Early wrap

The two-man team working on the interior arrived at around 9.00 am and got cracking on filling the small hole in the ceiling left over from yesterday, sealing the gaps between the ceiling and the walls with foam and putting the metal framework up that will hold the insulation and support the dry-lining that will make up the interior surfaces of the external walls.

However, something must have happened, maybe a problem on another job that needed their attention or something like that, because they abruptly locked up and left for the day just before noon. They left all their tools behind and told me that they’d be back on Monday as usual so that was an early wrap for work this week.

The pictures I took show that they only put up one horizontal wall bar around the whole house before leaving for the day.

null

null

null

null

null

In the next shot, that’s one of my new doors leaning against the wall over on the right. They said they’d like to have one for when they start working on the interior partition walls, so they can get the doorway aperture dimensions exactly right.

null

null

null

null

null

null

Here are a couple of shots showing how they’ve sealed the ceiling edges.

null

null

I’m really pleased with their work. The quality is excellent. The whole ceiling surface is really level and there are no joint gaps as far as I can see between any of the sheets. If the partition walls are of the same standard the completed interior will be amazing 😉