And it’s becoming very frustrating. Partly it’s to do with the time of the year and the weather has a lot to do with it too. I’m part-way into the work on my fireplace and the job ground to a halt with the snow which made going outside for materials just about impossible. Since the snow disappeared, apart from a couple of short breaks, we’ve had almost continuous rain which certainly doesn’t help things along. When I took the dog out this morning it was dull and misty and down here it doesn’t take much for that to turn into horrible drizzle. And as I type this that’s exactly what we’ve got and have had for the past couple of hours or so.
I’ve got things in the UK that I bought to help with the work I want to do on the X-Air which I’ve put off having shipped over in case I order anything else that could be added to the parcel. But even if I had the stuff here I couldn’t do anything with it because of the ruddy weather! I think I’ll have to take up Wim’s idea of making a temporary shelter outside to do the work on the X-Air in, when the time comes, but even pushing forward with the construction of that isn’t exactly straightforward all the while it’s raining 😐
I was talking to my mother this morning and she suggested that while I’m waiting, why don’t I start on my kitchen? The problem with that idea is that the first step will be to pull the existing ceiling down which will make a terrible mess and quite honestly, I couldn’t face having a mess in the kitchen and a mess in my living room at the same time, and both jobs only part-done. Looking on the bright side, we really only have February to get through before we can expect the weather to start warming up a bit and then hopefully it will be possible to break what is becoming a bit of a log-jam. Until then, I guess I’ll just have to make what forward advances that I can, in whatever breaks in the weather just happen to come along 🙁