All now clear

As soon as you examine the rear of the Savannah’s little high level panel you understand why whoever ‘installed’ (and I use that word very loosely…) it butchered the front of the tray in which it’s mounted in the way that they did.

null

They thought that they’d go all ‘Airbus’ (once again) and mount switches on the left hand side with their associated circuit breakers above them. Only one problem. Height of switch plus circuit breaker is greater than panel height. So what do you do? Obvious innit – get out your tin snips and cut off the upper bar of the front of the tray in which the panel is mounted to provide the extra height you need.

Ah… but there’s a 90° angled length of aluminium attached to that which acts as a bracket that pop rivets holding the cabin roof panel are fixed into and if you do that you therefore lose a section of roof fixing. No problem! Only take out half of the tray top bar (on the side where the switches are) so the roof bracket is only half hanging off and when you offer up the panel front, put in two more pop rivets – one in each corner – through the panel front and the bracket. Then the panel front helps to support the cabin roof – OK, it’s not as strong and will prevent anyone else removing the panel front in the future, but hey, that’s their problem 😐

Some people should not be allowed anywhere near an aircraft with a sharp tool in their hand. I’ll be able to repair the damage as previously mentioned by making up a complete false tray front onto which the roof bracket will be secured and the panel front mounted. However, I’ll have to redesign the panel layout so the switches and circuit breakers are mounted side-by-side rather than vertically, but that shouldn’t be too difficult with the useless fuel flow indicator out of the way.

By the way – notice the loose washer that’s dropped off and fortunately been secured under a bodge up of washers used as spacers on the top left (in the above image) circuit breaker, necessary because the correct fittings had been lost. I ask you, a circuit breaker costs about 5€ – someone decided not to replace the one whose fittings had been lost and ended up risking an electrical short as a result of the loose washer, in a multi-thousand euro aeroplane. How bloody stupid is that!

It gets worse!

I earmarked today for stripping out the Savannah’s unwanted fuel flow indicator and any associated wiring together with the high level panel front that is going to have to be extensively modified. I didn’t know what I’d find but thought that I was ready for any shocks that I might come across. Little did I know!

I had to get back into 77ASY’s fuselage through the access panel behind the cabin and here are some shots that I took in there, only after I’d completed the work that I had to do, so there are no hanging wires etc to see.

The shot below shows the fuel collector tank where the fuel supplies from the two wing tanks join up, with a single supply then feeding the engine outside along the bottom of the fuselage.

ICP Savannah fuselage interior

ICP Savannah fuselage interior

ICP Savannah fuselage interior

The Savannah really is built like a ‘proper’ aeroplane and I find its structure quite impressive. I can’t say the same though, about what I found when I searched to find the cabling for the fuel flow indicator to strip out. The reason was that there wasn’t any – someone had already cut the sensor cables and just left them hanging there against the fuselage side.

OK, fine, you say, but what about the fact that the indicator unit up-top was still connected to power? Was there no chance that the bare sensor wires that had been left were still live and could therefore short out – right next to the fuel collector tank? I shudder to think 😕

So I ended up taking out all of the extraneous cable, including what I’d left in place the other day, so gradually 77ASY is being restored closer and closer to its standard state. Then it was the turn of the high level panel. I had previously found that I couldn’t get it out even after removing the three securing screws because of two small pop rivets that someone had put into its top edge.

Here’s the panel after I’d drilled them out, disconnected the switches and cabling and removed it.

null

And here’s what was left afterwards. I couldn’t believe my eyes.

null

Here are some more shots from different angles.

null

null

It appears that for some unknown reason, someone in the past had butchered its front in the most shocking way imaginable. I do not know how anyone, even the most ham-fisted buffoon, could treat a structure in such a way, but they obviously could and did.

That now leaves my with the problem of how to make good the destruction that they’ve left behind. I considered removing the complete panel tray structure and fabricating a replacement but had to reject the idea because it’s been covered in a black carpet-like material together with the rest of the cabin ceiling and ripping it all out would just be too much of a job.

No, I’ll just have to fabricate a false front as well as the panel to fit onto it. It won’t be too difficult with thin gauge aluminium and shouldn’t take too long to do. And at least I’ll know that underneath it all things will be more or less as they should be 😐

Some people!

Here’s a shot of the back of the high-level switch panel in the roof of the Savannah’s cabin – and remember that this was AFTER I’d cut out and removed all of the unnecessary wiring!

null

The connection to the red power cable that was ‘insulated’ using masking tape is shown in the foreground and yes, it is the main power supply to the switch panel for all of the circuits that the panel controlled – fuel pump, radio, strobe lights, landing light and cabin light. So quite an important lead.

Imagine if that had shorted out and the radio had been lost right in the middle of an important call to ATC. And without the fuel pump, would it have been possible to start the engine? I don’t know. But just look at the state of the wiring and how haphazardly everything has been connected – obviously done by someone who hadn’t a clue what they were doing.

And that big black lump on the left of the panel as viewed in the above image, what’s that all about? Here’s another shot of the panel but viewed from the front this time.

null

The unit doesn’t seem to do anything when the master switch is on even when the button is pressed, so initially I had no idea what its function was. It turns out that there are a couple of clues – on the gauge itself there’s the word ‘elba’ and on its body the words ‘M & G Ultralight’. If you google those words you find the following LINK.

It turns out that whoever originally fitted out the Savannah was a total nutter and/or an aspiring Airbus captain with pips on his shoulders, because the unit is a fuel flow indicator. According to the link, it also tells you how much fuel is left in the tanks and how much longer it will last at the current rate of consumption.

What? Who on earth needs such information when flying this kind of aircraft? It’s not like a car – you can’t say, ‘Oh, fuel’s getting a bit low, we’ll drop into the next airport we pass and fill up’. That’s not how things work – you should know what your aircraft’s fuel consumption is at the rpm that you’ll be flying at and plan your landings according to the endurance you have available, with at least a half to one hour’s reserve. Then you check the airfields on your planned route to see where you need to put down for fuel.

In my opinion, a fuel flow indicator gadget is just that – a gadget – and has no role to play. It’s just extra, unnecessary weight, so working or not, it’ll be coming out. I see that the current cost of this one is just over 300€ with a single sensor and almost 600€ with two. Anyone spending that kind of money on this kind of gadget would need their brain testing I reckon.

And this isn’t the only indication that the original owner was a bozo – he also fitted an electric turn indicator, yet another hefty instrument that does no more than a slip ball because it’s illegal to fly an ULM/ultralight in anything other than VFR conditions and anyone who thinks that they’re capable of doing so, even with an electric turn indicator, is in for a nasty shock. I know as I’m an IMC rated pilot.

But now I have all the information on this top panel that I need in order to proceed. The first thing that I have to do is fabricate a new panel front and I’ll probably do that with all new switches and contact breakers before removing the old one as they are all now pretty old and are not that expensive. It seems that I’m now being dragged into work way beyond just the fitting of the new screen, but I think that eventually it’ll be well worth it.

Marking time – well, almost

Not much visible progress on the Savannah today but my time on it was actually very well spent. I need to get ready to replace the cabin top panel. The wiring to the switch panel in the cabin roof is only readily accessible when the roof panel is removed and as this isn’t something that you want to do unless it’s absolutely essential, now’s the time for me to deal with any wiring changes and problems.

And I’ve already noticed a few of the latter. There was a disconnected blue wire with masking tape around its bare end and a join to what I suspected is the main positive feed to the switch panel also ‘insulated’ with masking tape. And that’s before even thinking about what changes I’ll need to make to fit a set of working strobes.

Insulating any electrical connection with masking tape is a big NO-NO! The main reason is that it’s just not durable enough – basically it’s just made out of paper and when it chafes, which it can do very easily on any kind of moving vehicle, it rubs away to expose the wire beneath. Then if you’re lucky you pop a fuse or a contact breaker, if you’re not you get an electrical fire, so you only ever use masking tape for what it’s intended for and NEVER to insulate electrical connections.

I started by seeing what was going on with the existing strobe system. I soon found out that the cables from each wing strobe dropped down into the back of the cabin, together with the blue wire that had been cut. The Savannah has an access panel in the bottom of the fuselage behind the cabin and when I removed that, I found out what was going on.

There evidently used to be a heavy, old-technology strobe box mounted down there because the wires from each tip strobe were just dangling in the space and the blue wire had obviously once been its power supply. So that solved that one. As the strobes that I intend to fit each just require three cables (power, earth and a synchronising connection cable between the two units) which the existing strobes already have, all I had to do today was remove the cabling that will no longer be required which thankfully included the blue wire ‘up top’ with its end bound in masking tape.

Then I turned my attention to the wiring into and out of the switch panel. Quite frankly, it’s appalling and whoever was responsible for it should be ashamed of themselves. Sure enough, the masking tape bound joint does become live when the master is switched on, so I’ll have to deal with that. Also, the panel itself is scrappy and its wiring a confused cat’s cradle, so that’ll all need to be sorted out as well as the connections ready for the new strobes when I eventually fit them.

I’ll be much happier when I know that the cabling is up to standard and luckily it’s something that I’m pretty good at and enjoy doing. I’ll also have to make up a new switch panel front as seeing how badly the current one has been thrown together and how difficult it is to remove to get access to the switches mounted on it, I’d never be able to sleep if I left it as it is 😉

It’s in!

Or should it be ‘on’? I don’t care. All I know is that the Savannah’s screen is now in place, fitted exactly how it should be, and I’m mightily relieved about that.

And despite all my misgivings about having to single-handedly hold the screen under tension in-situ and line up all the holes for the pop rivets that are needed to secure it, everything went remarkably smoothly for a change. But the first job was to remove all of the old adhesive left on the panel top after I’d removed the old covering. I used white spirit and scraped it off with a wide-bladed wood chisel and it came up much better than the last time, actually.

null

null

null

Then it was time to move on to the really tricky bit, namely pop-riveting the new screen in place. It’s tricky because you have to use all of the old holes in the screen frame tube and as if it’s not bad enough just getting the holes in the screen to align with them, you also have to align the holes in the capping strips as well, while working ‘blind’.

Whoever mounted the last screen had tacked it into position first with four pop rivets, two on each side, one low and one high. However, they’d obviously done it before the wings were fitted because although it was an easy matter to insert pop rivets into the lower holes, it was impossible to do the same with the upper ones as they are behind the edges of the wings.

And if the screen isn’t held firmly enough in position, it moves before you know it making it very difficult to get all the holes aligned that you need to. So I devised a method of my own that did away with the need for the upper pop rivet tack on both sides, and this was to firstly ensure that all the holes were clear enough for rivets to slip into them smoothly when aligned, then to semi-pop one into the very top of the screen frame through both the capping strip and the screen (inside the wing root space actually) so the capping strip could still rotate but the screen was held firm, and then to tightly pop in the lower tack.

This ensured that the screen was held firm and aligned with all of the rivet holes in the screen frame and the capping strip was aligned through one hole, making it easy then to rotate it so all of the holes could be lined up and riveted. I did the passenger side first because there are cables running down the screen frame on that side that need to be covered by the inner capping strip and it was easier to deal with those without also having to hold the screen under tension.

Then I moved on to the other side using the same method. It was a bit more difficult because of the need to place and hold the screen under tension as well as align all the holes, but it worked and after a bit of heaving and struggling, the panel was at last secured in position. Here are some shots taken at that point with the inner capping strips not yet in place.

null

null

null

The screen doesn’t fit perfectly because there’s nothing attaching its lower edge to the top of the panel – the fit relies on the tension exerted by the mounting pop rivets pulling it rearwards and downwards. This can, and does, leave a bit of a gap between the screen and the airframe, although nothing like as large as is shown in the above pic that was taken before the final mounting rivets were in place. Even so, I now understand why there was a bead of silicone sealant along the outside of the bottom edge of the screen, to fill and seal the gap that ultimately remains.

It was then just a matter of slipping the inner capping strips into place and riveting them to the inside of the door frame. This involved aligning them with holes in the rears of the main capping strips that were fitted when the screen was secured. However, this was more time-consuming than difficult because of the need to do do a nice, neat job on parts which are highly visible inside the cabin. Here are the shots of the finished job.

null

null

null

Compared to the last time the screen was fitted, I’ve taken much more care with the rivet fixings that secure the screen to the two vertical tubes by placing fairly thick rubber washers between the plastic and the metal. These have a dual role because there is quite a gap between the plastic and the tubes and without the washers, the screen is domed inwards by an excessive amount. These washers almost totally prevent that happening, as the next shot shows.

null

So at last the Savannah has its screen back making it look more like a proper aircraft again. The work isn’t finished, though, because the cabin top panel, that has been in my lounge for weeks and weeks, still has to go on.

null

null

Before fitting the top panel, I’ll have to sort out the wiring for the strobes. I intend to fit a working set but doubt that I’ll do it until the new year. However, that needn’t stop me connecting up the switch and running the necessary cables through the wings, which I’ll hopefully be able to do tomorrow before at last finishing the work off and giving 77ASY a good clean inside and out. It needs it, very badly 😉

Off and on

Off came the Savannah’s new panel top covering, so hopefully next time it’ll be ‘third time lucky’. Today I trimmed down the one that I stuck on the other day but as I still couldn’t get the new screen to sit properly, it had to come off.

Sticking the next new one in when the screen is in place will be much less of a problem than doing a proper job on the screen install without damaging it while the panel top covering is in place. The trouble now is that I’ve got to get all the adhesive off that I carefully applied to the top of the panel, and if it wasn’t for that I could have had the new screen in by now 😕

So I had to leave that job for the present as I didn’t take a chisel with me to Malbec to remove the old glue but as I’d taken the Weedhopper’s new battery with me, I was able to switch jobs, remove its old flat battery and fit the new one. It didn’t take long and afterwards I soon had 28AAD out on the piste, still without its wings of course, and ready to fire up.

It started up after a few swings of the prop and as the engine warmed up, I was pleased to see that all of the gauges were working as they should. Having buckled myself in, I was then ready to do some taxy checks. First I headed down the runway and was happy to find that the brakes, which I’ve not done any work on yet, were working OK and easily pulling the aircraft up at low engine revs. After arriving at the bottom of the runway I then applied a bit of power to turn round so my nose was pointing up the slope.

The temperatures were all good so I slowly increased the throttle up to take off power. The aircraft shot off up the runway like a scalded cat, but before closing the throttle again, I was delighted to see that the engine achived just over 6000 rpm with a bit more still to come. So on this initial evidence, it looks as though the cut-down prop will be fine.

I repeated the process once more with the same results so it looks as though MYRO’s trusty old 503 engine, which only has 65 hours on it after being completely overhauled including a new crank, has come through its period of storage in good shape. So as far as the Weed is concerned, it’s now just a matter of attaching the wings and trying it out as it’s all good to go.

I wish I could say the same about the Savannah… 🙁

Sigh….

I’m not making very fast progress on the Savannah, mainly because of the weather. Every day is a re-run of the one before – dull, so dull that I can hardly see what I’m doing in the Savannah’s barn, cold and damp. In fact I’m really getting a bit worried that with its screen out, the Savannah is now beginning to feel damp inside its cabin.

Nevertheless I decided that I’d place the new screen into position to see how it looked. It was tricky getting it into the 2CV but I managed to in the end by putting it in through a rear door and then rotating it upwards. When I placed it into position on 77ASY I was disappointed to find that it was miles out – not the shape of the screen, which must be right as I used the old one as a pattern, but because of the new panel top covering that I applied the other day.

It’s too big all round, both to the front and the sides and it’s preventing the screen from sitting down into its proper position. So it looks like my original idea of fitting it after the screen is in place was right. All I can try doing now is take the old pieces of covering that I’ve still retained, place them on top of the new covering and mark the latter before trimming it back in-situ with a sharp knife. If that doesn’t work then I’ll have to take it out and start over again after removing all of the new adhesive that I applied to the top of the panel.

It looks as though we can expect tomorrow to be even cooler than today with cloud and rain all day, so whether I’ll be able to do anything in the morning before dropping over to visit Victor in the afternoon I doubt. Things could begin to improve a little after that with some sunshine and even a high of 15-20 degrees on Monday, so I’ll just have to be patient and see how things turn out. But it’s becoming very annoying 😐

I had to order a new battery for 28AAD, my French Weedhopper. I placed the order on Tuesday evening and it arrived by 10.00 am this morning by delivery company GLS. Proper service from Batterie Megastore!

Grabbed the opportunity

I decided after all that it would be better to fit the Savannah’s new panel top covering before trying to fit the screen. My plan for today, therefore, was just to produce a ‘final’ version of the covering ready for fitting tomorrow, which is forecast to be a little bit warmer than today. So using the pattern that I made yesterday, I cut out a new piece of covering and took it over to Malbec.

It fitted beautifully and although it had been cloudy with a chilly dampness in the air earlier on, by then the day was brighter and had warmed up a bit. So I decided that I might just as well zip down to Brico Jem in Rouffignac, buy a small can of contact adhesive and stick it on straight away.

It was a bit tricky getting it into exactly the original position because it tried to grip as soon as it touched anywhere on the panel top but in the end it didn’t go on too badly, as the following pics show.

null

null

null

I’ll probably have to trim the edge a little in one or two spots when I fit the screen but that should be easy enough with a sharp knife. But at least I can at last go ahead and replace 77ASY’s damaged screen, which hopefully will be tomorrow 🙂

Back on the job

The most important one that is, namely the repair of the Savannah’s screen. It was way back in August that the damage was caused by a fuel spillage and weeks ago that I removed the damaged screen and prepared the aircraft for a replacement to be fitted.

However, the repair was then delayed when material that I’d ordered from the UK to cover its panel top with got as far as Brive but then sat in the depot there for more than two weeks because the delivery company, the thoroughly useless DPD-Chronopost, decided that they couldn’t be bothered to deliver it.

So I then had to turn my attention back to reassembling 28AAD, my French Weedhopper, to avoid having it standing outside for another winter and that forced me to put the Savannah work onto the back-burner, much as I hated the idea.

But now the time has come to complete the work because the Savannah has been unflyable all this time and its cabin open to the air with just a sheet over where its windscreen should be, and the last thing I want is for that to start deteriorating when the weather turns more nasty. And not only that, but we are expecting what may be the last couple of warmish days this week, so it should be an ideal time to complete the work.

I bought two alternative fabrics – one a foam-backed leatherette material and the other a black felt-type fabric of the type often found in car boots. I’ve decided to go for the former because I’ll be able to Velcro my navigation tablet to it without the risk of it falling off, so today’s job was to prepare the panel top for the glue that I’ll use to attach it and to make a ‘first cut’ of the material as a pattern. The supplier sent more than enough material for several attempts so I’ll hopefully be able to get it right and make a nice job.

Here are some shots of the first try.

null

null

null

null

The pics look better than the real thing and tomorrow I’ll cut another piece and hope that it’ll sit nicely on the panel top and snugly around the two tubes that rise up from the front to the top of the screen. Then I’ll go ahead and fit the screen as it’ll be easier to do that without the new panel top covering in place, and then stick the panel top material into position.

With a bit of luck, I should be able to get the whole job finished in a couple of days which will make 77ASY flyable again, but I’ve decided that I’ll also need to order a new length of metal edge trim to finish it off properly as the one that’s on there currently is a bit messy and has been cut a tad too short. That can be fitted ‘at my leisure’ and shouldn’t take too long to be delivered in any case. Just so long as the supplier I choose doesn’t use DPD-Chronopost 😐

2CV drivers beware!

null

One of the hazards of driving a 2CV in rural France. Last night I was returning home after enjoying dinner with Victor who is still in hospital but insists on escaping on his crutches whenever he can for a bit of fun. It was dark, rainy and a bit misty and all of a sudden a large wild boar sauntered out of the woods on the right straight in front of the car!

I slammed on the brakes, if you can call it that in a 2CV because its brakes are decidedly ‘France ancienne’ agricultural, and that’s being polite. I was amazed that all four wheels did actually lock up, although it was probably only because the road was wet and covered with leaves.

Just before our worlds collided, the boar must have heard the sound of the slipping tyres or revving engine and luckily for us both, did a skip and a hop across the road and disappeared into the trees on the other side. Fortunately he was a big old lone male because although the sows are just as big, they very often have a stream of piglets in tow. I hate to think what damage would have been done to the front of the 2CV if we had come together.

We’re used to deer jumping out in front of us, usually in pairs, and they can do plenty of damage, but those big old boars are built like a battle tank 😐

Quintessentially French

null

In this part of the world, the minor rural roads are so narrow that when two vehicles travelling in opposite directions have to pass each other, we are quite used to putting two wheels onto the often quite bumpy adjoining grass verge as we do so. Unfortunately, a couple of days ago I stupidly managed to drive off the edge of the road unintentionally during which I managed to hit something rather hard and put my front suspension out.

The Kia is therefore now languishing in the garage until Monday as today is a ‘jour férié’ (public holiday) and without it I’d have been totally stuck. My pal Victor, who’s still in hospital following his accident back in the summer, came to the rescue and when I left it there I picked up his beautifully restored Citroën 2CV which I’ll be using while mine is being sorted. Luckily I established beforehand that it’s not mandatory to wear a beret or have a pencil moustache while driving it, although both do help immensely of course.

Because I have neither, the little tinker wouldn’t let me start it this morning and it took me quite a while, while all the time receiving all sorts of contradictory advice about pulling out and pushing in the choke by phone from Victor’s hospital bed (figuratively speaking). It turned out that the trick is to release the starter key at just the right moment, not to hang onto it and keep spinning the engine, and if you do that it then coughs into life as though it’s just finished enjoying its first Gauloise and black coffee of the day in the quintessential French way. Luckily though, it can’t spit.

I then just managed to get to the Carrefour Contact in Rouffignac before they closed as much of the journey is uphill and whizzing along at top speed is purely relative at 80 kmh. But in any case, due to the Duckling’s suspension, the wisdom of old age tells you that at any higher speed, you’d be putting your life on the line, especially if there are any bends of any significance along the route.

Mind you, it’s great fun so long as you don’t want or need to get anywhere quickly, although Victor tells me that he drove it all the way to Southern Spain and back. He isn’t as considerate or understanding towards it as I am though, and said that he had to stop every now and again to allow the exhaust, that at times was glowing red hot, to cool down. On the other hand, he has been known to be somewhat prone to exaggeration 😉

I came home on the top road around the back of Plazac and with the Autumn colours, the sun on the Limousin cows chewing the cud in the adjoining fields, the old local stone houses with their characteristic bi-sloping roofs and the Deuche’s little air-cooled engine chugging away up front, I could almost have been driving along in the ‘France ancienne’ of 50 years ago that we all remember so fondly and is the reason why so many of we oldies are all living here now. Absolutely lovely.

null

null

null

When I drove out of the Carrefour car park, an elderly chap was puffing and blowing riding his bike up the sloping entrance to do a spot of shopping before the store closed for the day. Now he did have a beret and pencil moustache and you could tell he was the real thing because he had a wooden chateau bottled wine box with one side removed strapped to his handlebars as a kind of luggage pannier. Such panache, and we smiled at each other as we passed. If I stay long enough in France, I hope that I acquire effortless style like that 🙂

It didn’t happen

Today was earmarked as the big day – 28AAD’s first flight from the cow field just down the road from my house to Galinat, to check its landing characteristics and then onwards to Malbec.

I’d phoned the landowner and he had kindly agreed to allow me to take off from his field once again and Wim had also kindly agreed to give up his day to give me a hand. I’d emailed my insurance broker last night to ensure that the flight would be covered and there were just a few small things to do first thing this morning before moving the show down the road.

Before Wim’s arrival I’d made up another 5 litres of fuel from the mogas that I still had in my ‘cave’, giving a total of just under 25 litres, way more than enough for the planned flight, made up a little bracket to mount the pitot on, recovered the ‘missing’ length of plastic tubing for the airspeed connection from MYRO’s old left wing and also recovered MYRO’s old wing tensioning straps that are the ‘proper’ ones and much better than what were originally fitted on 28AAD.

So when Wim arrived, all we had to do was solve the wing retaining pin problem (done by following the manual and removing the wing battens), remove the wings and check-start the engine before transferring to the cow field. And that’s when it all went pear-shaped.

After having owned MYRO for about 8 years, having kept its starter key safely for over 4½ years and having used it extensively over the past few days, I couldn’t find the key for the engine anywhere. I’ve been keeping it with the keys to my other ULMs on the window sill but it was nowhere to be found. I searched high and low, but because I’ve always put it back in the same place, I actually didn’t have any real idea where to look.

So after a delay during which Wim even dashed home and brought back the Red Baron’s key to try (no, it didn’t…), we decided that all we could do was move 28AAD over to Malbec by trailer. So that’s what we did, in two trips, after stripping the sides, front and back off my trailer as I’d done when I first brought 28AAD down to Plazac.

It was such an anticlimax. We agreed that I’d have to go ahead and order a replacement key (luckily one of MYRO’s previous owners had made a note of its number in its old Owner’s Manual) and that we’d have to find a suitable day in the next week or so to reassemble 28AAD so it would be ready to fly when the key arrived.

After the second trip to Malbec, there was no need for Wim to return to my place so I went off home to tidy everything up. It took a while because I had to reassemble the trailer as well as take all the bits and pieces out of my car that I wouldn’t be needing again and put the tools, covers, stepladders and goodness knows what back from where they had come. It was while I was emptying my car out that I took out the torches to replace them in the drawer in which they are kept – and there, stuck to my spare car remote was the starter key.

Too late to do anything by that time, but I was still glad to see it because ordering a replacement by number alone could have created its own problems. How did it get there? I don’t really know – it certainly wasn’t supposed to be in that drawer. I can only summise that I’d used my spare car remote two days ago to unlock my car and then left it in my back pocket for the rest of the day.

I’d then dropped 28AAD’s starter key into the same pocket when I’d been clearing up at the end of the day two days ago and somehow it had become jammed in the fob tag or the keyring so when I’d dropped the remote back in its drawer, it had gone in too. And when I felt that the pocket was empty, I’d just assumed that I’d already replaced the starter key back on the window sill with the others, dammit!

Still, as Wim said when I phoned him up to tell him, ‘All’s well that ends well’. How true in this case – but how ruddy inconvenient 😐

Another good day

In every way, actually. It was another beautiful high-pressure day for working outside on 28AAD, my French Weedhopper, with a high of around 21 degrees Celsius and no wind to speak of, and I also got a good bit done.

The first thing that I tackled was the non-working rev counter, which was easy to solve. An elderly male spade connector hadn’t mated properly with a new female one (shades of real life there…) and the wires had become unplugged. A few moments making the connection gave a fully functional rev counter, so then it was on to the next task, namely the CHT gauge.

Only one half of the dual gauge was working yesterday and I was pleased to find that when I switched the connections over, the fault moved across to the other side. This indicated to me that the connections were OK but that one sensor had failed.

Luckily Victor had generously passed over to me a couple of almost new sensors that were surplus to requirements on his Rans S12 because, like my X-Air, it has a water cooled engine. As they were in much better condition than the old ex-MYRO sensors that were on what is now 28AAD’s engine I was going to switch them anyway, and when I did sure enough I had a fully functional CHT gauge.

So, two out of two so far – could my luck hold with the non-functioning EGT gauge or had the sensors been damaged during MYRO’s recovery (the gauge is brand new)? One side of the gauge had seemed to function intermittently so I tried jiggling the connections a bit. One connector, that I’d recently repaired, snapped so that was probably the source of the ‘intermittent’ problem.

So I thought that I’d check the other pair, and found that when I connected either sensor on the ‘working’ side of the gauge, I got a reading. So both sensors seemed to be working and then it looked as though all I had to do was leave the working sensor connected and repair the connection that had snapped on the other side of the gauge. And sure enough, when I did that the dual gauge worked exactly as it should.

So that was three out of three and as the afternoon was drawing to a close (curses on this playing around with the clocks – we need the lighter afternoons and evenings, not the mornings) it was time to call it a day with another good result under my belt.

The weather is forecast to start getting a bit cooler after today with rain forecast for Saturday but I hope that if I can sort out 28AAD’s brakes tomorrow and get to the bottom of the wing pin problem I’ll have flown it over to Malbec and have it under cover by then. I hope so anyway.

Result!

The plan for today was to re-mount 28AAD’s wings with Wim’s help, attach all the other bits and bobs, like ailerons and wing jury struts and then weigh it. Then I could go ahead and add some fuel to the tanks and eventually go for an engine start.

I’d uncovered the fuselage and wings and given them a wipe down because of the amount of condensation that covered them and got everything in position ready to go before Wim’s arrival. Then after a quick cup of coffee we got cracking.

Attaching a Weedhopper’s wings and inserting the retaining pins is never easy and it was especially difficult this time for some reason. The front pins remained stubbornly half-a-pin out for both wings so we decided to just carry on and investigate the problem more closely when the wings are removed again. Apart from that and having to realign the top brackets for the wing jury struts that had become slightly distorted when 28AAD’s undercarriage had collapsed and the wings had rotated slightly (probably also why we had difficulty with the wing front pins), everything went pretty smoothly and after Wim had left and I’d had a spot of lunch, it was time to go for some fuel.

Here are some shots of 28AAD with its wings back on for the first time – well, half-on anyway.

Weedhopper 28AAD

Weedhopper 28AAD

Weedhopper 28AAD

Weedhopper 28AAD

Weedhopper 28AAD

Weedhopper 28AAD

Weedhopper 28AAD

Weedhopper 28AAD

I couldn’t then just add fuel to the tanks and go for an engine start – there was bit to do first. First off, I had to check that my new hand primer bulb worked – it did, incredibly effectively! Then I had to bite the bullet and crawl into the cabin from the passenger side on my back so I could remove the fuel tubing from the fuel pressure gauge, bleed the line, reattach it and securely tighten up the retaining clip screw. It took a while but is essential and was very effective – the gauge showed good pressure when the primer bulb was pumped and retained it for quite a few seconds.

Then I removed the carburettor bowls and checked them for cleanliness – clean as a whistle and no deposits despite standing for 4 years. Then it was time to clean and check the plugs.

As I’d put oil into the engine’s cylinders, they had quite a lot on them so I took them out, cleaned them in acetone and gave them a light brushing with a wire brush. I didn’t think that it was worth gapping or doing any more to them because they had only flown a few hours down to the Dordogne from the UK – admittedly it was over 4 years ago though.

Then I connected up MYRO’s old battery. Now bear in mind that that battery was several months old when I left the UK for France and has spent the last 4 years on a trickle charger, so I really had no right to expect that it would hardly even turn the engine over, let alone give it a healthy spin. It did with the plugs out to clear the last of any loose oil and then after refitting the plugs it was time for the big test.

I gave the primer bulb a few pumps and the fuel pressure immediately shot up. Then I applied full choke, made sure the throttle was fully closed and turned the starter key. Incredible – the engine immediately burst into life! I was delighted after all this time and all that it had been through. With the choke closed it had a nice steady tick-over and at more elevated revs the mag drops on both sides seemed pretty equal. I couldn’t tell for sure because MYRO’s old rev counter wasn’t working, so I’ll have to investigate why not.

And as expected, only one side of the dual CHT gauge showed a reading, but whereas I’d originally thought that both EGT sensors weren’t working, in fact one did show a reading intermittently. So there’s probably some kind of connection problem that I’ll have to look into later.

But I regard that as a result, bearing in mind that the engine hasn’t been run since MYRO’s accident, has been stored for over 4 years and I had to fit a new stator and re-time the engine after foolishly trying the starter with the heavy earth lead not attached. I don’t think that it’ll take too much to sort out the wing retaining pins but first-off tomorrow I’d like to try and sort out the non-functioning gauges.

And not only that, I found that the hand-operated brakes didn’t hold when I tried to apply full power, so tomorrow I’ll also see what I can do about those. But tonight is for enjoying today’s successes and maybe, just maybe, I’ll treat my self to a nip or two of Armagnac a little later on. Although, what the heck, what’s the point in waiting 😉

Cleared for take off

Well, yes, after the wings have been mounted and fuel put in the tanks! But first 28AAD, my French Weedhopper, must be weighed, have its paperwork done to send off to the DGAC to get its Carte Jaune back, have its engine started and run and have some taxi checks and a few hops before getting airborne for real.

But it is now in what should be a fully flyable state. Here’s a shot of its wings with the wing battens all now in place. Adding cord loops to the batten ends was a horribly fiddly job this morning but now they’re all back on as they should be.

null

Next job was to make up its bungie door straps. I made the internal hook fixings yesterday so today all I had to do was drill the doors and attach the straps. The ‘official’ arrangement is to hold the doors closed by just hooking their straps together but I don’t like that because if you’re flying solo and want to close the doors, you have to make sure the passenger door is pulled-to first. Then when you’re strapped in your seat and just about to grab its strap to close both doors, the darn wind blows taking the passenger door with it, so you have to get out and do it all over again.

I get around that by attaching two cable-tie loops to the horizontal bar behind your head, one for each door, so if you’re flying alone, you don’t need to open the passenger door at all. You can see my arrangement below.

null

null

I then had to make a decision about the altimeter. I would have preferred to fit a 10000 ft model but I already had one that reads to 5000 ft, so the extra cost couldn’t really be justified, especially as an aircraft like the Weedhopper rarely exceeds such a height. Here’s a shot of the panel with it in place. Now all I need is to come across, or buy a variometer.

null

So that’s it. When the wings are mounted, I’ll need to find a way of attaching the pitot tube to the left wing strut. There was a little bracket on MYRO’s old wing and I’ll have to look and see if I can find it. If not, it’ll be easy enough to make something up. So here’s what should be the final shot of 28AAD before everything goes together.

null

I can’t wait and I’m hoping that it will be sooner rather than later 😉

Ready for the final tasks

Another lovely day today but I didn’t do very much except move 28AAD onto my front grass ready for the mounting of its wings and weighing. Here’s a shot of its fuselage standing in the sun just after I’d moved it from the back of my house to the front.

null

I then moved all of its other bits and pieces out too in readiness.

null

Everything is now all covered up and that’s how it’ll stay until I can have a hand to help mount the wings, which won’t be until the early part of next week. So in the meantime I really must get back onto the Savannah windscreen repair 🙂

Have wings – will fly

At least I hope so. But before I could start on its wings I had to uncover 28AAD and dry it down. It was another lovely day today but we’ve had a couple of wet days and nights and I could see when I peeped under the Weedhopper’s cover that it had had a good soaking despite being covered up.

When I took the cover off, the aircraft looked as wet as if it had been standing out with no cover over it at all, so it appears that the tarp that I’ve been using has just about come to the end of its life. As well as being wet on the outside, the Weedhopper’s new screen and door plastics were also wet with condensation on the inside and it took me several minutes to go over the whole aircraft inside and out with a sponge and washleather.

Then it was time to get all of the remaining Weedhopper items out of my ‘cave’ and laid out on the grass ready for me to start work assembling its wings. Sufficient wing battens had been marked up to make identification easy and here are some shots of everything set out ready to start on the first wing.

null

null

null

Although I’ve twice assembled the X-Air’s wings, which go together the same as those of the Weedhopper, this was the first time that I’d tackled the actual Weedhopper ones, so it took quite a while working out how to do the job properly and without doing any damage, to the wing covering especially. But I finally cracked it and here are some shots of the right wing.

null

null

I’ve had to leave the batten ends protruding for the time being as all of the end cords that you need to extract the battens have been removed and I’ll need to get hold of some suitable cord to replace them in the next day or so. Then it was time to tackle the left wing and once again I proved the effectiveness of the ‘learning curve’ theory, because whereas the first wing had taken a good couple of hours to do, I finished the second in about 30 minutes.

So for the very first time since I’ve owned it, the Weedhopper’s identity was on display once again.

null

Here are some more shots of the finished wing. The cover didn’t pull up as tightly as the first one’s did but that won’t be a problem when the tensioning straps are applied when the wings are eventually mounted on the aircraft

null

null

null

So that was it. It had been a long day and there was nothing left other than to try to stow everything as securely as possible outside now, as I have no cover large enough to take the aircraft and its wings. So I did the same as when I’d assembled the X-Air’s wings and laid them together on the grass with a cover over them.

null

null

And the other bits and pieces, the struts and ailerons, I just laid on the ground under the aircraft, where there’ll have to stay until it can finally be assembled for weighing followed by taxi and flight testing, probably at the week-end or shortly after. Fortunately it appears that we can expect a period of pleasant dry weather in the meantime.

null

So that’s it for now. I was rather disappointed by how many dings and patches the wings had suffered under the stewardship of its previous owner(s) but there’s nothing much I can do about that, and they won’t look too bad when they’re mounted on the aircraft. While moving stuff from my ‘cave’, I came across enough bungie cord for the Weedhopper’s doors, so I’ll make the new straps up shortly.

What is more problematic is that the top panel that goes between the wings has openings in it for the parachute that was previously on the aircraft and the exhaust support that was needed for the original 582 engine. I’ll have to think how best to fill them as although MYRO’s old cover was red, it wasn’t in very good condition. It might do while I fix the proper one, which I’ll probably do with velcroed on patches.

But that’s for a bit later as tomorrow is time to get back onto the Savannah’s windscreen repair. And not a moment too soon either!

Ready to rock and roll

The repair work on 28AAD, my French Weedhopper, is now complete. Apart from the usual checks on the engine, gearbox and carburettors, the work on the main fuselage has now all been done.

I still have a couple of holes in the panel – I have a 5000 ft altimeter which I’ll have to fit temporarily as I’d prefer to have a 10000 ft one, and I also don’t have a variometer (rate of climb/descent gauge), but the latter won’t prevent the aircraft being safely flown as it’s a secondary rather than a primary indicator.

Here are some shots of a finished door.

Weedhopper 28AAD

Here’s a detail of its hinge – I think it’s much better for having pop rivets rather than nuts and bolts.

null

Unlike MYRO, whose pod fitted snugly up against the cabin door tube, this one has spacers each side. The pod must be wider but it’s useful because it means that the door is well tucked in safely away from the external airflow reducing the chance that a door will be blown off in flight.

null

Here’s a shot of the cabin top. I couldn’t get hold of any suitable draught sealing strip so I made some up myself to go along the bottom edge against which the tops of the doors have to seal by cutting up a length of pipe insulation and sticking it on with contact adhesive. It doesn’t look too bad and seems to work well.

null

Now the prop. I’m delighted with its appearance – it could almost be a new one 😉

Weedhopper 28AAD

Weedhopper 28AAD

Weedhopper 28AAD

Now a general shot of the whole side of the aircraft.

Weedhopper 28AAD

A couple of shots from each side of the outside of the cabin.

Weedhopper 28AAD

Weedhopper 28AAD

A general shot of the cabin interior.

null

And finally, the engine cover in place.

null

null

This is the first time I’ve put it on with the prop in place and indeed, it’s the first time that I’ve used it with a two-bladed prop as MYRO had three-bladed ones the whole time that I had it. I can only describe the fit as ‘snug’ but it goes on nicely.

I have to get hold of a length of bungie cord to hold the doors closed but tomorrow I can start on assembling the wings ready for them to be fitted. In all likelihood I won’t, in fact, as rain is forecast but let’s just wait and see.

That’s better

Things went today as they were supposed to, so compared to yesterday, I actually got quite a lot done. Today’s main task was to get the Weedhopper’s doors at least assembled and preferably, fitted, so I got cracking with that goal in mind.

I couldn’t start that early because the mornings are now becoming quite chilly and the area where I work is outside my back door, which doesn’t get the sun until after midday. But that gave me enough time to clear out and reset my wood-burner before getting everything organised so the day would run as smoothly as possible.

Within less than two hours I had the first door assembled and the only tricky bit was adjusting the drillings for the larger diameter new front tubes and the lengths of the cross-pieces to accommodate them.

null

The second door took half the time and here are the pair ready for the next stage, namely mounting them.

null

I found that with minor adjustments I could use MYRO’s old hinge plates that I made myself except this time I decided that I’d dispense with fancy nuts and bolts, which you never need to undo anyway, and use pop rivets instead. This meant that there would be very little adjustment in the hang of the doors so I had to take great care in positioning them just right. Here’s the first one that I did.

Weedhopper 28AAD

Weedhopper 28AAD

And the doors open fully just as they are supposed to but this time, because I’d used pop rivets, there were no ugly bolt heads sticking up that I had to drill holes in the doors for so they could open fully without hitting the bolt heads.

Weedhopper 28AAD

And here are two final shots showing the cabin from each side.

Weedhopper 28AAD

Weedhopper 28AAD

So today was much more successful than yesterday. Although the doors are both on, I’ve still got to finish securing the rear of the pod and the back of the screen to the cabin tube. It will go back easily on the left hand side but the other looks a bit more challenging, mainly because of the dent in the pod on that side that is forcing it out of shape. But I’m sure I’ll find a way round the problem somehow.

So to all intents and purposes, the repair and renovation of 28AAD, my French Weedhopper, is complete. Tomorrow I’ll finish all the little items that are still outstanding and then it’ll be time to think about assembling the wings. And then my mind will be able to turn to taxi and flight testing.

I just hope that the weather continues to hold – we’re expecting temperatures in the 20’s next week – because as well as finishing off the Weedhopper, I’d like to get the Savannah’s screen done too. I just hope that that’s not too much to hope for 😉

Mama said there’d be days like this

I succeeded in finishing the Weedhopper’s prop last night and I’m delighted with the way that it eventually turned out. I managed to rectify all of the ‘bubbling paint’ problems and if anything, it’s better than I’d originally hoped it would be. So I couldn’t wait to get stuck into fabricating the new doors ASAP today.

I’ve got a painful little cut on the little finger of my right hand so thought that I’d stick a plaster on it before having my final mug of tea and getting started, so having put the plaster on, I picked up the mug – and dropped it. Tea went flying everywhere – all over the front of the microwave and worktop, down the fronts of the fridge and kitchen unit and also down the side of the latter in the gap between it and the fridge.

So nothing else for it but to start mopping all the mess up, which involved moving the microwave, coffee maker and everything else off the kitchen worktop, opening cupboard doors and drawers to mop up tea that had managed to enter inside them and pulling both the fridge and freezer out to clean around and under them. I have to say, what a great start to the day – NOT!

So all my thoughts of starting on the Weedhopper’s doors were banished for a good hour while I put Operation Big Clean-up into action. But eventually it was all finished and by this time it had gone mid-day, so time for a quick snack lunch before getting cracking on the more important stuff. Something quick and easy, hmmm. I know, a pot noodle!

I opened the cupboard door to get one out and a small bottle of Chinese sauce flew out all by itself and smashed, depositing glass and its contents all over the floor… 🙁

And the day continued in very much the same vein. When I eventually got myself sorted out and was all ready to start assembling the first door, I found that my cordless drill was almost out of charge and didn’t even have enough power to drill through the door plastic. Evidently I’d forgotten to charge it after I last used it, so had to go to all the hassle of digging out my corded drill and running an extension lead to power it.

I’d drilled the plastic ready to pop rivet the top tube of the first door and had all of the rivets in place when I thought that I’d better count them to make sure that I had enough to do both doors. Naturally, I didn’t quite, so I had to abandon the job and go driving off to les Briconautes in Montignac to pick up some more 4mm diameter rivets to make sure that both doors looked the same.

I found what I wanted and had to join the end of an uncharacteristically (for les Briconautes) long queue. While I and those in front of me were waiting, two, yes two, old chaps decided to pay for their goods by cheque. The French habit, mainly by older people, of paying by cheque could make you scream as it takes easily five times as long as using a debit card. But still they insist and still we all have to wait in the queue behind them while they laboriously make their cheques out after checking the total at least two or three times and slowly adding their signature.

So by the time I got back home it was pushing 5.00 pm and the words of the old song came floating into my head. ‘You gotta know when to hold ’em, know when to fold ’em…’ and it was pretty obvious that today was a ‘folding’ kind of day. So even though there was still a bit of sunshine and warmth in the day, I packed everything away. But not before I’d taken a few shots of the Weedhopper’s finished propeller. Here’s one of the blades.

null

And here are shots of each of its faces at the tip.

null

null

So I at least had the satisfaction of knowing that it’s ready now to go on. And in the immortal words of Scarlett O’Hara, ‘After all, tomorrow is another day’.

A step backwards

Compared to the success achieved the previous day with the varnish, what should have been a relatively quick and simple job of painting the prop tips yellow turned out to be a nightmare. The problem was that the ‘universal’ undercoat that I sprayed on as a base coat reacted like paint stripper with the yellow finish that was already there and caused it to bubble up.

This is not uncommon and usually happens when you don’t know the provenance of a finish that someone else has applied, as now. After cutting the prop tips down and rubbing down the bare wood to get it totally smooth, I’d then given the whole prop a coat of clear varnish. I’d then masked off the tips and applied a final, second coat of varnish to the rest of the prop before reversing the masking and lightly rubbing down the tips and giving them a light spray of undercoat as a uniform base for the new yellow finish.

In rubbing the tips down, I’d broken through the thin coat of varnish that I’d previously applied in one or two places exposing the old yellow finish that was already there and it seems that it was in those areas that the problem occurred. When something like this happens, there’s nothing else to do other than stop, allow everything to harden off and repair the damage.

The best way to do that is to isolate the affected areas and fix them with a material that’s inert to both the old and new finishes and will act as a barrier, and luckily I had such a product in my ‘atelier’ in the form of a special water-based ‘sous-couche bois’ (wood undercoat). It also had the advantage of having thickened over time so I could apply it quite thickly locally to build the levels of the damaged areas back up again without it running all over the place.

It’s been a slow but successful process and there were just a couple of small areas that needed re-doing this morning before rubbing them down again and moving on to where I’d hoped to be yesterday. Here’s a shot showing what I’m talking about.

null

Unfortunately, these lttle set-backs always happen and you just have to be patient and work through them. In comparison, I cut and bent the new door tubes the day before yesterday with excellent results and they painted up fine yesterday despite its being a damp, dull day. So at least I can now move on and finish fabricating the Weedhooper’s new doors.

Gorgeous

I was up early this morning so I could give the Weedhopper’s propeller a second coat of varnish with the possibility of doing another in 12 hours time, later this evening. However, I’m not sure that it’ll need another coat although I’ll see what I think when the time comes.

What I do know, though, is that its finish is gorgeous, as the following two shots show.

null

null

I can’t recall ever having used varnish as good as this before, perhaps because I’ve previously not come across such a fine marine quality product. The finish is not quite as perfect as the above shots show across the whole of the prop’s surface, but it’s still pretty good and indeed, much better than what I achieved on 56NE’s prop just a couple of weeks or so ago.

Whether I give this prop a further coat of varnish or not, it does at least mean that I’ll be able to do the yellow prop tips either early or late tomorrow. I’d like to leave a full 24 hours after applying the final coat of varnish, though, as I’d hate to apply masking tape and have it leave marks on the varnished surface.

So it looks as though the prop will be OK to fit this week-end, in which case if the door aluminium arrives today and I’m able to make up and fit the new doors, the Weedhopper will be more or less finished. I’m really looking forward to seeing how it turns out – if it looks as gorgeous as its propeller I’ll be very pleased 🙂

Hooray! The aluminium tubing for the doors arrived before 11.00 am so after lunch, I was able to cut and bend the two new door front tubes and give them a coat of bare-metal primer in advance of spraying them white. If I can do that this evening, I’ll be well-placed to get both doors made up and fitted tomorrow. Getting closer all the time!

Lovely job!

Or at least, it will be. I drove across to Brico Depot at Trelissac to find something to coat or paint the Weedhopper’s prop with. I decided in the end to do a proper job by rubbing it all down as I did 56NE’s, but without stripping the old coating off this time, to get a totally uniform finish.

After searching around I came across a small area hidden away among all the ‘environmentally friendly’, water-based varnishes that quite frankly are really only good for lightly used indoor surfaces, containing a range of proper white spirit based products branded Xylophene Color. These looked promising and up on the top shelf I spotted ‘Vernis Extérieur Marin’, a very high resistance, uncoloured, high gloss marine varnish.

null

It’s described as having ‘reinforced impermeability’ and protection against UV bleaching so I thought it was worth buying and giving it a go. And after just the first coat, I’m not at all disappointed.

First I gave the whole prop a rub over with an abrasive sponge to give it a uniform unglossy surface and after making sure that I’d cleaned all of the dust off, applied the first coat of this varnish. The result is stunning! It’s given a fantastic, high gloss finish with absolutely no brush marks, so in most respects, it resembles what was the prop’s original finish. And that I’m extremely delighted with.

I’m going to give it a second coat before masking off the tips for painting, as I did with 56NE’s prop, and then I’ll probably apply two more so the prop will end up with a thick, highly protective, high gloss finish.

The only problem is that you have to leave 12 hours between coats and a further 24 hours for it to be fully cured, so the whole job is going to take two or three days. But I think that the final result will be well worth waiting for 😉

Cut-down prop

Yesterday it was a lovely day – warm and sunny – and today was forecast to be the same. But it wasn’t. The sun never really managed to break through the cloud, so although I had arranged to fly today and had topped up the X-Air yesterday in readiness, I decided to back out in the hope that there’ll be a better opportunity during the coming week.

So I busied myself doing a few little things that I’ve been putting off and later on, when it brightened up a bit and became a little bit warmer, decided that I’d make best use of my time by trimming the Weedhopper’s ‘new’ prop down. I’d previously calculated that I needed to reduce it’s diameter from 67″ to 66″ so that’s what I cracked on and did. Here’s a shot of the tips that I cut off.

null

I took care to try to match the shape and profile of the cut-down tips as closely as I could to the originals and here are a few of shots of where I got to today.

null

null

null

Here’s a full-length shot of the prop after I’d trimmed it down and also rubbed down the small areas where it’s protective coating had been damaged and the underlying wood had become marked.

null

And finally, a closer-in shot of just one of the cut-down prop’s blades

null

I carefully weighed the prop after reaching the above stage and as far as I can tell, I was pleased to find that it’s still perfectly balanced in both planes ie suspended in its centre ‘flat’ and ‘on-edge’. That means that I can now go ahead and finish smoothing it down and then re-coating it, preferably with a clear epoxy-type varnish. I’ll have to see what I can lay my hands on tomorrow.

Oh no!

Every now and again something happens that shows once more that France still hasn’t quite caught up with the age of the internet. My order from ULM Technologie arrived as expected today and when the Postie handed me the parcel I could see immediately that they’d cocked it up. Here’s product code 50133 that I ordered listed in their catalogue.

null

And here’s a snip from their invoice that I received by email.

null

So I’m expecting to see a package 4 metres long arrive today and of course, what came? A single piece of aluminium tube of length 1 metre. Very stupid. So someone at ULM Technologie applied a unit of ‘1’, quite correctly for the product, but apparently nobody thought that it might be a good idea to put ‘length 4 metres’ in the description field. So that’s my work on the Weedhopper held up now for at least another 3 days, because this being France, nobody will consider sending the order out for next day delivery as they made the cock-up.

And this is the country that says it will steal all of the City of London’s Euro business after Brexit and move it to Paris. I ask you.

Edit…

I’ve just come back to say that ULM Technologie is claiming that although its catalogue shows a tube length of 4 metres, the tube is sold in units of 1 metre even though it doesn’t say so and that you’re supposed to know that, presumably by a process of telepathy. And this is how the French concept of ‘client service’ is applied – when I ask to speak to a manager, I’m told that nobody is available until tomorrow morning at the very earliest.

So I’ve paid 28,50€ for a piddling 1 metre of 12 x 1 mm aluminium tube including delivery and I’ve just gone onto Ebay Germany (because I want to pay in Euros) and ordered two lengths each of 1.5 metres of the same dimensions from the UK for 13,00€, again including delivery. They have really lost the plot over here – and that’s the first and last order that ULM Technologie will be getting from me.

Think ‘wood’

Before I came to France, my house in the UK had gas-fired central heating, so I never had to bother about thinking how to keep it warm in the winter. But now I rely on my wood-burner (or alternatively, electricity that you pay through the nose for), at about this time of year I have to start looking forward to the coming winter.

I took the first step last week by getting a load of wood delivered, but I still need to get it cut and split ready for burning and safely stacked inside my wood store while the weather is still being kind to us. So as there was no sign of the aluminium that I need for the Weedhopper’s new doors, and I didn’t expect there to be until tomorrow, I thought that today I’d turn my attention to the garden.

First thing was to get out my ride-on mower and check its battery as it hasn’t been started up for several weeks. Not unexpectedly, it wasn’t completely flat but didn’t have enough power to start the engine, so on it went to the battery charger. While it was charging, I then turned my attention to my wood store which was in severe need of attention and in no state to take any new wood until it had been completely cleared out and cleaned up.

Spiders and other insects had had a field day during the summer months and the place was festooned with webs and dust. Everything had to come out before it was possible to make a start and while I was sweeping up all the burnable rubbish and thinking about starting a bonfire to get rid of it, the idea came to me that it would be a good time to go around the newly-terrassed area of the garden and pick up all the now dead and dry bits of root and branches that were left after Agrafeuil had finished their work and add those to the bonfire too.

So that’s what I did, together with as many of the large dead weeds that were also there, with the result that when I’d also finished cutting the grass, which is now lush and green again after having been burnt and brown for so many weeks, the day finished up being quite a productive one. Here are a couple of shots of my newly cleaned and cleared wood store, now ready to take the new stocks that I’ll have to start cutting and splitting in the near future.

null

null

So no work on the Weedhopper today but a day well spent nevertheless. Hopefully, the aluminium tube will arrive as expected tomorrow and I’ll be able to make up its new doors and bring the end of the project ever closer. I’ll have to wait and see 😉

Come fly with me

OK, not quite, but almost! The Weedhopper is very nearly finished and if its wings were now attached, in theory, and I hope in practice also, it would fly. Today I repaired the EGT gauge connectors that were damaged when MYRO was recovered, connected and cable-tied the remaining cables and connected up the fuel system.

First, here’s a shot of all of the connections in the battery and voltage regulator area showing how I’ve run the choke cable and the ‘dedoubleur’ that I made.

null

Now all of the connections at the engine end showing how I’ve used pipe insulation as a handy sleeve to protect connectors and give a tidy appearance.

null

Now a shot from the other side of the engine showing how I’ve also bundled up the excess EGT and CHT sensor cabling in a similar pipe insulation sleeve. ‘Losing’ the excess cable was always a big problem on MYRO and this seems to have solved it.

null

My big disappointment was that I tested both the EGT and CHT sensors using a blowlamp and the only life I found was from one CHT sensor. THe EGT gauge is brand new and came with a note saying that it had been tested, so I don’t know where the problem is in that system as there was no reading from either sensor. Similarly, I don’t know for now why one of the CHT sensors isn’t giving a read-out as I’m pretty sure that both were when MYRO was flying.

Now the fuel system. This is the new fuel line at the engine end. There’s a main filter where the supply tubes enter the cabin from each tank as I’ll show in a minute, but I’ve also added this secondary in-line filter to be doubly sure. It’ll also give a visual sign that fuel is reaching the engine at start-up.

null

Here’s the arrangement that I’ve put together in the cabin. I’ve not installed MYRO’s old fuel pump because it’s only used for priming the engine and once the engine has been started just becomes dead weight. Instead I’ve fitted a hand primer bulb similar to what I have in 56NE. For safety, I’ve included a by-pass with a one-way valve so a blocked or damaged primer bulb won’t result in an engine stoppage but which will allow the primer bulb to work normally the rest of the time.

null

MYRO also had two Mikuni fuel pumps as all UK AX3’s should have but I’ve done away with the lower one at cabin level as X-Airs have a similar distance to pump the fuel up from the tanks to the engine and they only have one up near the engine and the system works fine.

Here’s where the main filter is located, in the well between the seats, with both tanks feeding into it.

null

And to end, here’s a final general shot of the rear of the engine showing the work that I did in that area today on the electrical and fuel systems.

null

So that only now leaves the new doors to be fabricated and fitted when the aluminium tube that I’ve ordered arrives from ULM Technologie, probably on Wednesday. Tomorrow I’ll busy myself doing small things like sticking on new top door seals and things like that, in readiness for getting ready for final assembly and, fingers crossed, test flying in the near future.

Very nearly there

Yesterday I succeeded in getting the Savannah’s cabin top panel ready to go back on so I can now go ahead and complete the work on its windscreen whenever I want to. But today I again concentrated on 28AAD, my French Weedhopper, because I really want to get it entirely finished before the winter.

So today I re-timed the engine, connected up all the rest of the wiring and also connected the throttle and choke, the cables of both of which had been cut when MYRO was originally recovered. I’d only bought one new cable and outer, the latter of which I used to replace the lost piece off the choke cable, so luckily there was enough cable left on both for them to still be long enough to connect up. In fact I even had to shorten the choke cable a bit, although I had to trim the outer on the throttle.

But the important thing was that at the end, both of them worked smoothly as they should do and I was especially pleased to see that the ‘dedoubleur’, parts of which I’d made myself from aluminium tube and bar, worked fine and looked OK too. I’ll do some pics tomorrow probably, when I’ve re-routed a couple of things to tidy them up a bit.

Re-timing the engine was a little bit tricky. All of the ‘how-tos’ that you can find on the internet tell you that you need a dial gauge to accurately set the crankshaft to 18° before TDC, but I don’t have one and would prefer to avoid having to buy one. Victor suggested setting the crank to TDC, which is quite easy, and then rotating it by hand a given number of teeth on the starter ring calculated by counting the total on its circumference.

Unfortunately, this isn’t possible because you have to remove the starter ring to get at the ignition spark trigger units that you have to adjust, so I made up my own variation just using a sheet of paper.

First using my navigation protractor, I drew vertical and horizontal axes on it that intersected and then I drew a line at 18° before TDC that also passed through the intersection. Here’s a picture showing what I mean.

null

Then I took the sheet of paper out to the engine, which I’d already set at TDC, and put a small felt tip mark on the top edge of the flywheel and another opposite it on the crankcase. Then I placed the sheet of paper over the back of the engine such that the vertical axis that I’d drawn on it was dead over the two marks.

Then came the tricky bit. What I then had to do was adjust the paper keeping the vertical axis over the previous two points until the point where the axes intersected was exactly in the centre of the flywheel. This wasn’t as difficult as it sounds because placing the paper onto the end of the crankshaft and running your (dirty) finger around it makes a circular imprint on the paper and it doesn’t take much to get the point of intersection exactly in the centre of the circle.

Then it was a simple matter to use a small sharp screwdriver to place a mark on the rim of the crankcase where the 18° line intersected it. And that was it. All I then had to do was make that mark easily visible with another dab of felt tip and that showed exactly how far back the the mark I’d previously placed on the top of the flywheel had to be rotated.

Then all I had to do was adjust the ignition spark trigger units so they both lined up with the marks on the flywheel and adjust the gaps between them and the tiny pegs that are present on the flywheel surface (0.016-0.020″, 0.4-0.5mm). Obviously I won’t know how successful my method has been until I come to start and run the engine, but let’s just say that I’m quietly confident as the distance between TDC and 18° before TDC on the flywheel circumference is surprisingly large meaning that errors in measurement should be fairly small 😉

So what’s now left to do? Well, not a lot really. The main breakthrough will come on Tuesday, or more likely Wednesday, when the aluminium tube arrives that I ordered from ULM Technologie. That will enable me to finish off the doors. In the meantime, I’ll be able to finish off running the fuel system, part of which I managed to do today before finally calling it a day at gone 7.00 pm. And tomorrow I should also be able to do the small repairs that are needed to the EGT gauge connections and get the wiring for those and the CHT gauge in. It really is now getting very close indeed!

AngloAds

When I first came to live in France just over 4 years ago there was a brilliant English small ads section one one of the ex-pat web sites that everyone used to use. It wasn’t that flashy but was dead easy to use and it worked. I bought and sold quite a few things using it and in its own way, it was also a good way to get to know other English speakers and ex-pats in your area.

But its owners were a business and it obviously wasn’t making them any money, so they changed it. With disastrous results – for its users anyway.

The number of users of the new system seems to have dropped dramatically and lots of people have been openly complaining how much more difficult it is to use in their ads, and especially to upload photographs. Certainly, I’ve found that whereas I used to be able to put items up for sale and sometimes sell them in hours, now they don’t sell at all, and when I do try to browse the new system, the photographs in the ads take an age to download and appear on screen.

And ease of use is important, of course, because the great majority of ex-pats are older, mostly retired people who quite frankly aren’t bothered whether a system is flashy or not and just want something that’s easy to use and works for them!

So rather than sit back and feel sorry about things, I decided to do something – and came up with a new FREE small ad system called AngloAds. It hasn’t cost me a penny, just my time, and will remain free just so long as it gets visitors and people make use of it. Here’s a shot of the main screen

null

And before anyone asks, no, it’s not supported by gimmicks or on-screen advertising. It has nothing like that – the web site is free, just like the system itself.

It’s very like the old system that people used to know and love and is just as easy to use. Except it’s better. Something that the old system lacked was a map showing where the things that were being sold were located and as France is a big country, it wasn’t unusual to find that something that had caught your eye was hundreds of kilometres away, even though it was in, or supposedly close to, your region.

AngloAds has a Google map so you can see instantly if it’s worth finding out if the knick-knack that you fancy is worth going after.

But enough to be going on with. Here’s the link to the web site.

http://angloads.rf.gd

The problem with any new internet idea is publicising it. What would be great would be if anyone reading this could share this My-Trike post and especially the above link. That way the search engines will get to know about it and people searching for an English small ad system will be able to find it, which will be a win-win for everyone. Except for the owners of the new system that people don’t like, of course 😉

One of those days

You know the kind I mean… when things almost go your way but then trip you up at the last hurdle so you fall flat on your face. Well, that’s the day I had today.

I’d hoped to get the Weedhopper’s doors on today and things started very well. I had everything prepared and had cut both of the plastics out perfectly by late morning, and that was when Mr. Dumas, the wood man, turned up with my winter wood order.

I’d moved the Weedhopper so he could reverse his tractor and trailer around the back of the house because I thought the earth in the front would be a bit too soft, but he insisted on driving up the bank onto the front grass and in fact the marks he left weren’t that bad after all.

After depositing the 4 stères of mixed ‘châtaigne/chêne’ (chestnut and oak) that I’d ordered we then embarked on the usual 20-30 minutes of social chit-chat that invariably occurs in France whenever you have a delivery or a visit from a local tradesman. Mr Dumas had noticed the Weedhopper and said he’d be interested in having a look.

We spent a good 20 minutes talking about it and ULMs in general and Mr Dumas also asked about the autogiros that he’d seen buzzing around overhead. What a sea-change difference compared to the usual attitude in the UK to ULMs/microlights! Then it was time for him to go as his lunchtime was approaching and I thought that I might as well grab a bite as well.

Here’s a shot of the heap of wood that he left behind which I covered up immediately with the old tarp that I’d had on the Weedhopper. It has a few holes and worn bits in it now but it should keep the wood dry enough if/when it rains before I can get it cut, split and in my wood store.

null

So that’s another job added to my list. I made a mental note to find a way to raise my wood splitter up to a decent working height as otherwise splitting that amount of wood will really do my back in!

Then it was back to 28AAD’s doors. I’d already decided that I’d have to use MYRO’s old hinges as the ones that were on the Weedhopper were nasty and corroded. But that gave me a problem because the door tubes had been drilled for them and the holes didn’t match the ones in MYRO’s old hinges.

And not only that, the tubes were of quite small diameter and would have been severely weakened if I’d just drilled some more in them. Easy, I thought, just use MYRO’s old door front tubes because they already have the holes in the right places.

But I was too hasty – they had been bent to go on MYRO and weren’t quite the right shape to go onto the Weedhopper.

And then I demonstrated the universal truth that if you’re lucky enough to bend a small diameter aluminium tube to the shape you want before you’ve drilled holes in it, if you subsequently try to change the shape even slightly, it’ll snap at one of the holes. Which it promptly did.

So that was it – time to pack up for the day. I ended up sourcing both a new set of stainless piano hinges and some more tubing and when both arrive, I’ll fabricate the door tubes and hinges from scratch. I only made the tubes last time for MYRO but I got the hinges as well this time because the old ones are now looking very tatty having been on and off at least two or three times, on the principle that if a job’s worth doing, it’s worth doing properly.

And as the doors will be off the menu tomorrow, which should be another reasonably bright and warm day, it’ll be an ideal opportunity to get back onto the Savannah’s screen repair, and in particular, the work that’s needed on its cabin top panel. I’m hoping that things will runs a bit more smoothly than they did today 😉