French lunch break?

If I’m not careful I shall start to adopt the French habit of downing-tools at the drop of a hat for an extended lunch! I began pointing my fireplace this morning but didn’t really get going as early as I should have. When the mortar that I’d mixed ran out at about 12.30pm that was my excuse to wash my buckets and trowels and have my lunch. It’s already nearly 1.45pm and at this rate I won’t get started again until 2.00pm at the earliest so I’ll have had a lunch break of truly French proportions 🙂

Once again, it’s not a very nice day to be doing anything that involves going outside. We’re still stuck in this high pressure ‘anti-cyclonic gloom’ which means that it’s cold and misty and everything is dripping wet. So every time I go outside to get anything it’s like being in a Scotch mist and when I come back indoors I walk in mud and soggy leaves, which is getting very annoying. The last time, it had begun to gently drizzle so I had to cover the new sand, which is still in my open trailer, with a small tarpaulin that I bought yesterday to stop it getting too wet.

null

null

When I go down to Montignac, as I did yesterday, I leave the mist behind and it’s just dull but as I come back up the hill to my house, I ascend into the cloud base which must be just about at the level of the tops of the hills around Plazac. I went to Montignac yesterday for the best of reasons. First, I needed to replace the ‘water squirter’ bottle that I’d left behind in England (I’m finding that I could now do with more and more of the things from my old garage that I left behind) because it’s the best way to damp down the joints on my fireplace that I want to point in, and while I was in ‘les Briconautes’ I also took the opportunity to buy a hose pipe. But the highlight of the visit came when I then dropped into Point.P from where I’d received a phone call a little bit earlier to pick up the further four ‘parefeuille’ floor tiles that the lovely lady there had managed to find for me after I’d mentioned it to her the other day. How good of her was that!

So I’ve now got more than enough to do the floor in my ‘sejour’, which is really good news and means that I can now press on at full speed to sort out my ‘cheminee’ and get my wood-burner installed. And the other bit of good news is that as I’ve been typing this, I’ve checked the bit of pointing that I did this morning and it looks as though it will dry out to be the perfect colour. So now I must get off my lunch break and back to work – well, after I’ve had a quick cuppa that is 😉

7.55pm and I’m back to say that although I haven’t finished, the job has gone well today. The mortar hasn’t by any means dried, but the one or two very thin areas which are the most dry have come up satisfying light. The rest still looks pretty dark so I’ll have to wait and see how it looks tomorrow. Although we have had a succession of horrible misty, damp days, we haven’t had rain for a little while. The annoying thing is that this evening it’s decided to give us a hard drizzle, which has resulted in a small amount of water running down the chimney and over an area of the pointing. So far it doesn’t look to have done any harm so I’m keeping my fingers crossed that it stays that way 😐

2 thoughts on “French lunch break?”

  1. Cheers Russ. Only problem is that while my wood-burner is just standing there, I’m using my electric heating all the time. Due to a problem I’ve got with EDF I’m keeping a daily record of the electricity I’m using and it’s coming out at 6/7€ per day, which is a lot more than wood would be costing me. Not a lot I can do about it though until I’ve finished the job so I just have to keep going until it’s done 😐

Comments are closed.