Giant step

Given the progress that has been made over the past few days, I suspected that there might be some more action today and when I looked out of my caravan door at 7.30 am, sure enough there was small team of three workmen waiting to start work. When I went up to have a word with them, just as I thought, they were waiting to get going laying my house’s floor slab.

A few minutes later, just as before when they’d concreted the foundations all those weeks ago, two large ready-mixed concrete trucks drew up, one with a pump attached and the other with the concrete mix that was going to be poured. It didn’t take them long for the team to get into position and for the trucks to get ready to start pumping the concrete.

null

null

null

null

They started in the farthest corner of the house in what will one day be bedroom 1 and as soon as they started swinging the pump boom around there was a bit of a problem with leaves and twigs being broken off from the oak tree overhead and falling into the fresh concrete. Luckily they saw what was happening and took care to remove the bits and pieces before smoothing the surface over, which I was very pleased to see.

Before the builders return to start putting up the walls, which won’t be until after the summer break, once the concrete has hardened enough I’ll have to get an expert in to cut the branches off as otherwise with the weight of leaves on them there won’t be enough height for the house’s walls, let alone its roof.

null

null

Here are a couple of interesting shots of the two ready-mixed concrete trucks in action.

null

null

With the team of three all working together to pump, spread and smooth out the fresh concrete surface, it was surprising yet again to see how quickly the work progressed. Pretty soon they were working over on the other half of the house and the whole job was finished in under an hour. Amazing!

null

null

null

null

null

I noticed that when the whole slab had been laid, the ‘boss man’ who’s always in charge of the work, went around and marked on the surface where the entrances will be – the three bay windows in the living room and the front door. You can see in the next shot where he roughed up the otherwise smooth surface where each one will be positioned and I’ll be interested to see later on why this was.

null

null

This is him taking a shot of the finished job with his own camera, presumably as a record to take back to the company.

null

And here are a couple of shots of the finished floor slab that I took after all of the workmen had left.

null

null

That’ll now be it for a while, until the beginning of September at least, because of the August shut-down that happens across the whole of France. The foreman told me that he’d be going off to Portugal for his holiday and I wished him well. Before he left he asked me if I’d give the slab a light hosing from time to time after 1.00 pm as if it gets too hot while it’s curing it could start to crack.

I asked him if any retardant had been added to the concrete mix and he said that some had been but that it should still be hosed down to keep it cool, and I said that of course I would. 30 degrees Celsius has been forecast for today, cooler than recently, but I’ll still make sure that the concrete gets a good watering after its surface has had a chance to harden a bit 😉