It’s late Sunday evening and my family will be arriving from England during the late afternoon tomorrow for a 2-week visit. My target was to get all of my new kitchen floor units together with the new hob and sink units installed and working in time for their arrival so we would at least have the basic facilities that I’ve done without since I arrived here but which will be essential with a larger group of people in the house. And I’ve succeeded – just 😀
The panic to do with my new jigsaw was just that – they are not really designed to cut in clean, absolutely straight lines. You need a hand-held circular saw for that, and after I’d bought myself one of those, progress resumed once again. In fact, it didn’t take long at all to get the smaller of the two worktops cut to size and installed.
But that was the easy one, of course and the challenge was to get the large one cut to size and lifted into place. My problem was that this was Friday evening and after cutting it to size, there was nobody around to give me hand to lift it up and manoeuvre it into place. I tested it for weight and as I’d now split a few centimetres off its width and shortened it a bit, I decided that I’d be able to lift it myself. But lifting it was just one of the problems – having eyes to see in two directions at once was the other (one of the advantages of having a helper) and I’m sad to say that in one unguarded moment, I caught the edge of the other short worktop with the aluminium joining strip that I’d attached to the end of the large worktop and marked it. I was terribly disappointed, naturally, but there was no point crying over spilt milk and I had to press on towards my deadline and think about how how I’d do the small repair that would be needed (since done and not a total disaster – if necessary I can always replace the worktop, that I haven’t yet screwed down, some time in the future when I install the wall units) 🙁
Then I had to mark out and cut out for the hob and sink units, without removing the large worktop, otherwise I’d probably have done more damage. Cutting out for the hob unit was possible ‘in situ’ because the hob is smaller than the unit it now stands on and cutting out for the sink unit was done just by placing several blocks at one end of the worktop to raise it clear of the base units underneath.
I’m pleased to say that my connecting pipework for the hob lined up tolerably well, which was a relief, and after changing the burner jets to ones suitable for 28 mBar bottled gas, I eventually got the hob to work after trying fruitlessly for several minutes and then remembering that my regulator (outside on the gas bottle) has a safety press-button, that you need to press and hold for a while when you connect it up for the first time. Panic over 😕
Fitting the sink was quite time-consuming, the main reason being that I’d chosen one without a hole for a tap unit. I’d decided that I would drill a hole in it myself, as I didn’t want to have my mixer tap fitted in the worktop surface. It was a tough job but I ultimately succeeded in doing what I wanted to. I also had to make up a large packing piece to go under the surface of the sink unit itself to secure the mixer tap that I had, connect up the hot and cold supplies that I put in place several days ago and finally fabricate quite a complex plastic waste system.
Today I had to cut out the last two shelves to accomodate the waste system, make up the final drawer unit and fit the remaining doors, and I eventually attained my target of having a basic working kitchen late this afternoon.
I’ve now put away all of my tools and cleared the kitchen ready for me to start cleaning the whole house through tomorrow. With a bit of luck I should be all finished and looking serene, with a smashing salad and cold drinks ready and waiting for when they arrive. Fingers crossed 😉