Glamping? Hardly…

Because of the work I’m doing on my bedroom windows, both rooms are out of action with the beds leaning against the walls on their sides to give me space to work. So two nights ago I put up a camp bed and slept in my living room, and not too badly I might add, especially compared to the night before when I only got about 5 or 6 hours of sleep.

Yesterday morning I had a very successful meeting in Périgueux with a potential builder of my new house and fully intended to finish off the work on the windows in the afternoon, but quite honestly, I was so tired when it came time to start after lunch that I napped soundly for so long in order to catch up on the sleep that I’d lost the night before that it wasn’t worth starting.

But anyway, yesterday evening I was getting ready to put my camp bed up for a second time when I thought to myself, hey, what am I doing? I have a caravan standing outside on my lawn and although it’s not in a fit state to live in right now as I’m in the middle of several jobs, at least it has a bed! So I spent a few minutes giving the interior a good spray with ‘anti-volants’ to clear any possible mosquitoes or other ‘baddies’ that might have been lurking and transferred my bedding over from my living room.

Here are a couple of shots that I took this morning. You can see what I mean with the interior being somewhat in disarray with the old fridge having been pulled out and the new one waiting to be installed.

null

null

And I have to say that I slept pretty well. The bed in there is clean, probably no worse than the ones that I’ve slept in in the French Première Classe and F1 hotels that I’ve stayed in, and was at least as comfortable as my proper bed, if not more so. I was dozing after waking up when my neighbour, Chantal’s, little dog brought me to full consciousness by barking outside the door. She always comes to see me as soon as she’s let out in the morning (the little dog, not Chantal…) and she obviously knew that I was inside the caravan.

So that was a good time to get up and face the day – and a little dog that was soaking wet from the dew on the long grass and wanted nothing more than to jump up and lick my face. What more can one want from this life of ours?

Footnote – I can’t wait to get rid of those awful curtains…

And then there were two

I had another one of my disturbed nights – not so much disturbed as I just woke up early, having had only between 5 and 6 hours sleep. Anyway, I couldn’t get back to sleep, mainly because I’d been bitten like crazy by a mosquito during the night – on my face, finger and wrist – so I thought that I might as well get up, have breakfast and get straight onto installing the second replacement bedroom window.

We’ve got a marvellous spell of weather in prospect for the rest of this week and as I already have one meeting lined up with a building contractor tomorrow morning, I must make the best use of it to finish off the work I have to do on the house to give myself time for packing and getting ready to leave, caravan work and meeting, hopefully, with the other contractors that I contacted last week

After I’d had breakfast, I blasted on to clear the second (my) bedroom, create space to work in and cover up what I couldn’t take out to protect it from dust. Then I attacked the window and frame in the same way that Wim and I did the other last week and soon had it out on the ground outside. I was disappointed to find that when the frame was removed, the wall on one side was sunk so far below the plaster surface that there was nothing to drill and plug to take the screws to hold the window frame in.

So I had to make it good with sand-cement mortar – I did a bit on the other side too actually – and I thought that this would mean that I’d have to then leave the job until tomorrow when it would have cured. However, for once the hot sun worked in my favour and after I’d had a quick lunch, I found that the mortar was already hard enough to be screwed and plugged. So I was able to get the new frame in today after all, and in fact the job was generally better and the fixings also better than I’d got with the other window.

By the end of the afternoon, about 5.30 pm, I got this second window, to the same stage as the first ie ready for sealing and finishing, which I hope to be able to do tomorrow. Here they both are.

null

The next three shots show the window closed and open in swivel and tilt modes.

null

null

null

Here’s a shot of both windows taken fom the outside.

null

I think it’s a great improvement and it is, in purely practical terms. The bottoms of the old window frames were totally rotten and when I broke them out I found that they contained a lot of insects that like that sort of thing and that were finding their way indoors. One of the panes in my bedroom’s window was also a cracked and it’ll be nice to see the back of that. Just to finish off, here’s an old shot of the house with the original old windows, from 2016 I believe when they were actually in better condition than now.

null

What do you think? Was it worth it? I think so… 😉

Got there in the end

There are two stages in the French property sales process. In the beginning you sign a ‘compromis de vente’ that expresses your intention to buy the property. It sets out your and the sellers rights and obligations and usually, after a brief period (10 days?) during which the buyer can withdraw from the process without obligation, the latter pays a 10% deposit. Then after a period of 3 months, which can be reduced by paying an additional fee, the ‘acte de vente’ is signed at which time the former pays over the rest of the purchase price plus fees and taxes and becomes the new owner.

The prime difference with buying development land compared to an existing building is that the buyer doesn’t have to pay anything on signing the compromis de vente and only hands over a deposit when they have acquired a development permit, or ‘permis de construire’. This is because obtaining a permis de construire can be a fraught and risky process and if they are unsuccessful, the buyer can withdraw fom the transaction without penalty.

I signed the compromis de vente for the land in Fleurac on which I plan to build a new single-storey house in the first week of January after which I did find that obtaining a permis de construire for it was indeed a fraught and convoluted process. Some of my problems originated with MCA, my original choice of builder, who let me down by doing essentially nothing between the end of last year when I expressed an interest in one of their house designs and the first week in April when I kicked them into touch.

By then I had developed my own design and started the process of applying for a permis de construire for it, which was promptly kicked back by ‘les architectes des bâtiments de France’ (BDF) the national organisation which has the responsibility for protecting France’s heritage and traditions. They said that my modern design was unsuitable and, at the end, clearly indicated that they didn’t think that any building should be allowed on my parcel of land, which was outrageously beyond their remit, as the local authority responsible for planning had approved it for building on.

I also objected strongly to being dictated to in such an off-hand manner and took the bit between my teeth. The mayor of Fleurac agreed with me that BDF had over-stepped the mark and told them that as Fleurac is not in an officialy protected zone, it was the commune who should decide whether my house should be allowed to go ahead and it was its view that it should.

And so, six months almost to the day after signing the compromis, today was the day when I signed the acte de vente for the land in question. But not before further hic-cups which I’ve now learnt are only to be expected in France. I mentioned in my last post how tortuous it had been to execute a transfer of a £sterling amount from my UK bank to my French bank account and how it had been explained to me that I just had to shut up and expect the system’s delays.

This was like a red rag to a bull, of course, and I complained bitterly at my bank how it was incomprehensible to me that a process that would take 2 hours in the UK takes 2 days in France. In fact the transfer arrived in my French bank account late yesterday evening and as I could not complete the subsequent transfer from my account to that of the seller’s ‘notaire’ myself, I fired off an email to the bank saying that it was essential for them to implement it as soon as possible in the morning and then let me know when the funds would arrive in the notaire’s account.

I needed to know that as if the delay was going to be 24 hours as I’d been told, I’d have had to postpone todays’ meeting for the signing of the acte de vente. But I had an early meeting on site with a prospective contractor so was unable to contact my bank first thing and it was getting on for 11.00am by the time I was able to get into the branch. I’d learnt my lesson about not bothering to get anything done over the phone and knew that I’d have to ask the questions of the branch face-to-face.

And lucky I did, because what did I find? They hadn’t even seen my email let alone opened it, read its contents and actioned my request. This would almost have been a hanging offence for a bank in the UK but they seemed fairly unperturbed by it all almost as though this was normal practice. CA in Montignac really are hopeless and seemed somewhat shocked when I demanded that things happened immediately.

My email was found on the clerical assistant’s computer (why is checking incoming emails not the first thing she does every morning after logging on?), its contents printed out and an immediate transfer made as I’d requested. When I asked how long it would take for the funds to arrive in the other account, I was told 2 hours which was quite a lot different to what I’d been told yesterday, so with nothing more for me to do, I left.

I emailed the seller’s notaire telling them of the problems I’d encountered, to check their bank account and to let me know if the meeting scheduled for this afternoon would have to be cancelled but shortly afterwards I got a call saying that the funds had arrived and by late this afternoon the acte de vente was signed and I was officially the owner of the terrain at Labattut Basse in Fleurac. And I was so exhausted by the events involved and the long day I’d endured yesterday that I couldn’t wait to get home and take a nap!

I met the contractor this morning at the Mairie at Fleurac before showing him the way to the site and took the opportunity of dropping in my ‘déclaration préalable’ for siting my caravan on the land before and during the construction works. They’ll find it when the Mairie opens tomorrow and here’s a mock-up that I included showing roughly what it will look like when the caravan is there.

null

Quite honestly, with all of the work I’ve been doing on my house in recent months and weeks and with what I still have left to do before I can move out, I can’t now wait to get into the caravan even with all of the inconveniences that it will involve. I think that the first thing that I’ll do is sleep non-stop for two days 😉

Another one of those days

This is what all of my days are like now, and probably will be until I eventually move out of my house at the end of this month.

I woke up just before 5.00am (having got to bed last night at 12.00am) with my mind racing about a problem to do with my house sale. I told the buyers that due to the diagnostics report saying that my gas hob has ‘anomolies’, the easiest solution would be for me to change it for an electric one. But it turns out that it’s not – my old fusebox doesn’t have enough circuits for an additional 16A supply and it would be crazy to upgrade it now as the electrical supply is soon to be buried in the garden (rather than coming in via overhead line) and that would be the ideal time to move all of the outmoded boxes outside in advance of a planned kitchen upgrade.

I have found out that in order to resolve the previously mentioned ‘anomolies’ with the existing gas hob, two ventilation holes, one at high level and the other low, each of 100cm2 would need to be banged through the walls of the kitchen. It would be madness to do that now as I know that the buyer wants to have a ceramic hob in the future at which time the holes would be unnecessary, and who wants to have holes that big in your walls connecting direct to the outside and letting freezing cold air into the room in the winter?

So I needed to write a long and detailed email to my buyers explaining my reasoning and I’m now waiting for a reply. I hope that they see sense – I think they probably will.

Then onto my next job – arranging a sterling transfer from my UK bank to euros in my French bank account. This was a big priority as I have a meeting tomorrow afternoon to finalise my land purchase and the full funds have to be in the account of the seller’s notaire by that time. Despite the £ not being quite as high against the € as I had hoped I did the transfer on line before mid-morning which should usually be in plenty of time.

Then moving on again. I have a meeting on site with a prospective contractor tomorrow morning. He has a good understanding of the problems that were involved in getting my house approved and he requested having a full copy of the ‘demand de permis construire’ and the ‘arreté’ that I received giving me the approval that I needed. This involved scanning umpteen pages onto my computer, packaging them up and getting them across to him on line, a task that required quite a lot of time and effort.

Then it was time to check on the progress of my currency transfer. The UK end reported that the funds had gone but there was no sign of them arriving in France. OK, time to continue with other things, namely to create a ‘declaration préalable’, which is a dossier similar to a ‘demand de permis de construire’ and submitted in duplicate to the Mairie in order to obtain permission to place a caravan on the construction site before and during the building works.

This is yet another bureaucratically demanding device that can be created on line but which you have to spend quite a bit of time and effort on in order not to make any errors that would result in it being summarily rejected. You also have to create detailed plans showing the terrain and the proposed siting of the caravan on it plus I was advised by ‘Urbanisme’ at Rouffignac that it would also be helpful if I could mock-up a photograph of the caravan on the land, much as you have to do for the ‘demande de permis de construire’ for the house that you propose to build.

So once again, a lot of work that eventually brought me up towards the end of the ‘normal’ working day, approaching 5.00pm. So time to check again on the currency transfer and no sign of it, which began to cause me some concern, so I decided to ring my bank in Montignac which was fortunately open until 6.00pm today. And I tred and tried for at least 10 minutes but just kept getting the message ‘all of our lines are engaged’. I got through once but as soon as the banal music-on-hold started I was immediately cut off and I was back into the same cycle.

So this was beginning to be something of a crisis and there was nothing left to do other than drive to the bank personally. When I did and explained my problem I was told in a very off-hand way that this time-scale was usual in France and that a transfer made any time today would not hit my French bank account until tomorrow. I was gob-smacked. I then asked how long it would then take to do my ‘local’ transfer which needed to be effected by mid-day tomorrow and was told in the same off-hand way that that would also not hit the receiver’s bank account until the following day.

I was truly appalled by how hopelessly inefficient the system is here in France. A transfer that would take minutes in the UK (let’s say up to 2 hours in order to allow for possdible blips) takes 2 days here. I was disgusted and turned on my heel and walked out, not for the first time I might add.

There was nothing more that I could so it was time for some refreshment when I got home before moving on to the next job – removing the old caravan fridge in readiness for installing the new one which is now standing in my kitchen. It took a bit of working out and some careful disassembly so as not to do any damage to its wooden surround into which the new fridge will slide, but I eventually succeeded, bar undoing a single gas connection, at 9.30pm.

An hour or so ago I checked my French bank account and lo-and-behold my transfer had arrived. I tried to do a transfer on line myself to the seller of the land’s notaire but was not allowed to as it was above my permitted ceiling. So more time was then spent typing an email emphasising the urgency and instructing the bank to make the transfer on my behalf as early as possible tomorrow morning. I’ll need to contact the notaire as soon as possible after my site meeting tomorrow to see what the position is regarding finalising my land purchase that afternoon, but I’m not optimistic.

So a long day, as they all are at the moment. After typing this I hope to be in bed before 12.00am and it would be really nice to have an undisturbed night’s sleep as I’m not getting enough hours and am now beginning to feel the effects. I knew that this wouldn’t exactly be a fun period but I have to say, it’s turning out to be quite a lot worse than I originally expected.

Here’s the problem

Today was Bedroom Window Day 1 and Wim had kindly agreed to give me a hand after having only arrived back home yesterday evening after a few days away with Sophie and the dogs in their camping car, so I had got everything ready and had already made a start cutting the old frame out by the time he arrived. The new bedroom windows, which have been standing outside under a plastic cover for about six months, are nothing like as unwieldy as the patio door that we did together at the end of last year but are heavy enough to need the two of us to safely lift them.

We really wanted to split the window section from the frame but as the manufacturer hadn’t included any instructions and there are also none on their web site, we had to work out how to do it. It took us several minutes but when we’d cracked it it turned out to be really simple to do. After we’d carried the window section up to the bedroom Wim went back for the frame while I carried on cutting around the old frame with a cutting disc on my small angle grinder and slicing through the three metal brackets on each side that attached it to the wall.

This made the frame really loose and after Wim had cut through the bottom section at each end, the whole frame came out with very little damage to the surrounding wall. If only the ‘expert’ that I’d hired to do the three bathroom windows had done the same he’d have saved an enormous amount of time and heartache (on my part!). It was then time to offer the frame into the window aperture and see how good and effective my measurements were. The answer was perfect! The frame sat beautifully in the window aperture with almost perfect gaps on its sides and bottom (the top ascended into a gap above the aperture as the old windows had done) and I could see that there would be very little making good to do.

Having started at 9.00 am we’d got to this stage by only 10.30 so after a cup of coffee, Wim was able to leave as I could handle the next steps alone. Unfortunately I found that the screws that I’d got from Brico Depot over the week-end were nowhere near long enough for the new frame so I knew that for starters I’d need to go back again and this time try to get hold of the special screws of the right length that are available for fitting replacement windows. After clearing a few things away and just moving my ladder to the back of the house I left for Brico Depot with the bedroom window wide open of course, at about 11.00 am.

And then the usual old problems started to rear their ugly heads. Yes, Brico Depot did have some of the right length screws but, naturally, none of the special wall plugs that are needed for them. So I set off for home without the latter thinking that I’d stop off for a bite of lunch and then head down to Briconautes in Montignac to buy some there. However, at the roundabout just before Briconautes the turn-off had a ‘road closed’ sign, and so did the next one from which you could double round to get to Briconautes from the opposite direction, so I was stymied!

Nothing for it but to head off down to Bricomarché in Sarlat, another 25 kilometres or so in the opposite direction, where I did manage to get what I needed. However, it was pushing 4.30 pm by the time I got home again, so the whole exercise as well as adding something like 60 kms or more to my car had wasted going on for 6 hours of what should have been productive work time. And this always seems to happen – one store never seems to have everything in stock that you need to do a job and you end up spending hours driving around half of the Dordogne to get what you need.

The ironic thing was that my problems didn’t end there. It turned out that the walls either side of the bedroom windows are made from terre cotta blocks which I know from experience are hopeless at taking wall plugs after you’ve drilled them. And such was the case this afternoon. It turned out that although the special window fixing screws worked fine, the special wall plugs that I’d spent hours driving around to buy were ineffective.

So after drilling the side fixing holes I then had to completely remove the frame again, use some larger wall plugs that I already had which fitted more tightly and then replace the frame as accurately as I could to make the holes and plugs line up again. I managed to do it, mainly because the old frame had caused so little damage when we’d removed it earlier, and I did the minimum of making good necessary to make the job weather-tight.

As the window section is pretty heavy for one person to man-handle, my original idea was to wait for Wim to return before refitting it. However, I thought I’d give it a go and after a couple of missed shots lining up the bottom pin that slips into the bottom pin, I was amazed that I managed to do it. It was then only a matter of closing the window and carefully jacking up the window section in the frame to line up the top pin that slides into place to hold it in.

Once it was correctly aligned, it slipped in surprisingly easily and to all intents and purposes the job was done. I’ll leave all of the final making good and sealing until both windows have been done but for now, here are a ‘before’ shot taken of the window in the other bedroom and an ‘after’ shot of the window that was put in today.

null

null

I’m delighted with the results and I just wish that the person who I entrusted to replace my bathroom windows had done an equally good job. So now just the second bedroom window to do and a new electric hot plate to go in and I’m all finished. I’d like to make some phone calls tomorrow to do with the new house build and as I’ve been working flat out without a break for several days, I’ll probably then take it easier and just get the other bedroom ready for its new window on wednesday when Wim will be available again. And if it makes as little mess as the work today did, I’ll be very happy indeed 🙂

At long last!

I made another early start and spent another full day working on the caravan’s ‘salle d’eau’. To say that I’m fed up to the back teeth of it is an understatement but at least at long last I’ve now finished the unit I’ve been building to house the Porta-Potti chemical toilet. It isn’t the thing of beauty that I hoped it would be but at least it should be functional with its built-in locker to house the toilet’s chemicals.

null

null

Here’s a closer view of the locker. I’m very disappointed because I had a terrible time fitting the lid. The screws that came with the small brass hinges that I bought the other day in Bricomarché in Sarlat were so tiny that the heads mashed up while I was trying to attach the lid to the main body. The problem was that I couldn’t see what I was doing due to access problems and I ended up having to throw them away and grind down the heads of some large screws that I could screw in using a normal size phillips screwdriver.

null

The other problem is that because I didn’t cut my straight lines straight enough and because I made the lid from a different sheet of plywood from the main unit, which was slightly warped, even though I’ve eased it as much as I can, the lid is staying slightly open. I think that I’ll probably have to fit a magnetic latch as the pressure needed to get it to sit down is only very small and leaving it the way it is will annoy me. The other side is just blanked off to make the space into which the Porta-Potti slides but even that took me most of the day to complete.

null

Now the money shots with the Porta-Potti in place.

null

null

null

I’ve still got the sealing to do – the whole ‘salle d’eau’ as well as the unit itself, to make sure that no water can get where it shouldn’t – plus I’ll need to install a shower curtain arrangement as I described in my previous post. And I’m still waiting for my electric water heater to arrive that I’ll need to fit to make the whole thing viable.

The unit will do its job but what disappoints me is how long the job has taken. One of the main contributory problems is that the caravan is in the far corner of my garden and getting to it from my workshop involves a round trip of about 100 metres. Not only is this time-consuming and tiring, it’s also very tedious when I have forgotten something and have had to go the whole way back to my workshop to get it and then walk back again to the caravan.

I’ve just this evening spotted another newer, larger Fendt in my price range on Le Bon Coin. However, although I think that the caravan I’ve got was definitely a mistake, I think that I’m now too far into it to take a different direction. I’ve just received the material to do a repair on the door and I’ve also ordered a new 220v fridge and common sense tells me that it would be too much given the time that’s now available to take on anything else, given that I’ve still not started to make the necessary preparations to leave my house and arrange for someone to do what’s necessary on my land to site the caravan – ground clearing and levelling and connections for electricity and water. There’s much still to do and time is ticking away.

Pressing on

I’m continuing to work on the caravan and the job in hand is the ‘salle d’eau’ or toilet for the non-French speakers. When I acquired it there was no toilet – just a wash basin – and I will need both a toilet and a shower facility. Originally the caravan would have had a fully fitted toilet, probably a Thetford model, but someone must have removed that a long time ago and built in a horrible flip-top cupboard arrangement in its place.

The trouble was that as well as the cupboard not being waterproof (and also most unhygienic), whoever did the job also left a gaping hole in the side wall of the toilet compartment into which the original Thetford would have fitted, as shown in the following pictures.

null

null

null

My aim was to come up with an idea for some kind of unit that will not only provide me with a toilet but will also rectify the above and will be waterproof so I can take showers without worrying about causing damage through water seepage into the toilet compartment walls and floor. It has taken me several days so far to do it and I’m not yet finished, but here’s the state of play as of today.

null

null

I recently acquired a Thetford 365 Porta-Potti chemical toilet (much loved by caravanners) and eventually it will sit on the main platform with a small cupboard with a flap-up lid on its left as you look at it, for the chemicals and so on. Getting to the present point has been the hardest part of the project and from now on it should be plain sailing to finish off the build in-situ.

Everything will have been varnished to make it waterproof and all that will then be necessary will be to seal all around its joints and edges with waterproof mastic and fit a couple of shower curtains, one shorter one to pull across in front of the toilet and the other full-length one to cover the toilet compartment door. I just hope that I haven’t overlooked anything in my plans 😉

So near…

The more time I spend working on the caravan that I bought a few weeks ago, the more I am becoming aware of its shortcomings in respect of its suitabilty for living in for an extended period of time. It’s a bit smaller than I would like and due to its age, its design leaves something to be desired. I could do it, but I’m becoming less keen.

My friend Madeleine frequently has the knack of getting immediately to the heart of a problem and when I mentioned this to her a week or so ago she said, simply, “OK, then why don’t you just get another one.” I guess that with this subconsciously in my mind, even though I’ve got the one I bought on my front lawn and have been working on it, I still left my search up on Le Bon Coin and have been checking to see what’s come up every day. And yesterday, a bank holiday here in France, I spotted another Fendt.

This one was bigger than the one I’ve got, 6.5 metres long compared to 5.95 metres, newer, more modern and, from the photographs that I’ve shown below, much better fitted out.

null

null

null

On the face of it it would have been a much better prospect as a home that I could be living in for more than a year and to cut a long story short, I was due to drive down to the Aveyron just after the time I started typing this. It’s only a 100 miles or so but about 2¾ hours drive each way, to see it and if I’d decided to go for it I’d have had to go back with the Kia to pick it up tomorrow.

Having the two caravans would create more new problems for me but I have a feeling that ultimately it would be the right way to go. I’d just have to finish the work I’m doing on the old one and resell it before I leave Plazac at the end of June. However, the decision was taken out of my hands because although I’d arranged with the seller to meet up at 11.30 this morning, just as I was about to go out of the door I received a message saying that the caravan had been sold.

I DO wish people wouldn’t do that after you’ve made an agreement. I was disappointed but lucky for me that I saw the message before leaving as otherwise I wouldn’t have seen it until I’d arrived at my destination. But maybe I’ll just keep looking though, having come this close…

It’s official!

We’ve got yet another miserable wet day today and I’m beginning to get worried by the amount of time I’m losing getting myself ready to move out of my house. I need to be out in the garden cutting up metal bits of old aircraft to take to the déchetterie but I can’t do that while it’s raining as I’ll be using an electric angle grinder.

I’m trying to make the best use of the time that I can by doing stuff that I need to do in the caravan but even that’s not easy as I have to keep crossing the garden and going in and out in the rain which is both messy and time-wasting as I have to keep waiting for the rain to die down a bit if it’s raining really hard. It looks as though the weather might change towards the end of next week but if anyone knows how fickle and unpredictable the Jetstream, that’s causing all these problems is, it’s me.

Today I’m working on installing the Porta-Potti chemical toilet that I got hold of on Le Bon Coin a week or two ago. While I was heading to my workshop to pick up a couple of things I thought I’d check my mailbox and inside was a large brown envelope headed Mairie de Fleurac containing the following.

null

So at long last it’s official! I can now go ahead and finalise the purchase of the land for my new house and start talking seriously to contractors. It has also brought home to me how much I still have to do before moving out of my current house. Time is passing very quickly and I will hardly be able to take a rest until I’m actually installed in my caravan so I’d better knuckle down and get cracking installing this ruddy toilet 😉

Turning up the heat

I’m beginning to think that the old caravan that I bought wasn’t that good an idea as there are quite a few things that I need to sort out in (and on) it, all of which are costing money, and since I got it, several other newer vans have come up on Le Bon Coin, many at lower prices than I paid. But I guess that you can’t win ’em all and I’ll just have to bite the bullet and make the most of it, because at least it has proven to be leak-tight in the dismal wet weather that we’ve been having for practically the whole of this month.

Today as it was fine (very warm actually) and I could work outside, I decided to turn my attention to its heating system. Remember this?

null

null

The caravan’s gas powered heater was removed long ago and replaced with this, how can I describe it… object. It’s an electric fan heater that has been designed to look like a miniature wood burning stove. For the life of me, I can’t imagine what kind of person would have bought this thing back in the day, but someone did and after cutting a hole out of the panel where the gas heater had once been, they had literally stuffed ie wedged it, in its place.

null

You can’t see it very well in the above pic, but there was a gap either side of the thing through which you could see the caravan’s wheel arch and where it had been wedged in and, presumably, subsequently removed at some time, the woodwork along the top of the hole into which it had been shoved was split and very ugly looking.

Well no more. How anyone could have lived in the caravan with this monstrosity I do not know and I decided to make it a priority to replace it with something more practical, more effective and with more eye appeal. When I leave my house, I’ll be taking with me several electric heaters that I acquired not long after I moved in that can be either floor or wall mounted, so it made sense to use one of those for the caravan.

Unfortunately, I long ago mislaid the left-over wall mounting brackets so I had to make up a set. The aluminium that I used was a bit flimsy but I’ll have to see how it gets on and for now at least it seems to be OK. I made up a new panel from plywood to mount the heater on and also patched up the holes in the floor that had been left that were invisible as they were behind it but which I just didn’t like to leave. Everything was varnished and I was very pleased with how the job came out as the match is incredibly close to the existing woodwork, as the following shots show.

null

null

null

null

I know the heater works but can’t try it out for now as I had to cut its plug off to push its cable through a hole to the back of the panel. I’ll have to get hold of a new one to finish the job off. There’s also plenty of space in the cavity behind to take the water heater that I have on order and as the pictures show, there’s a hole in the woodwork to the right of the new heater where I’ll be able to fit a switch for it, making everything look very tidy and much, much better than before.

Anyone want a fan heater that looks like a miniature wood burner? Very little used, only one owner… 😉

Big sigh of relief!

I made a fairly early start and went over to the Mairie at Fleurac this morning. As I half-expected, it was closed with the door and windows all shuttered. However, as I was silently cursing my luck and thinking that I’d have to wait until Monday at the earliest before I’d be able to get more information on the status of my permis de construire, the door opened and the mayor emerged. We greeted each other and as he knew why I’d come, he invited me in so he could show me the ‘arrêté’ that I was talking about.

It turned out that things had become quite complicated. Les Architectes des Bâtiments de France had given a thumbs-down to my house because of its modern day ‘pavillon’ style ie not sit-up-and-beg traditional high roof Perigord, and also because it is in the shape of a ‘V’ and the mayor showed me their letter that expressed their non-approval. However, he had told them that as the area is NOT a protected area despite being one that Bâtiments de France have designated as being ‘of special interest’, as far as he and the commune were concerned, my proposed design was perfectly acceptable.

I said that I was not interested in the complicated details and that all I wanted was a simple answer to a simple question. Will I be getting my permis de construire? He said that yes, I would be, but as shown in the final section of the ‘arrêté’, it will be subject to certain conditions to keep Bâtiments de France happy. These are that I conform strictly to the approved colours for my facades, ‘menuiseries’ (woodwork, window frames, shutters) and roofing and that my roof has a minimum pitch of 35%.

I was fully aware of all of these and took great care to incorporate them in my plans, so I’ve already taken them into account and they will not inconvenience me in the slightest. So I’ll be getting my permis officially in about two weeks time, which is a HUGE relief. It means that I can not only now finalise the purchase of the land but can also start to make other detailed plans in relation to placing the caravan on it, finding a contractor and moving out of my present house.

null

null

Unfortunately due to the time of year and the steps that will be needed to progress the project, I can’t see any building work getting underway until the spring at the earliest so it’ll be in my interest to get myself nicely settled in the caravan and as comfortable as possible – ‘as possible’ being the operative words 😉

Still much uncertainty

As it’s more than a month since I lodged my ‘demande de permis de construire’ at the Mairie at Fleurac and I have received no response, especially no negative response, I thought I’d contact Urbanisme at Rouffignac to check on progress. I thought that this automatically meant that my ‘demande’ would be approved, but still subject to the ‘normal’ 2 month timescale for a ‘tacite’ agreement. However, it appears that this only applies for ‘small’ works and that I must wait out the full 2 months before I can assume that I have a go-ahead. More importantly, a turn-down is still possible at any time during that period.

However, I was heartened to receive a very prompt reply to my email which not only included the above information but also said that an ‘arrêté’ had meantime been sent to the Mairie for signature and that I might like to contact them for more information. An ‘arrêté’ is a legal pronouncement or decree and it’s the official response that you receive to your planning application. Here’s a copy of the one that I received three years ago for my house extension which I never went ahead with.

null

Having been told that, for a short time my heart leapt. That was until I realised that you also receive an ‘arrêté’ when your application ‘n’est pas accorde’ ie has been declined. So I’m still no further on this morning and won’t be either until I can get advance information on the contents of the ‘arrêté’ or I actually receive it by post in the fullness of time. And I say ‘fullness of time’ because as the example above shows, after being signed by the Mairie it then has to be sent to the Sous-Préfecture at Sarlat, stamped by them and returned to the Mairie before being sent out to me, a process which takes up to another two weeks.

Today is a holiday in France (Ascension Day) but the Mairie at Fleurac would be closed anyway until tomorrow. So I’ll be going there tomorrow morning and just hope that they won’t still be closed with a ‘fermeture exceptionelle’ to give themselves a long week-end, which is what happened at Easter when I lodged my ‘demande’, losing me a week right at the start of the process.

So the possibility still remains that I could have my house build plans turned down, meaning that I’d have to cancel the purchase of this particular terrain and launch an urgent search for another. The only certainty at this point is that I must be out of my present house by the end of June, so there’s a distinct possibility that I could then be homeless without even any land to park my caravan on in which to live.

MCA, my original choice of house builder, has much to be held to account for as I’d never have been in this position if they hadn’t footled around and lost me three months from the beginning of January until the beginning of April when I eventually kicked them out and took charge of my project myself. I wish now that I’d done it sooner but as it is, I have no choice but to live with the consequences and the uncertainty that’s arisen as a result.

Almost there

It’s taken blood, sweat and tears – well blood and sweat anyway – but I’m now at the point that I’ve only got to install the two new windows in my bedrooms and I’ll have completed all the work that I promised the buyers I’d do. That will have to wait for the next spell of good weather, which could be a week or so away, so in the meantime I’ll be able to think about starting to clear all of my possessions that I want to keep and disposing of the stuff that I don’t.

Here are the shots that I took this evening of the now finished bay window and bathroom.

null

null

null

null

It’s now over a month since I lodged my ‘demand de permis de construire’ for my new house at the Mairie in Fleurac and as I’ve not received a negative response, this officially means that the demande will be granted and that I can start to move my plans forward. As soon as the purchase has been completed, which I’d like to do as soon as possible (although the seller still thinks that I should get confirmation first from the Département d’Urbanisme at Rouffignac, so I sent off an email this evening) I can put up a ‘panneau’ (panel) detailing the work that’s planned and start work as from 9th June.

In the meantime I can resume my search for a builder and press on with my moving arrangements, so much still to do. I try not to lose sight of the idea that as with all things, this too will end and my life will revert back to being tranquil and ordered. But there’s no chance of that just yet… 😕

Ironic

When I first moved into my current house nine years ago in 2012 there was an awful pong in my bathroom and when I exposed the pipework by breaking away the boxing around them at the foot of the wall, I found out what the reason was. A joint in the plastic waste pipe had not been made correctly and had been leaking for years but as I needed to put in an electric water heater (what is referred to over here as a ‘ballon’) and make connections for my washing machine’s water supply and waste, it was a simple matter to do the repair of the waste pipe at the same time.

And that’s how my bathroom has remained ever since – with the pipework exposed and the bottom of the wall broken away to get at them. So it’s a bit ironic that after all this time I’m now doing the making good that will end up making my bathroom look quite presentable again, work from which I will derive little benefit as I’ll be moving out in the not-too-distant future and from which my buyers will get the main use and enjoyment.

But that’s viewing things with the benefit of hindsight. My intention was to do the boxing-in of the pipework and the making good after I’d installed the new double-glazed windows in the bathroom and, of course, I bought the windows before I knew that I’d be moving, as I did also the new patio door. But having told the buyers that I would finish installing the new patio door, put the new windows in in the bathroom and do the making good, now I’ve got to stand by my word and do it.

I started on the bathroom work yesterday and made good progress before eventually running out of plywood. This morning from 10.30 am was my friend Victor’s birthday celebration and as Brico Depot opens on Sundays only from 08.00 am to 01.00 pm, I had to make an early start to get over there and back in time for the festivities. If I hadn’t, I wouldn’t have been able to do any work in the bathroom at all today.

I wasn’t able to get cracking until after lunch so it wasn’t until this evening that I was finally able to finish up and call it a day. Boxing-in pipework can be a fiddly, tedious job as it has to be done accurately and this is very difficult in a house like mine in which nothing’s vertical and there are no right-angles. So although I was feeling very tired at the end of it, I was very pleased with the results.

null

null

null

null

null

Now there’s just the final cosmetic making good and painting to do. I’ll be able to combine the latter with doing the walls either side of the patio door so hopefully if things run smoothly, I’ll only need another couple of days or so to get both jobs buttoned up. Then only the new bedroom windows will be left to do but I have no intention of tempting fate at this stage by saying how soon I think they will be in, bringing to an end all of the ‘building’ work that I said I’d do

The weather has taken a turn for the worse now (as I was typing this earlier, rain was pounding against the new patio door) and it will remain bad for the whole of the coming week. With a bit of luck that means that I’ll be able to spend some time on ‘moving out’ stuff. I’d like to think that I might be able to get some packing started of stuff that I don’t have an immediate need for and I have to start thinking about clearing out the stuff that I’ve put in my ‘grenier’ upstairs as well as what was left by the previous occupier. I’ll have to see how things pan out.

Ta da!

OK, done. The walls either side of my new patio door have now been plastered. And it was every bit as tough as I thought it was going to be. But never mind, the whole job’s not finished yet but its back has been well and truly broken. Just some finishing to do with fine filler here and there and then just sealing of the new tiles, painting and sealing around the frame with a mastic bead to be done.

Here are the walls as of this evening. Yes, they have lots of irregularities and humps and bumps but they are supposed to have, because that’s what the walls are like in my living room. I’ve not been able to match the existing texture exactly, though. I’d have needed a ‘mate’ assisting me to do that. I think the original decorators applied the plaster as I have done spreading it on like butter with a small trowel. Then they applied a texture to it using a stiff bristled brush while it was still soft. I tried to do that but the plaster was going off so quickly that by the time I got round to it, the plaster I’d put up was already too hard.

null

null

So when the patio door is completely finished I’ll be able to return to the making good along the foot of the bathroom wall. And when that’s done, I’ll only (only he says…) have to install the new windows in the bedrooms and I can start to think about the process of moving out. To quote Mr. Barnier, the clock is ticking…

Slightly unconventional

Before I could embark on replastering the walls either side of my new patio door I had to make a new corner on the wall on the right hand side. This was because the old rendering on that side was far too thick (because of the old metal door hinge having been buried – see earlier posts) with almost the whole wall on that side needing to be cut back to the original stone. Unfortunately when I chipped it off, although I’d tried to retain the whole edge up to the corner of the wall, quite a large portion broke away. This needed to be replaced in order to give me a full edge to plaster up to and this was today’s main job.

But before I started, I needed to zip across to Brico Depot after Wim and I had enjoyed our regular Sunday morning coffee together before they closed at 1.00 pm. I went there yesterday without checking on the internet only to find that they were closed for France’s May Day holiday, so had to go again today to pick up some plasterboard tape to finish off the ceiling above the patio door. So it was already early afternoon before I got going, later actually, because after I’d had a salad for lunch when I got back, I connected up the caravan’s gas for the first time and tested the hob, which worked OK I’m glad to say.

Usually when you plaster up to an edge or a corner, it’s a good idea to nail some kind of board to the wall to give you a solid edge to work to. I didn’t want to do this, firstly because I didn’t want to bang any nails in and risk having more plaster come off and secondly, because the walls in my house are all let’s say, irregular, because of the house’s nature and character. So I decided on a rather unconventional approach and just mounted a board vertically against the edge of the wall without actually fixing it.

The material I used for the job was the plaster that I originally used on the new bathroom window surrounds that went off super fast. That was less than desirable for that job but was just what I wanted for this one provided that I could get the plaster mix into place quickly enough. In fact, before I did the corner I used the same material but in a more sloppy state on the by now taped ceiling board and although I’d cleaned the bucket out before adding new plaster to do the corner, there must have still been enough old plaster left in it because when I did the corner, the plaster went off super super fast!

Here are a couple of shots of the corner with the board in place ready for me to start plastering. I’d placed a couple of small wooden blocks at the bottom of the right thickness to get the board standing vertically against the wall.

null

null

And here’s the corner with the plaster already cured and hard just a few minutes after I’d completed the job. So unconventional my approach might have been, but the final result turned out pretty well. If someone had said to me that this was as good as I’d get and offered me it as a final result before I’d started I’d have bitten their hand off accepting it!

null

null

null

And finally, the ceiling board. I used fibreglass tape because it’s stronger than paper and likely to give a better long term outcome. And I think that it was the right decision because with a bit of sanding, now both the ends and the let’s say, more ‘problematic’ centre area, are perfectly acceptable and ready for painting.

null

null

null

The last shot above of the centre section shows up as a bit grey because it was still moist and not fully cured. When it has gone off completely it will be pure white like the ends. So today was very successful. I also managed to get a very short drone flight in before Wim arrived this morning and to fit in an hour’s baby-sitting of my neighbour, Chantal’s little dog, so successful and also busy. Now I’m all ready for the main attraction tomorrow – plastering the walls – and I’d better get a good night’s sleep in tonight so I’m totally zoned-in and in the right frame of mind for it 😉

Another day, another job

Having done the job once before, I knew that mounting the new ceiling board in the alcove above my new patio door would be a nightmare, so I haven’t been particularly looking forward to it. I also knew that if and when I’d got the ceiling board up, I’d not then have enough time (and patience, probably) to get the walls plastered too, so I decided to make the ceiling board the job for this afternoon and to spend this morning having a good clear away and tidy-up.

For starters, my electric tile cutter has been standing since I cut the floor tiles over a week ago all messy and with water still in its reservoir and as I won’t be cutting any more tiles (I’ve got to box the pipes in along the bottom of the bathroom wall but I’m just going to use plywood without tiles, I’ve decided) today was time for it to be taken out and cleaned so it could dry in the sun and go back in its box.

I also had lots of tools lying around on the floor in my living room that I shan’t be needing for a while, so they could go back into my workshop as well, and also the workshop floor needed a good sweep-up to clear away the cement, sand and plaster that had been dropped on it while I’ve been transferring them from their bags into the buckets that I’ve been using for mixing.

Then it was time for the ceiling. In reality as I’d been expecting the worst, it didn’t turn out to be quite as bad as I’d expected. I’d hoped to get it up as a single sheet but as before, because the under-surface is so poor and the area of the ceiling so irregular, I had to cut it into two. As you can see from the shots below, the ends didn’t turn out to be too bad at all, but as before, because the sub-surface in the centre is so bumpy, the join in the middle does look a bit rough.

null

null

null

But not to worry, although I’ve got quite a few holes left where I unsuccessfully tried to use nails to hold the two sheets up in the centre, before using hefty screws instead, by the time I’ve used jointing paste and tape, the finished job will still be much better than the first time. I’ll need to source some tape tomorrow and I hope that I don’t have to spend all day driving around trying to get my hands on some, because tomorrow I really do want to break the back of plastering the walls. Then I really will be able to some proper light at the end of the tunnel 😉

More good progress made!

I’m doing my best to keep all the balls in the air and not doing too badly really. I haven’t since had time to share the photos, but the day before I went off to pick up the caravan, I finished off the new windows in the bathroom and toilet by what the trade calls ‘toshing’ a coat of white emulsion around them and in the afternoon I did the jointing of the new tiles that I laid several days ago in front of my new patio door.

null

null

null

null

null

I think both jobs turned out pretty well and I’m only sorry that with my moving out by the end of June, the new owners will get more benefit from them than I will!

Today I started tackling a job that I’ve not been looking forward to at all – making good the interior walls either side of my new patio door. It only took half a day to get the first coat of rendering on but it was a tedious and frustrating experience as it’s not easy to get a surface on the original old stone walls that’s anything like acceptable. The right-hand wall was the worse of the two so I did that first.

null

null

null

I was very pleased with the final result and highly relieved to get the first stage done. There’s still quite a bit more to do, of course, including applying the one or more likely, two coats of plaster plus the ceiling in the alcove. If a pro had put the patio door in and finished off the whole job I’m sure it would have cost a fortune, so my house buyers are getting a bit of a bargain.

Anyway, I have to keep pressing on as I need to complete the jobs that I said I would before moving out. I think that I am just beginning to see a glimmer of light, though, at the end of the tunnel…

It’s just an old caravan, right?

Regular My Trike readers will know that I’ve been on the lookout for an old(ish) caravan for quite a while, which is how I got involved in the caravan saga that I wrote about a couple of posts or so ago. I need one at least 6 metres or so in length because it’s for placing on the land that I’m buying in Fleurac for me to live in while my new house is being built and as that will now probably be for a year or more, anything smaller would be far too cramped.

My searches show that there are really only three or four significant manufacturers here in France in the large caravan market – Fendt, Tabbert, LMC and to a certain extent, Caravelair with, as I see it, the first three being the leaders. My budget (up to 3000€ max) means that I’m looking at caravans up to about 20 years old as I don’t think a higher expenditure can be justified given that only I’ll be living in it and I’ll only need it for a relatively short time before, hopefully, reselling it.

The ones that meet my needs and come up the most on Le Bon Coin are Fendt and Tabbert and my experience of the last few weeks is (a) there are very few, if any, in my area and (b) the ads for the ones that do come up are almost always taken down very quickly, presumably because they’ve been sold. This means that you have to respond to a suitable ad very quickly and also be prepared to travel some way, possibly, to see a caravan in the flesh. So what’s the story?

Unlike in the UK, to all intents and purposes, all caravans here in France (and the rest of the EU) require their own licence (carte grise) and registration idependently of the vehicle towing them. My large, two-axle trailer has its own ‘immatriculation’ whereas my small single-axle one doesn’t. It’s related to the load-carrying capacity. So what happens if an owner loses their caravan’s immatriculation document (carte grise)? If they have put the registration into their name on acquiring the caravan, no problem. They can just apply for a duplicate – it’s only about bureaucracy like most things in France.

But what happens if, possibly being a bit lazy, they omitted to transfer the caravan into their name? The simple answer is that they are sunk. If their name was not on the carte grise, even though they legally acquired the caravan from its former owner, there is no way that they or anyone else other than the registered owner can acquire a duplicate. But that’s not the end of the matter. As it’s illegal to use any vehicle requiring a carte grise on the public road without one, the legal requirement is that that caravan has to be given up for destruction.

‘What????’ I hear you exclaim, even a 3-year old Tabbert that’s worth maybe 20,000€? The simple answer is ‘Yes’. Unlike in the UK, where the Caravan Club maintains a database of stolen caravans, there is no equivalent here in France. So presumably some bright spark thought that it would be clever to introduce such a rule in order to prevent, or at least deter, stolen caravans being sold on without carte grises. But instead it has had a different outcome entirely.

Without going into detail, we all know that there is a certain class of customer that has no problem with acquiring (and presumably using) brand new stolen caravans in the UK where there is a stolen caravan database and presumably the same applies here in France where there isn’t. But that is only one segment of the market. Another huge segment comprises those owners of newish and older caravans who have no carte grise for their caravans for whatever reasons, who have no intention of giving them up for destruction and certainly not while they have reasonable residual value. So what happens then?

The caravans cannot legally be used on the road but that does not stop them being desirable for other reasons, the primary ones being for placing on a private property, such as a back-garden for a relative’s use as accommodation, for siting on a ‘leisure area’ such as a privately owned fishing lake or hunting area or finally, to be used as temporary accommodation on a private ‘terrain’ while the owner has a house either renovated or built on the ‘terrain’ in question.

Sure, caravans with a carte grise, even older ones, have an enhanced value in the marketplace, but there is still a very healthy demand for those without for the reasons I’ve mentioned above. Even older ones if they are in reasonably good shape, and especially larger ones, which offer an alternative to mobile homes that require expensive specialist transport and siting, whereas if you are prepared to take the chance and tow them ‘sans carte grise’, caravans do not.

So that brings me onto the subject of this post. I’ve been searching for a large caravan for several weeks to live in once I leave my present house on or before 30 June. I’ve missed many opportunities but kept coming back to a Fendt that was being offered for sale at what looked like a reasonable price in the Ile de France just to the south of Paris (500 kms from where I live) but which had remained unsold.

I gave the seller a ring a few days ago requesting some more photographs, which he sent, and subsequently decided to drive north yesterday to see it as I was prepared to take the chance of towing it back without a carte grise. To cut a long story short, I ended up knocking his asking price down by a couple of hundred euros and heading back south again with it behind my Kia.

I was delayed getting away from home in the morning and as I only started heading south again shortly after 3.00 pm, I knew that there was no chance that I’d be able to make it back before the curfew here in France that takes effect at 7.00 pm. However, luckily I’d planned for such an eventuality and had taken some pillows, my sleeping bag and a blanket with me, so was able to pull into a service area shortly after the curfew deadline and spend the night in the caravan.

I had an early night so I could get away early this morning and was cursed to have a vehicle with a chiller trailer parked next to me whose engine kept starting up and running during the night to protect the load. Nevertheless, I got a reasonable night’s sleep and here are some shots that I took of the caravan, a Fendt Diamant, and the Kia hemmed in by large artics in the lorry park before I walked across to buy a cup of chocolate, a croissant and a pastry for breakfast.

null

null

null

It took me between five and six hours to drive north including a (very) brief stop for a ‘tea and a pee’. However, it took around seven hours to get back, including the best part of four today, and here are some shots of the old girl after I’d arrived home and parked her up on my front lawn.

null

null

null

null

null

null

null

null

null

null

null

null

null

OK, you can see from the pictures that it’s been around the block a few times – several blocks actually. However, although it’s a bit scruffy on the outside, the interior is still quite tidy for its age and will turn out quite nice after it’s had a thorough clean right through. But the main thing is that because it hasn’t been used as a touring caravan for some time, it’s been rigged up to be used as a static with connections for mains water and electricity (notice the lights are on in some shots). That suits me just fine, although I’ll need to add an electric water heater of some kind as it only seems to have a connection to a cold supply.

Its old fridge also seems to be working, although it’s taking ages to cool down, but that’ll be a plus if it is OK. I haven’t had a chance as yet to give it a proper going over but hopefully after I’ve finished all the work on my house, I’ll have some time to sort the caravan out before moving it over to the land at Fleurac. Before then, though, I’ll need to sort out a key as the original one has been lost. But when the time comes I’ll need to make sure not to leave valuable stuff behind inside as no caravan is really secure. However, things like that are for the future…

A productive day

It started off by my heading off to Sarlat for my second Pfizer Covid jab. So hopefully that’s me done and dusted, and I bought my first strawberries and cream of the year on the way back to my car.

After lunch as the weather was so nice I thought that I’d do a flight with my Fimi X8 SE 2020 drone. I’ve only had it back a few days after returning it to China for repair so I’m still not back in the swing of things. After it went out of control and flew into a tree, I noticed that the video image on the right hand side of the frame had become slightly blurred. Fimi said that I had to return it to them and they agreed, repairing it for free and returning it with an extra battery to compensate me for the cost of sending it back. That’s what I call service – kudos to Fimi!

I only did a fairly short flight straight out from my garden over les Etangs de Fongran towards Thonac before swinging right around, heading up towards Fanlac and then home again via Le Bos de Plazac. Here are a few shots that I lifted from the videos that I shot during the flight that don’t do them justice at all, unfortunately.

null

null

null

null

null

Then by mid-afternoon I was back onto the floor tiling in front of my new patio door. It’s slow work because it has to be done properly and accurately but today was the end of the tiling proper. I’ll leave them to cure tomorrow while I finish off the new small windows in my bathroom and toilet and then come back to add the jointing in a couple of days. Here’s where I got to at the end of today.

null

null

null

I said to my French neighbour Chantal, that if I’d known at the time that I’d be selling the house I’d have gone for something simpler, plainer (and less expensive!) but it’s too late for that now and I’ve just got to see the job through. So it’s ‘Tally-Ho and on we go!’ so I can move onto the next job on the list – the new large windows in the bedrooms. I have a feeling that they’re going to be tricky…

The caravan saga – The End

This is for anyone who’s still hanging in mid-air wondering how this played out. Before I put it to bed though, here are a couple more shots of the caravan in question, heavily edited by me to disguise any clue to their true origin.

null

null

Well, I guess we all really knew deep-down that this was a scam but for the life of me because I don’t have a criminal mind I couldn’t see how they were going to make money out of it. That was until after I’d drawn the cash out of the bank to pay the ‘transporteur’, the following day I received a message saying that because his wife had suddenly given birth (yep, what a surprise for everyone, just like that, out of the blue) he couldn’t make it as planned but would be along in the afternoon of the next day.

It was then that I realised that I’d probably been over-thinking things when it dawned on me that there I was, having given my address details for the ‘delivery’ (actually, I’m not that daft – no delivery driver would ever be able to find my house using just the information that I’d provided, especially at night 😉 ) with cash in the house overnight. What a nice little earner that would be for a couple of desperadoes to break into my house during the night, threaten me in some way or another and depart into the darkness with my cash. Much better than nicking goods that then have to be sold-on for a fraction of their true value.

And an even better earner if you can place one ‘caravan for sale’ ad and get several suckers all lined up on consecutive evenings. Having realised this I decided that it was time to pull the plug, so I innocently replied saying that after re-banking the cash, for (convincing) reasons that I won’t now go into, I couldn’t continue with the caravan purchase as I didn’t know when I’d next be at home, so better for them to sell it to the next buyer in the queue. And surprise, surprise, afterwards I heard nothing more.

So somebody may have had the surprise of their life and after being denied it, ended up with a dirt-cheap, beautiful caravan parked outside their house. But somehow I doubt it…

To finish off with, a footnote about the tiling that I did yesterday. Yes, the ‘mortier colle’ did go off overnight. Like a rock. So it seems that knocking it up to be as thick as toffee is how you’re supposed to use the stuff. I can’t remember doing it like that the last time, but it was nearly 9 years ago. Maybe I did. The passing of time has a lot to be held to account for 🙁

You get the idea

At long last, after delay after delay, today I actually got started on making good the floor in front of my ‘new’ patio door – ‘new’ because it was installed last autumn and the floor has been left unfinished ever since. I couldn’t get hold of any ‘plain’ floor tiles to match the existing ones as they are so old and I decided instead to use the same special smaller hand-made tiles that I had obtained to create the pattern that I made on my fireplace.

This was before I knew that I was going to sell my house and if I had done I might have persisted in my efforts to find some 30 cm square plain ones as not only is the cost difference quite high, the time and effort to make the pattern are also considerably greater. This is due to the need to accurately cut down every one of the new smaller tiles from 16 cm square to fit in with the existing 30 cm square ones, including joints.

Anyway, it’s too late to think about that now so I just had to press on. I’d already got the new tiles cut down and ready to lay some time ago so today was all about just laying them. Or so I thought. Before getting onto that though, here’s a shot taken today of my fireplace for reference.

null

As it was nearly 9 years ago that I built my fireplace, to be honest I can’t remember much about how I did it. In particular, I can’t remember much about the special mortar (mortier de colle) that I used to fix the tiles, both horizontally and also on the vertical face of the fireplace. You never get the same brand of any material like cement or mortar at Brico Depot, probably because they just buy from wherever is cheapest at the time, so I just bought a bag of what was available and thought nothing more of it.

As it happens, I still have the remains of the original bag after all this time, although what’s left inside is solid of course, but the product descriptions are the same. So I just went ahead and mixed up half a bucketful to what I thought would be about the right consistency, bearing in mind we had warm sunshine today and after my recent experience with the plaster, I thought that there might be a chance of the mortar going off before I could use it.

But did it heck! Quite the opposite actually. I laid a bed of it down ready to take the tiles and waited a bit before placing them on top. Not only did they sqeeze the mortar out and sink below the level that I wanted but they and the mortar bed slowly began to slump forwards towards the window. The reason was that the sub-bed that I laid many weeks ago wasn’t quite level, which I knew, although it shouldn’t have mattered at all.

The amazing thing was that the mortar on which I’d laid the tiles didn’t start curing at all, even after I’d eventually picked it up again and returned it to the bucket. I tried adding a bit more dry powder to it in the hope that it might encourage the mix to go off, but it still didn’t. It stayed just as sloppy as when I’d started and repeated the same process, being unable to support the weight of a tile.

I repeated this about four times until, in desperation, thinking that I might be on the receiving end of the ‘old plaster’ problem again but in reverse (old plaster goes off very quickly, old cement does the opposite and may never go off), I decided to take drastic action, add some fresh cement and some more mortar powder to the mixture and make it as stiff as I could but still workable. And know what? It seemed to do the trick.

I made the mixture with the consistency of thick toffee – so thick that I could only get it off the trowel by using another one. But I didn’t care because it worked perfectly, or so it seemed. The mixture stood up without slumping and could take the weight of the tiles, and here are some shots of how I finally managed to leave the job at the end of the day.

null

null

null

And maybe that’s how you have to use this stuff, because when I eventually came to clean my bucket and tools at the end of the day, the small amount of material that remained was still workable even after an hour or more. Perhaps that’s what they intend and they add retardent to make it stay ‘wet’ even when it doesn’t contain much water but is just workable. But the proof of the pudding will be tomorrow morning. When I checked the newly-laid tiles a short while ago, the mortar that had oozed out from under them was still soft. If it stays the same tomorrow and doesn’t cure I’ll be in real trouble and all of my work today will be for nothing 😕

Send in the clowns

There’s an old saw – if something looks too good to be true then it probably is. But the operative word is ‘probably’. What if something looks to be really good… and it’s actually genuine? Then what?

Then there’s only one thing that you can do – go along with it but keep your wits about you to make sure that you aren’t the victim of a scam, but wouldn’t it be a terrible shame to reject something out of hand thereby missing a genuine opportunity and also unsulting someone who is acting with the best possible motives.

As regular readers will know, I’ve been looking out for a large caravan for quite a while. I need one to solve my accommodation problems when I leave my present house at the end of June with there being no prospect of my having another one ready to move into either at that time or in the foreseeable future. My hope is that by then I’ll have a ‘Permis de Construire’ for a new house though, which will permit me to complete the purchase of the land I want to build it on and allow me to place a caravan or mobile home on it to live in in the meantime.

I prefer a caravan, mainly for the ease with which it can be transported and eventually resold compared to a mobile home, plus nice caravans are more readily available too. If you can get your hands on one that is. I’ve seen several of the right size and spec in the right price bracket over recent weeks but as well as being in distant parts of the country (mainly northern France) which are difficult to get to from where I live, all have been snapped up incredibly quickly often before I’ve even received replies to my initial contacts with the sellers.

So it was with an air of resignation that I responded to an advertisement on Le Bon Coin a few evenings ago only to check back a few minutes later before I went to bed and find that the ad had already been taken down. I could hardly believe it as it had only been up for a few minutes before I sent my message – there was no contact phone number – and it didn’t seem possible that someone had got in before me and it had already been sold. And indeed it hadn’t.

What follows from here is me taking everything at face value. In the morning I found that the (lady) seller had sent me a message with an email address (gmail of course) asking me to contact her if I truly wanted to buy her caravan. I did so and here’s what has since unfolded, but first here are a couple of pictures (of the 21 that I was sent of the caravan’s exterior and interior), which I’ve edited slightly to conceal the locations they were taken at and their sources of origin, that show how superb this caravan is despite being around since 2001.

null

null

I immediately confirmed that I wanted to buy it at the asking price and that I could go down (it’s being advertised as in the south of France) with my Kia, pay her and take it away. She however demurred. She said that as long as I promised that I would treat her caravan with great care, she would arrange for it to be delivered with all of its papers to my address by a ‘transporteur’ (I don’t know whether that means a heavy vehicle or someone towing it) who would be able to complete the sale and depart with my cash payment leaving the caravan with me. She said that if I was not satisfied for any reason I could reject the sale but that she could assure me that the caravan is in perfect shape, has been well looked-after and maintained and needs nothing doing to it.

So what to do? If it’s a scam, neither I nor any of my friends or associates can work out what it is. However, there have been a couple of red flags. After a Google search, Madeleine’s sharp eyes spotted the same caravan for sale 4 years ago with some of the same pictures on an Italian web site. Interestingly, the asking price was proportionately higher and it appears that a person of the same name was behind the sale. So was it a genuine sale? Was it not sold at the time? Was it a previous scam?

We’ve also spotted a Norwegian connection in one of the exterior photos, plus there are some warning placards on the cooker that look as though they might be in Norwegian. So here we have, to use a Churchillian expression, a riddle, wrapped in a mystery, inside an enigma and there’s no way to solve it, except by waiting. The caravan is due to be delivered tomorrow so one way and another, then all will be revealed.

I have the cash waiting and if everything – caravan, paperwork, registration document (because she said that it has one, which is a big bonus) – is in order I’ll be delighted to hand it over and take possession of the beautiful beast. But that won’t happen until I’m completely satisfied and it has been offloaded at my house, and I’ll have no hesitation in turning it around if there’s even the slightest suspicion of criminality or malpractice. Then I’ll just have to keep on looking.

So is it time to send in the clowns – bizarre or what?

Job done!

Not by me, but by my good friend Wim who dropped in this morning for his usual Sunday morning coffee bringing with him a couple of crowbars and an angle-grinder. A few minutes bending it up and down with a crowbar saw the hinge break apart leaving its main body to drop to the floor and a stub of metal, the bit that I hadn’t quite cut through, sticking out of the wall. Another couple of minutes grinding off the latter and the job was done, as shown by the following photos.

null

null

You can also see, especially in the second one above, just how close I’d come to completing the job before the cutting blade of my angle grinder was thrown up giving me the whack that took me out of the game. But anyway, what’s done is done and it’s no good crying over spilt milk. I’ll let this week-end go and see next week if I can start doing lighter jobs again that mainly just need one hand, like finishing off the plastering around the new small windows in my bathroom and even laying the floor tiles in front of the patio door. I’ll just have to see how I go…

It got me!

With all the work I’ve done in my house since I came to France and with all that I still have to do, under a certain amount of pressure, before I move out on 30th June, an accident had to happen at some time. And that day was yesterday while I was removing the large forged steel gate hinge that had appeared hanging out of the wall in my living room when I’d cut back the plaster and rendering in order to make it good after installing my new sliding patio door.

The method that I decided to use – a circular cutting blade on my large electric angle-grinder – had its dangers and I knew that, the more so as I had to use it with its guard removed in order to cut the hinge off as close to the wall as possible. I’d taken precautions to keep well clear of the blade while it was in use and even until it had completely stopped spinning as experience has shown while using my small angle grinder that you can still get a nasty cut while the blade is spinning down even after you’ve cut the power to the machine. As a result all went perfectly, right up until I’d almost completed the job and the hinge was nearly cut right through.

Then, maybe precisely because there was only a thin slice of metal left that was able to ‘catch’ the spinning blade in some way, the machine suddenly jumped at great speed and with enormous force. Fortunately it missed the aluminium window frame which would have been impossible to repair and would have needed to be replaced if it had been damaged but before I could do anything, it struck my left forearm opening up quite a severe wound.

I won’t go into detail in deference to those readers who don’t have the stomach for such things, but my living room and kitchen took on something of the appearance of the Chamber of Horrors before I could grab enough kitchen roll to make a ball in order to apply pressure to the wound and run to seek help. This came in the form of my lovely French neighbour Chantal who I know can’t stand the sight of blood but who after applying a tourniquet to my arm under my instruction (which she was then told to remove before the first responders arrived) then called for an ambulance.

I eventually ended up in the emergency room of the brand new hospital at Francheville in Périgueux. By this time I was no longer leaking blood and was stable so waited while the staff attended, quite rightly, to more urgent cases. When the emergency doctor finally took a look at the wound he said immediately that it was too severe to be dealt with by Emergency and that I’d have to have an operation by a surgeon the next day (ie today).

I was in the middle of a phone call passing on this news when he came dashing back to say that actually there was a surgeon available who was going to come into the emergency room and do the operation there and then, so that was a relief. After I’d been tested and received an anti-tetanus shot, he duly arrived and after administering a local anaesthetic, got to work patching my arm up. As nothing had been damaged other than muscle, this only took about half an hour or so as it only involved cleaning the wound up and stitching the edges back together.

This doesn’t sound like much but it was about 10 cm long and 1 cm wide, so it took quite a considerable amount of skill on his part as well as lots of stitches and staples. I didn’t take a ‘before’ photograph as, quite honestly, it would have been too gruesome to share with anyone, but I did get the surgen to take an ‘after’ shot showing off his handiwork that I’ve shown below with the main detail blurred out.

null

WARNING

I would strongly advise anyone who doesn’t have strong stomach NOT TO, but those who want to see the surgeon’s finished job can do so by CLICKING HERE.

The local anaesthetic wore off after 12 hours or so and even today I can’t say that I have much pain, unless I move my arm and stretch the stitches and staples that is. I had to sleep on my back last night and will probably have to do so for quite a few nights more but I have been strictly advised not to over-use my arm eg by moving heavy weights for at least a week.

The stitches are due to be removed in 12 days time so I guess I’ll just have to put up with the fact that I’m going to lose time for the jobs that are still outstanding in my house. Fortunately I’ve still got 2½ months to go so I should still have enough time even so and in the meantime I can deal with other matters – like my new-build, the land purchase and finding a caravan to put on it for after I’ve moved out, all things I can do without requiring too much over-use of my left arm 🙂

Going backwards?

No, not really, but sometimes you have to make things (look) worse before you can make them better. And that’s the story with the walls, floor and ceiling around my new patio door that I installed last autumn but which I’m only just getting around to making good. Because of just how the house is and how old it is I always knew that it wasn’t going to be easy and I have to confess that I’d been putting off getting started.

But today was the day and I began by trimming the decorative floor tiles that I’ll eventually be laying and placing them in a bucket of water to prepare them to accept the mortar adhesive. If you don’t soak them beforehand they won’t stick properly and they’ll eventually become loose with disastrous results. I then moved on to pulling the ceiling in the door alcove down that I fitted myself just a few years ago and after that it was time to start on the walls.

If I do a job I always have to do it properly and that applies even though I’ll be moving out and leaving things behind me in the near future – maybe more so because of the latter as I’d hate for the new buyers to think that I’d done a bodge-job and left them with the consequences (as has been done to me on more than one occasion).

I always knew that the walls either side of the new patio door would need special attention because its door handles are very close to the door outer edges and you need to have space to get your fingers in when you slide the doors open. To make matters worse, both walls were rendered and plastered to suit the old windows the frames of which stood some way off the walls, which must now be trimmed back to suit the new door frame.

This won’t be too bad on the left-hand side because with a bit of cutting back towards the inside, the wall can be re-rendered and re-plastered to make a nice finished job, but the same couldn’t be said for the right-hand wall that had been built up much thicker and would need to be cut right back in order to make even a half-decent job. So knowing that, that’s the side I started with.

I was hacking the old render and plaster off using a club hammer and bolster which was a time and effort consuming job but slowly I got down to the original stonework, and then I found out why the thickness had been built up so much on that side. As the images below show, it was done to cover a door hinge from when my house was originally in use as a barn.

null

null

As the second image above just shows, the hinge extends out from the wall beyond the edge of the door frame, so that leaves only two options. Either it will have to be left in place and made a decorative ‘feature’ of by painting it for example, or it will have to be removed. I don’t much fancy the first option, so it’ll have to come out. I suppose you can’t blame them for ‘disguising’ it as if they didn’t have a cutting torch available, at the time removing it would have been almost impossible. That’s not the case now as we have angle grinders and diamond cutting discs, so that’s the next job on my list before getting stuck into the making-good proper.

The last two shots below show what I mean by ‘having to make things worse before making them better’.

null

null

The scene looks as though the ‘demolition man’ who put in my new bathroom windows had been back again, but actually things aren’t half as bad as they look. I’ve kept the corner on the left-hand side and although I’ve lost a bit on the right, it won’t be too hard to get it back again by nailing a length of wood onto the wall and plastering up to it.

I’m just so pleased to have got this stage over as once again the job created a huge amount of dust that floated right through the whole of the downstairs and up onto the landing and took ages to clear up. Hopefully, although I’ll have to take careful steps to protect the new patio door, cutting off the old door hinge won’t make such a mess, or at least I hope so.

Incidentally, I found when I hacked off the old render and plaster that at some time the plaster top coat had been applied over old plaster that was already painted white. When and why I guess I’ll never know – just one of the mysteries you encounter when you buy an old house like mine with an unknown history.

Doubly successful

My Easter week-end was all planned out some time ago with a strict job list that made me tell my house buyers that I was sorry, but I didn’t have the time for them to come over and look around the house again this week-end. I’ve had to spend so much time recently on my Fleurac new-build project that I feel as though I’m slipping behind on the work I need to do in my present house to meet the promises that I made to the buyers, so it was in their interests really that I was left alone this week-end to catch up a bit.

And to be honest, it’s becoming really stressful. As I found when I left the UK to drive a truck containing my furniture and belongings over to France which I was still loading with just a few short hours remaining before I had to catch the ferry from Dover and was forced to shut its doors and leave some stuff behind, lead-times have a habit of fast disappearing even when you think you’ve got plenty of time.

So I have to be strict. Yesterday according to my plan, I cut my grass for the first time and tidied up my garden, which looked all the better for it afterwards. It was a fairly long and tiring day so I was looking forwards to a more relaxed schedule today with just the making good to do around the third and last small window in my bathroom. I was gazing out of my kitchen while waiting for the kettle to boil when I noticed what looked like puddles of water in the entrance leading from the road down to my house and as there has been no rain for some time, I went to investigate.

Sure enough, they were puddles of water which were getting bigger as I stood and watched and to my concern, water was oozing out of the ground close to the cover of the concrete box in the ground that contains my house’s mains water stop-cock and water meter. I knew that this had to mean trouble and when I removed the cover it was full to the brim and water gushed out. Fortunately, I knew where the stop-cock was and was able to put my hand down in the water right up to my armpit and shut the flow off.

It was impossible to tell what had gone wrong without removing the water so I then began a lengthy bailing-out job using a plastic bucket. I thought that I’d waste as little as possible as I had plastering and other work planned so kept three bucketsful, the rest ending up on the ground and when I’d got the water down as low as I could, I found what the problem was.

The water supply to my house first has the main stop-cock and then the water meter. Between the water meter and where the main joins the underground supply to my house there’s some kind of small venting device. This is, or was, used by the water company to vent air out of the system if they’d been doing any work out in the road that had opened the main supply to the atmosphere so technically it should have been positioned before the water meter on the company’s side making them responsible for it.

As it was, when I called the Veolia emergency number to report the mains leak (after disconnecting once after about 9 minutes and eventually being connected the second time after about 12) I ended up arguing the toss with some young woman who clearly had no technical knowledge and was just working from her script, about who was responsible for the call-out and the work involved. In the end I couldn’t be bothered with wasting any more time and just put the phone down on her.

I decided that I’d check to see if I could do any kind of repair myself. The down-side was that I might have to leave my water supply turned off until Tuesday when I’d be able to purchase a new one of whatever was needed, in the meantine having to fill buckets from my neighbour, Chantal’s, hosepipe next door.

My main concern was that due to its age, the device that had failed was corroded through and would have to be totally replaced, but when I removed the spindle that opens and closes it, I found that this wasn’t the case, as it was made of brass. What had happened was that the little rubber washer on the end of the spindle that screws down onto a face with a hole in it to shut the flow off once the air has been vented out had disintegrated due to its age and was therefore totally ineffective.

It took me a couple of tries making a replacement, first cutting a new washer out of a piece of rubber strip that I had in my workshop which reduced the leak to just a drip, and then making a better one out of a washer out of an old faulty stop-cock, before I was happy that I’d solved the problem. So wasn’t I lucky that Veolia had been so useless in their response to my emergency call (typical for the French state-owned utilities I’ve found) as if they had turned up, I’d probably have ended up arguing with them over a huge bill for a job that only required a 2 cents rubber washer and 45 minutes of my time.

So then it was back this afternoon to the making good around the last small window in my bathroom which I must confess, after my experiences with the other two, I wasn’t much looking forward to. The plaster that I’d used was flashing off so quickly that the previous jobs had been a nightmare, but as it turned out, I needn’t have worried.

In the meantime I’d bought a new back of finishing plaster from Brico Depot and this performed exactly as it should have, going off at a rate that allowed ample time to get it into place around the window frame and smoothed off. Here’s a shot of the finished job this evening – the plaster looks dark because it’s still ‘wet’ ie not fully cured, and will turn to pure white when it’s done.

null

So once again I’ve proven that it’s a dead-loss sourcing certain items locally. As I’ve found many times in the past, when I’ve needed plumbing fittings, for example, local suppliers allow the trays of fast-moving items ie the most popular, to become empty before reordering new stock so after heading off in one direction I end up going further in the opposite one to obtain what I need.

And the plaster I bought at Briconautes in Montignac was another example. It was obviously old stock that had sat on the shelf for weeks, or possibly even months, presumably because there isn’t sufficient local demand to turn the stock over. This is never the case with Brico Depot, and not only that but I ended up buying a bag there that was 50% bigger than the one I’d got from Briconautes and cost a bit less too. So no wonder they can hardly sell any of the stuff!

Cuckoo

Yes, I heard my first one of this year this morning. Really. But what about this story for why we foreigners, and especially elderly British ex-pats like me, have such problems understanding French bureaucracy.

I am now close to being able to file my own Demande de Permit de Construire for my new house, almost finished actually. I’m just waiting on the ‘Controle Thermique’ to show that the house will meet current requirements relating to energy efficiency and insulation and then I’ll be able to file it.

One of the ‘challenging’ areas is that of the materials and colours that will be used in the building’s construction. All French regions and départements have a ‘colour palette’ that relates to the available local materials and their colours together with the colours that have traditionally been used in the area for items such as window frames and shutters (‘menuiseries’). The ‘rules’ have become more relaxed in recent years in some places – like Rouffignac locally, for example – but they are still applied pretty stringently in places like Fleurac. This is because Fleurac is in an ABF (Architectes des Bâtiments de France) area and they (ABF) have a brief to safeguard French heritage and tradition in areas which are regarded as worthy of special attention.

ABF are very powerful and can reject a Demande de Permit de Construire without right to appeal, so it’s always a good idea to stick as closely to their guidelines as you can. Having had a bit of a bumpy ride to date with my new house build project (see previous posts) I naturally want to have colours which are as close to my personal choice as possible whilst sticking to the local colour palette in order to optimise the chances of my Demande de Permis de Construire being approved. I therefore went to an authoritative source, which I won’t name, to see what choices were available.

And I was incredibly disappointed. I was handed a colour chart (see below) and told that I must only choose colours from category ‘C’, which was marked on the chart by a ballpoint line.

null

The reason why I was so disappointed was that the available colour range was not only extremely limited but was also very dark and unattractive, indeed totally unsuitable for the contemporary design that I want to build. I’ll go on but first I’ll explain what the chart is all about.

The chart contains three rows and four columns. Down the left-hand side are the row names starting with ‘Façades’ (the colours for stonework, mortars and joints and renderings), ‘Menuiseries’ (the colours for woodwork, doors, windows and shutters) and ‘Ferroneries’ (the colours for ironwork, gates and fences). The columns show the colours in each tone range ranging from ‘Clair’ (light) on the left to ‘Foncé (dark) on the right and the reason for my disappointment was that all of the colours apparently available in Fleurac are at the dark end of the range.

This surprised me for two reasons. Firstly, the house builder had told me otherwise. My contact had specifically said that I could have cream woodwork (not white mind), dark red-brown shutters and a rendering (‘crepi’) with a pinkish hue to complement them, whereas this ‘authoritative source’ was seemingly telling me otherwise. Secondly, when I did my ‘survey’ of contemporary houses around the land where I intend to build my house, almost all of them had white (or cream) woodwork.

So this presented me with yet another dilemma – did I take the latest advice as gospel (even though I hated it) or did a dig deeper. I decided to do the latter, in the form of the ex-ABF gent at Rouffignac who had thrown cold water on my house design just a week or so ago. I thought that with his background he must surely be able to give me an authoritative answer, and so I popped in to see him yesterday.

And at the end of the day, lucky I did. This is how the conversation went.

Me: I have this colour chart and have been told that in Fleurac I am limited to the colours in column C

ex-ABF man: Yes

Me: So I have to choose from just these colours for my ‘enduit’ (external wall rendering) and my ‘menuiseries’?

ex-ABF man: Yes

Me: So would this also include the ‘bardage’ (the boards on which the gutter is mounted)?

ex-ABF man: Yes

Me: OK, I want to have dark red-brown shutters but what if I want to have cream painted ‘bardage’ – could I?

ex-ABF man: Yes

Me: Doh! OK, and what if I wanted my PVC double-glazed doors and windows to also be cream – could they be?

ex-ABF man: Yes

Me: Doh again! OK, I see that on the colour chart there is no pinkish colour available for my crepi ‘enduit’ – is there one?

ex-ABF man: Yes

By this time my brain was reeling somewhat as it seemed that everything that I wanted and had been told was forbidden I could actually have. At this point ex-ABF man whipped out a colour reference swatch and also a folder of ‘enduit’ colour samples labelled ‘St Astier’. I said that I thought they were very nice and asked if I could choose from them. He said that I could and in a few seconds I’d chosen colours from the swatch for my shutters (‘volets’), my gutter fascia boards (‘bardage’), and my windows and doors (‘menuiseries’), the latter three all being the same.

As I seemed to be on a winning streak, I decided to go for broke and ask about roof tile colours. ex-ABF man then whipped out another materials sheet and after sternly confirming that I did want flat tiles, didn’t I, wrote down the ‘approved’ maker’s name and product code. So I then had all of the information that I needed to complete my Demande de Permit de Construire and I was delighted, if somewhat bemused by the whole experience.

I told my French neighbour, Chantal, about it when I got back and she was as confused as I was, so it seems that it’s not just we foreigners who have problems understanding French bureaucracy – the French themselves do too. Now is that cuckoo or what… 🙂

Still trying!

Yes, my patience (and indeed my sanity…) are still being tried and this post is not just about my efforts to get things done in a timely manner but just getting things done at all, a perennial problem here in France. In my last post I mentioned the problems that I was encountering getting my new house build together and now I’ll go on to elaborate.

I found a buyer for my present house at the back-end of last year and also identified a parcel of land at Fleurac for a new-build. I quickly found a house design being offered by a large, established builder that would be a perfect fit for the land I’d found and I had my first meeting with the builder in the first week of January during which we agreed an outline budget and building programme.

The builder said that although I would be responsible for preparing and levelling the land to meet their requirements (‘terrassement’), laying on water and electricity on site and the installation of a waste water treatment system (‘assainissement’) they would deal with everything else, including obtaining a building permit (‘permis de construire’). The latter can be quite a complex process here in France due to local planning restrictions and the information that has to be provided, including plans and images of the house, specifications of materials with specific colour references etc and detailed thermal efficiency data. This is not easy for a private individual but is much more so for a builder with their own house design who can merely cut-and-paste the required information into the ‘Demande de Permis de Construire’.

I was told that the project would take about a year from that date, which I had no alternative other than to accept, but saying that if it was at all possible to bring things forward it would be a great help as I was already pretty committed to moving out of my present house within the coming three months. So it looked as though things were about to take off – except that they didn’t. My next two meetings with the builder were cancelled and in the meantime I was sent the wrong house plan and layout and also the wrong siting (‘implantation’) of the house on the land to approve, both of which I had to amend myself and return.

It wasn’t until early in March, two months later without meeting again in the meantime, that we met up on site with the builder’s surveyor to check the ‘implantation’ taking properly into account the land’s slope, soil type and other environmental factors (eg location of trees, roots etc) and it was on this occasion I was shocked to be told that the project’s completion date would now be summer 2022. This somewhat alarmed me to say the least as it meant that if I moved out of my present house in May this year as I’d originally planned to do, I’d be living in ’emergency’ accommodation for possibly up to 18 months. This presented me with a serious dilemma. Where I currently live I have no mortgage or living expenses other than the ‘taxe foncière’ and the ‘taxe d’habitation’ that all householders have to pay. If I have to rent alternative accommodation for just 12 months, even a very modest house or apartment would cost from 500€ a month and possibly more, giving a total ‘excess’ outgoings figure of at least 6000€.

I don’t find that prospect very attractive – not because I’m mean or a penny-pincher but because if I’m dishing out that sort of figure, I’d rather spend it on fixtures, fittings and furniture in the new house (eg a heat pump floor heating system would cost around that figure) and in any case, now I’m retired, money doesn’t come that easily. I started out with the idea that I’d acquire a second-hand mobile home and site it on the land until the house was complete, as many others do, and this is still my preferred option. They can be found for 2000€ or less on Le Bon Coin and can be sold on at the end of the project for about the same amount leaving just transport and siting, around 1000-1500€ as the sunk cost. I don’t much fancy spending the winter in one but needs must and I’m sure I’d get through it.

Nevertheless, I was disappointed to learn how the builder had apparently done very little in the meantime, despite having told me that they’d received outline planning approval for the house, and how the lead time had been extended by so much as a result. My main concern was that the builder had done little (nothing really) to advance the project in an administrative sense. Under French law, I’m unable to finalise the purchase of the land until I have been granted a ‘Permit de Construire’ and I can’t touch the land, let alone site a mobile home on it, until I’m the legal owner.

But even to apply for a Permit de Construire, I have to have a waste water system that’s been officially approved for the building and the land with a declaration as such from the local authority that has to be attached to the Demande de Permit de Construire. The catch was, as I’d found out but not the builder (due to my recent contact with SPANC, the authority in question who have an office in Montignac), that there is currently a high level of demand for their services and their usual 1 month turnround had become extended to 2 months or more.

So allowing a further month (assuming my Demand de Permis de Construire gets a fair wind, which usually they don’t) I surmised that I likely wouldn’t be in a position to seal the land purchase until June or July at the current rate of progress, and with a planned removal date from my present house of end May, I’d end up facing major accommodation problems. In a nutshell, I’d end up homeless with nowhere to live and with my land purchase still hanging in limbo.

I therefore decided that I needed a Plan B, which I saw as being a house design of my own with the same essential characteristics of the original design that I could show to other builders in the hope of securing a shorter lead-time and also deal with personally for administrative purposes ie the demands for the waste water system and the building permit. So this is what I started to devote my time to all the while leaving the original house project in the hands of the original builder but so I’d have an alternative to fall back on if things eventually went pear-shaped.

And this is when the ordure hit the fan in a big way. My design was similar to but different from the original builder’s design (for legal reasons if nothing else) but retained certain essential characteristics, which I won’t go into for now to save time. However, whereas the original design had apparently been given outline planning approval by a government organisation called Les Architectes des Bâtiments de France, who brood over proposed house designs and jealously guard building form, house types, materials and colours to preserve local and regional traditions, a second builder who I discussed my new design with reported back that it had been turned down and would not be permitted to be built on my particular parcel of land.

The reasons given would also have excluded the original design, so this was something of a mystery to me. Fleurac is in a semi-protected area, what the builders call an ABF area (see paragraph above) and they are used to being knocked back in such an arbitrary way, just shrug their shoulders and either get the client to build a house that they didn’t ask for and don’t want (like me) or walk away to look for another client.

I don’t want to make a big thing about it, but deference comes more easily to the French who are used to being controlled by the ‘authorities, but it’s not something that we Brits subscribe to, especially ex-pats of my generation. So while recognising that I might well have to pull the shutters down on my project, I decided to put the effort into a counter-attack action.

The respondent at Bâtiments de France wanted me to totally abandon my plan for a modern single storey house with a low-pitched roof for a design that looks just like what I’m now trying to get out of, of a simple rectangular design with a high-pitched Périgordian roof. I know that the land in question has houses on all sides of the type that I want to build so over a week-end I did my own survey using Google Earth, one of my drones and a camera.

The results were stunning. Of 16 houses built in recent years, 12 are ‘non-traditional’ in terms of design, roof style and colour ie are similar to what I want to build and of the 4 remaining ones, one was a rebuild of a ruin so can’t really be counted as a new-build. The respondent also said that my proposed design, which is in the form of a 45 degree ‘V’ was ‘too complicated’ and that I should look at either a rectangle or an ‘L’ (damn cheek – neither shape is suitable for the land in question for technical reasons) and I had great pleasure in providing pictures taken at ground level and from overhead using my drone showing a ‘traditional’ style house (an utter monstrosity we all think actually) that is currently under construction just down the road and is in the shape of a ‘V’.

I pointed all of this out when I sent my evidence to the gentleman saying at the same time that if he was intent on creating a museum of traditional house designs in Fleurac, that horse had already fled the stable. However, when presented with evidence based on facts and common-sense, French bureaucrats just dig in (it’s a face thing I think) so I knew that I had to look for another angle of attack. This was in the person of the Mayor of Fleurac who I know and doesn’t suffer fools gladly, so I took the correspondence and my papers along to the Mairie to show him.

Partially as a result of our meeting, the approval for my proposed waste water system came through in a week (compared to the originally stated 2 months), although I know the SPANC people pretty well and they had already indicated that they were dealing favourably with my request. The Maire also showed from the official papers that he is bound by in respect of planning approvals that there would be no problem obtaining a building permit for my proposed house and that I should continue with my project as it would be with his support.

When I started typing this post I had in mind a final paragraph along the lines of ‘so now the tide is turning and the waters are beginning to flow my way’, and that was indeed the case up until yesterday when I had a follow-up meeting with the (original) builder to progress the project from their side. They’ve tried to get me to sign a contract on several occasions and I’ve always demurred and will continue doing so until I have a firm budget that’s acceptable to me, an agreed timing plan and evidence that they are progressing the project in a serious way, especially in respect of the building permissions that are required.

This was supposed to be a ‘turn-key’ project but already I’ve had to move things along by securing the declaration of conformity of my planned waste water system myself. When I sent that over to them I emphasised that it was essential for them to contact and speak with the Mayor of Fleurac who was waiting for their call, so I was somewhat miffed to hear that the lady to whom I was speaking hadn’t done so.

I was also annoyed that she should then start wittering on about colour schemes and the like, which are trivial and easily decided upon once the crucial matters that I mentioned above have been resolved. But then came the bombshell that I was somehow expecting from her body language. Following our previous conversations she was proposing that the cost of the house was increasing by a massive 20,000€ due, she said, to the state of the terrain which would require an enormous amount of groundwork due to it being in a ‘red zone’ for clay.

I regard this as nonsense as their ‘surveyor’ did not carry out a detailed analysis of the terrain when he came to examine the planned ‘implantation’ of the new house. All they were using was the mandatory ‘controle’ that I had given them a copy of that was carried out by a surveyor on behalf of the seller which shows the whole of Fleurac and a huge part of the surrounding area being in a ‘red zone’ on a national chart produced by the government. It says nothing about individual parcels of land within the zone and in fact the ‘controle’ merely advised footings 1.2-1.5m in depth with other precautionary measures and nothing that would cost 18,000€ more than the figure originally estimated.

So that was when I called a halt to the meeting. This leaves me in a difficult position due to my potential ‘accommodation vulnerabilty’ which perhaps she was playing on and I think that this will be the end of the road for that builder. Luckily some others who I contacted sensing that things would go adrift have taken my putting them off very kindly and doors have been left open for me to remake contact with them. I have a fully finalised alternative design of my own to discuss with them and I have a couple of knowledgeable local contacts to call next week, one of whom is the very experienced company who took my enormous tree out and ‘terrassed’ my garden for me, who know the local land and soil intimately and will be able to tell me what to do next. They might also be available to do the groundwork for me, who knows.

I’ve now got to press on with finalising and submitting my own Demande de Permis de Construire which under the circumstances, I’d like to have in my hands before I finalise the land purchase. When I did the Demande for my planned extension, which isn’t now going ahead of course, there was a government web site available that allowed anyone to generate a thermal efficiency study free of charge. It seems that that’s now been withdrawn and you have to use the services of ‘a professional’. That’s annoying but at around 100€, it’s not too onerous. Just another aspect of the ‘closed shops’ that exist in France keeping people employed.

But at the end of it all, here I am over 2½ months down the road and with practically no progress made. And what progress there has been, I’ve achieved myself. My French neighbour, Chantal, screwed up her nose at the beginning when I originally told her about the builder and how they were behaving and it looks as though she was right. As I said right at the start of this post, just getting anything done here is incredibly difficult and getting anything done to an agreed deadline is almost impossible. Unless you do it yourself, so that’s what I’ve now got to buckle down and do – while at the same time having to do the work on my house that I said I would do (eg replacement windows, making good etc) before I hand it over at the end of June. This is like being back working full-time – and not being retired at all 😕

This is the latest, and hopefully final, version of my own house design. All of the previous versions, including the builder’s own original version, had an attached garage. However, hardly anyone down here has a garage and I’ve managed without one for 9 years. I was thinking about enlarging it so I could use it as a workshop, but what the heck, why not save the outlay, do away with it and build a separate garage/workshop if I need it? Makes more sense to me.

null

Trying times

Very trying to say the least. First, the new replacement windows that were delivered pre-Christmas but which I’ve not had the time to put in myself, mainly due to problems to do with my new house build that I’ll go on to talk about later. I eventually decided that much as I like to do things myself (because then I get the kind of job that I want), I’d have to get an ‘expert’ handyman in to do the job in order to ease the pressure on me.

Now, anyone who has fitted replacement windows knows that to do a proper job you need to take the measurements of the old windows very accurately so when the old frames have been removed, a gap of 1 cm is left all around the frames of the replacements, which are then carefully wedged in place and secured. Then the gap is filled with mastic or silicone sealant which then cures, so at the end of the day the job looks as perfect as possible with the minimum of making good to be done.

In order to achieve the latter, your work has to be very careful and accurate and with this in mind I spent a considerable amount of time and effort measuring up my old windows before ordering the replacements to exactly the required dimensions in order to achieve as perfect a job as possible. In the long run, doing so saves time and effort, as my friend Wim and I proved when we fitted my new sliding patio door.

This was far more challenging than the window replacements as not only was there a lot of wall to be knocked out but the surface left into which the frame then had to be installed was also very rough and irregular making it difficult to achieve a good end result. But we managed to do so as the following three shots show – the first two showing the sealant gap on either side inside (before making the wall good, which will cover it) and the third a typical piece of the sealant outside.

null

null

null

So fitting the replacement windows should have been something of a doddle for an ‘expert’, especially as I said to start on the three small ones in the bathroom which being smaller and lighter than those in the bedrooms should have been much less challenging.

I suppose I should have spotted the red flag when the ‘expert’ who had been recommended to me to do the job didn’t have a small electric angle grinder, essential for cutting away the masonry on each side of the three apertures after the old frames had been removed in order to get the replacements to sit deeper inside, and I had to lend him mine. However, I was astonished when I heard what sounded more like demolition coming from the bathroom and eventually I had to go and investigate what was going on.

I found that ‘demolition’ was actually very close to the mark. All my efforts in accurate measurement had been cast to the wind, but not only that, what I found was a disaster. The room looked like Raqqa after a Syrian airstrike with rubble all over the floor. The new windows had been fitted with a temporary plastic section on their bases to protect them during transportation and the ‘expert’ had used one as a pattern. However, he’d left the plastic section on when cutting the holes in the wall so he had unnecessarily removed a huge amount of masonry in order to accomodate it, in all three holes.

He’d also ripped out the window frames complete without cutting them before removing them, so as to do as little damage to the surrounding walls as possible, and the inevitable result was that not only were the holes grossly over-size for the new windows but there was also considerable damage to the surrounding plasterwork.

All in all the job was an abomination and it was no wonder that he complained about the difficulty of making secure fixings above, below and to the sides of the new windows. And not only that, he’d cut so much out of the top of the first hole that when secured, the top of the window was below the top of the aperture and special measures will eventually be needed to make the job good.

He had clearly never ever done such a job in his life before and in truth I don’t think that he was capable of doing so. Here’s what it looked like at the end of the day when he finally quit to go home. First, the two windows in the bathroom.

null

null

null

Now the third window in the toilet – exactly the same as the other two with all the same problems.

null

My original intention was to go ahead next week-end and install the replacements in the bedrooms, but I decided that there was no way that it would be possible for that to go ahead. In fact although I’ll have to pay him for what he’s done so far, the ‘expert’ has been informed that his further services will not be required.

When I think of what my plans were and how carefully I’d measured up and prepared for these replacement windows, I am actually furious. My neighbour Chantal said that I should have told him to make the work good but there was no way that I’d let him touch anything else. Making good will be down to me and in fact it’ll take me longer than if I’d done the whole job myself. If only I had done.

I detest the spray foam that incompetent handymen use to plug gaps and fill holes. When I was young I had the privilege to work during my school and university holidays with skilled tradesmen who were expert at their jobs and never had the need to ‘bodge’ anything as they always did things properly and ended up with perfect results.

I’ve never forgotten those lessons and it’s why I’m so demanding, not only of others who do things for me but also of myself, and I’ve even been known to trash what I’ve been working on and start over again. But today I had no choice and after filling the massive gaps around the windows with foam and cutting it back when it had cured sufficiently this evening, this is how things looked.

null

null

The ‘expert’ seemed to think that all one has to do is ‘bodge’ the gaps with the foam and then plaster up to the new window frames. But you can’t. You must have a flexible joint (ie mastic or silicone sealant) between the frame and the plasterwork. The reason is that the frame and the wall expand and contract at different rates and without such a joint cracks will soon develop and the new windows will begin to look very shabby.

So although any idiot can blow spray foam around the frames, cutting it back so (a) you can get sufficient depth of plaster around them and (b) a gap to take the flexible joint, takes much more time and skill. And that’s why you take the trouble to work accurately and carefully in the first place so you don’t have such problems, the total opposite to what this bozo did.

I was going to go on to talk about the problems I’m facing with my new house build but it’s getting late so I’ll leave it to my next post, when I’ll go through things in detail.