arrived at what will be the final version a couple of weeks ago. I’ve now got all the positions sorted for where I want plugs, switches, outside taps and exterior lights to be and shown where I want all the ceiling lights to be sited as I’m having LED spots throughout the house. This will be an extra but better to have them installed during construction rather than later.
I sent the plan over a while ago together with requests for some other information and in the meantime received a deathly silence. So I sent them again… and then again, the last time with the comment that if I did not receive an answer I would escalate the situation.
As a French neighbour who recently moved into their new house told me, the builders are not used to someone being there. She said that on several occasions her husband received assurances from their builder that such-and-such would be done ‘next week’ but when they managed to get onto site a couple of weeks or so later, nothing would have been done. My builder is probably squirming because I’m there, on site, the whole time, so they can’t get away with making hollow assurances that you can’t find out about until it’s too late.
But anyway, the message I received this morning assured me that the concrete floor slab would be laid for my house, thus covering and protecting the plastic ‘houdris’ between the floor beams that will support the slab until it has cured, in the second half of next week. It also said that then they will continue on to install the incoming services and outgoing waste pipes followed by the additional slab for the heating pipes for the heat pump, but I noted that the message didn’t specify when exactly the latter would be… 😐
But I was happy with that. They’ve not let me down yet when they’ve told me when they’ll be doing something – it’s just that they’re reluctant to do so. I mainly want to get the base slab down so the plastics are protected from the blazing sun that we’re enduring this year – 41 degrees C today and for the coming few days also.
The plastics are also getting covered in vegetable debris, twigs and leaves from the overhanging trees, and once the slab is down I’ll be able to get a specialist in to cut and remove the branches in question, which are hanging very low with the weight of their leaves, before building proper commences. The message said that the services would be installed after the slab has gone down, which will mean drilling the floor in several locations, probably while the concrete is still ‘green’ and not fully cured.
This will mean having to miss the reinforcing metal that it will contain when drilling, but I guess they think that that will be simpler than having to secure the services vertically in place where they rise up through the floor and accurately holding them in situ while concrete is being poured around them with little possibility of replacing them if they were moved during the process, depending on where they were sited in the building.
If the slab is down and the services in by the end of this month that will be OK by me, as I presume that they’ll then all go off on holiday for the month of August. If so, that’ll give me time to get the tree work done and will also ensure that the slab is well cured before they get back and resume work.
So some good news at last. On another front, I’m rather concerned for the welfare of my new little cherry trees in the light of the extreme temperatures that we’re getting just now. They are in desperate need of water but when I tip water on the ground around their bases, it just runs off because the ground is so dry and hard.
I’ve ordered a garden fork but it won’t be here for a few more days, so what I did was grab a short length of straight reinforcing rod from ‘up top’ on the building site and puncture the ground around the base of each tree, making sure not to go too deep so as not to damage their roots. I then slowly poured a watering can-full of water (11 litres) on the ground around each one and watched it sink in. I could see that it was doing so because the water level in each small hole rose to the surface and then fell again as it was absorbed by the soil and compost that I’d placed around the roots.
I’d estimate that only 1 litre at most was lost of the 11 litres poured around each tree, so hopefully this will do the trick for the time being. I’ll also keep repeating the process until this exceptionally hot spell is over and maybe I’ll try pouring a few litres around my own roots while I’m at it 😉