Still going

Despite the other issues which are presently preoccupying me and taking up lots of my time I’m determined to keep moving forward with the work I plan to do in my garden and around the house for as long as I can (and then continuing after my treatment if it prevents me from doing so). So my main focus is on laying the concrete base for my planned garden store/workshop at the bottom of my land and as I showed in my last post, I’ve dug out the ground as deep as I want to go and now I need to prep it for pouring the concrete.

To do that I need to compact the area, lay a sub-base and compact it again, put shuttering in place all around it, drop in a plastic membrane and put reinforcing steel in on top of that. To do the compacting that is required I need to use a machine because as the base I laid for the tool store I built in the garden of my old house at Plazac showed, doing it by hand, especially if there are tree roots in the area, is not enough and it will start to crack up after a year or two.

This got me thinking. As I’ve mentioned previously, my house builder did a lousy job of compacting the areas close to and around my house and on top of that, there was insufficient earth available when it came time to back-fill the ‘vide sanitaire’ (space) left below my house at the end of construction as it’s built on a platform standing on columns. As a result the ground around my house is collapsing, vertically downwards over time as it self-compacts and into the ‘vide sanitaire’ as the earth in the space falls backwards to level itself out.

I’ve now lifted all the paving slabs on my terrace and along the side of the house and you can see from the pictures below what I’m talking about. Incidentally, I’ve now moved everything that was on my terrace out to the front and under cover to protect it from the winter weather and also used the slabs to protect the wood from my proposed swimming pool that would otherwise be standing outside for a second winter with its sides totally exposed. Now it should stay dry.

The collapsing ground is not problem, quite the opposite actually, as the builder laid black stone around the house and in the driveway when I actually wanted white. This means that I can ‘lose’ a lot of the black stone by pushing it (with my excavator hopefully) into the vide sanitaire and also using more of it as a sub-base for my new workshop rather than running in ‘remblais’ (filling material) from my neighbour’s property, which is what I was originally thinking of doing.

But in any case, there will be a lot more compacting to do than just the base for the new workshop. The sloping area that I’ve extended behind my house will need to be compacted as well as the areas that I’m levelling in the front garden. I will need to compact all of the pathway areas around my house including the new terrace when the time comes plus the whole of the driveway when I lay new white stone. I’ll also need to compact the trench that I’ll dig over the length of my back garden for an electricity supply for the new workshop and I’m guessing that as time progresses I’ll find many other areas as well.

My original thought was to hire a compactor. If I go to one of the local hire companies a suitable machine costs around 70€ for a day’s hire. However, if I hire a machine from Leroy Merlin, the DIY superstore in Chancellade, I can pick one up for 39€ a day at the time of writing. But wait for it! Allowing for work pauses, bad weather and the many other disruptions that always occur, for how many days will I need a compactor for just the work I’ve listed above? 8 days, 10 days, 20 days? I don’t know for sure, but I’m guessing at least 5-10 days if it was possible for me to do all of the jobs consecutively without stopping. But that would be impossible, of course.

So I decided to go in a different direction. Scheppach, a German company, manufacture a range of many types of machinery including motorised compactors of various sizes. I won’t need a heavy-weight pro type machine but I will need one that is capable of doing more than just levelling paving slabs on garden paths. After checking their range out, I decided to buy their model HP1200S. Why not just hire a machine as you originally intended you might ask? Because this machine, which was delivered in just two days earlier this afternoon, cost me only 390€ including delivery, so not much more than the cost of hiring a machine for 10 days or so. And it’s mine to use as and when I want and I’ll also have it to sell, like my excavator and dumper, when I’ve finished all my work, thus reducing my costs even further.

What’s not to like! Now all I need to do is attach its handle, add oil and top up its fuel tank before giving it a go. Watch this space 😉