Oh NO!

Or less polite words to that effect, was my immediate reaction when I began to unpack the new water heater that I’d bought on Saturday, ready to install it today. The product itself couldn’t be seen until you began to rip the packaging off and it was only when I’d torn it down three corners and exposed the front of the unit that I could see there were several large dents in it, as the following pictures show.

null

null

My initial reaction was that I must have caused them when loading it into the back of my car off the ‘chariot’ but I went out and checked and it was obvious that there was nothing on my car that could have caused dents like this. These were ‘penetration’ dents caused by it being struck by a sharpish object and it then occurred to me that as there was only the single layer of cardboard around the heater that would provide no protection to it whatsoever, the damage was probably done while it was standing on the rack where I’d picked it up from, right next to the aisle, and someone had probably run into it with one of the large ‘chariots’ heavily laden with goods. But in any event, I decided that as I’d paid for a good’un I’d take it back, even though I’ll probably box it in later and the dents will not be visible.

I thought that while I was at it, I might as well grasp the nettle and deal with all the hassles at once. One of my cupboard doors had a visual flaw in it, as the following picture shows.

null

Now I know that oak is a natural product and that you have to expect some variation and minor flaws, but this horrible black colour in the grain of the wood stood out like a sore thumb against the other cabinets. So I thought I might as well see if I could get that changed too. I’ve also got one other potential problem, namely that the auto shut-off valve in my new toilet system seems to be leaking slightly when it has closed off the water supply. Originally it was letting so much by that the water was reaching the absolute limit of the cistern’s capacity before it was overflowing automatically into the toilet itself. Ironically, this was where I started from with the old toilet and the main reason why I’d replaced it, so I was pretty miffed about it. However, taking the valve out, disassembling it and rebuilding it seemed to have solved the problem, but I still hear a bit of dripping from time to time so the whole valve might need replacing. However, there was no time to deal with that one as well today, so after taking the door off and loading the water heater onto my trailer this time, I went over yet again to Brico Depot.

And they could not have been more helpful! They replaced the door instantly and agreed that the kitchen is of too good a quality to have such a flaw in it and then a young assistant came out to check the dents in the heater. He than made a quick phone call and passed on the message that Brico Depot would like to offer me a 50€ ‘remboursement’ if I wished to keep the heater, otherwise they would be happy to replace it. I accepted the offer of course, and once all the details had been dealt with, set off for home.

I just hope that the water heater has survived its trip to Perigueux and back, being shaken about on my trailer, without incurring any damage. I’m getting really annoyed by this constant, never-ending stream of problems that keep coming one after the other in rapid succession. It feels as though everything that can go wrong is going wrong, every time, and it’s not only trying my paitence but also becoming very wearing. But there’s nothing I can do about it, of course, apart from keep gritting my teeth and carry on. That is the British way, after all, and something that we’re very good at 😐

Quick little job today

As we had a spell of light rain today, I was thinking about seeing if I could straighten my mower blade as the grass is getting a bit long again and will soon need mowing. However, I decided to do a quick electrical job in the kitchen instead. Ever since I’ve been here, I’ve been running my fridge and freezer from an extension lead plugged into a socket across the other side of the kitchen, the one that I’ll be using for the washing machine actually, as there was no socket where they were standing. As they will be going back into the same positions, I needed to put a socket in there. As luck would have it, there is a socket in the same position on the other side of the wall in the bathroom (this is France, remember) so all I needed to do was make a hole through the wall, position a socket in the kitchen and connect the two up. Easy – so that’s what I did today, and it didn’t take long as I’d already bought the new socket and mounting box several days ago and happened to have a short length of power cable handy. Here are some (very poor) pictures showing what I did.

Plug 1

Plug 2

Plug 3

Plug 4

The wall is made from the same kind of hollow concrete blocks that I used to make my fireplace platform, rendered and plastered, so it took hardly any time at all to drill it and cut a hole for the box using a cold chisel. And it needed hardly any making good afterwards, which is one of the advantages of that type of construction. Only problem was, I did it all by eye and when I’d finished, the new socket wasn’t quite level. But never mind, it’s not worth losing sleep over and nobody except me will ever know when it’s behind the fridge and freezer 😉

Two days of nice surprises

You never know what the day has in store! My Internet searches for worktops with a depth of 65cm had thrown up only one source – Leroy Merlin. Their closest store is at Chancelade just to the north-west of Perigueux, so my plan yesterday was to drive over there in the morning to order a couple and return via Brico Depot, which is at Trelissac on the north-east fringe of the city, to pick up a few more items that I need for the kitchen. The price shown on Leroy Merlin’s web site for 3 metre long worktops in the style I wanted was 159€ each so I fully expected to have to bite the bullet and commit myself to an outlay of 318€ plus a bit more for an edge cover and an angle joint.

When I got there I came across two worktops of the correct dimensions in matt dark grey for 95€ each, in stock to take away immediately and I thought about buying them as the more exotic type that I wanted was quoted as being on a lead-time of 12-15 days. However, although this represented a hefty price saving based on my original estimates, I decided it would be a false economy as they looked very plain and bland and I decided that as I’d be looking at them for a long time, I’d end up wishing I’d spent more to get exactly what I wanted. So I then checked out the sample rack and found just what I was looking for with a subtle dark grey pattern, called ‘Metal vieilli’. I waited while the young sales lady finished dealing with a couple who obviously had no intention of buying anything and then asked if that style was in stock or only available to order. The latter turned out to be the case so I said that I’d like to order two of them. Imagine my surprise when as she typed my order into the computer the price came up as only 75€ each! It appears that in the few days since I’d done my Internet searches, Leroy Merlin had not only reduced their list price from 159€ to 92€ but they also had a ‘special offer’ running that had reduced it even further. What a nice surprise! So it turned out that I was able to order everything, including the accessories, for only 167.80€, only just a bit more than I’d been expecting to pay for just one worktop. Now that’s what I call a real result 😀

So after paying a deposit at the ‘caisse’ on the way out, I then made my way over to Brico Depot. I picked up my usual large ‘chariot’ which I began to fill up with a 150 litre ‘Steatite’ water heater, fitting kit, cutlery drawer insert, cooker hood, gas hob and stainless steel sink unit. I had been torn between a 200 litre water heater and the 150 litre. The larger one is actually cheaper because it’s more popular and they sell more of them, but the difference in size is considerable. The 200 litre is recommended for 2-4 people and the 150 litre for 2-3 and I finally decided to go for the latter, mainly because of the size difference. Even so, it’s still pretty big and when it’s hanging up on the wall, it won’t be the most attractive addition to my bathroom 😐

null

As the young lady who checked me out seemed a little bit clueless, or being rather kinder, permanently distracted, I decided I’d check the bill before I left as I’ve had experiences when lots of items have been scanned together, that some have got scanned more than once. Not only was the total number of items correct, but I was also pleased to find that the water heater had been charged at 187€ rather than its list price of 193€ and the sink unit at 44.50€ rather than 49.00€. So more nice surprises to finish my shopping trip off 🙂

The weather forecast for today hadn’t looked encouraging for flying so I’d more or less written the day off for doing anything very constructive. However, I then received a phone call from Victor who, it turned out had arrived here with Madeleine last night. They kindly invited me over for a spot of lunch, which was lovely, and then Victor and I dashed off to Castillonnes in Victor’s 2CV in case Francis, the instructor who Victor had phoned earlier, could make it to take advantage for either or both of us of a brief weather window that had presented itself. In fact nothing came of it, so after a quick beer after we got back to Victor’s house, we went off to show Victor Galinat, where (eventually…) I’ll be keeping the X-Air. I was surprised to see how beautifully trimmed the grass was, as you can see in the following pics which I took on my mobile phone, which is why they are pretty useless.

null

null

null

The first shot was taken looking over towards the area where I’ll be keeping the X-Air, where there’s an existing hangar. Victor was trying to apprehend a large hornet, of which there are many around these parts, that had infiltrated itself into the 2CV on the journey over. The next two shots are of the runway, which is 450m long on a slight down-slope. There are tall trees behind where I was standing, so as is often the case here in the Dordogne, it’s take off down the slope and land up it, no matter what the wind is doing. But at least at Galinat there’s a fair bit of runway to play with – and as you can see, beautifully manicured as well 😉

Just a bit more done

But not as much as I’d have liked! I’d left a decision about the corner unit until today, so this morning I had to make up my mind about something. I’d originally planned for the 40cm wide opening part to have a drawer to match the two adjacent units but as I have two 1/2 moon swing baskets inside it that far from make the best use of the space available, it had occurred to me that if I wanted to store stuff in the far corners where the baskets don’t reach, it would be almost impossible to reach in with a drawer above my head. The alternative was to put the drawer somewhere else, in fact it will now be close to the sink drainer where it will be very convenient as a cutlery drawer, and fit a full height door, and that’s what I decided to do.

The swing baskets are intended for use without there being a shelf in the cabinet, but I decided that I’d like to retain mine to give me surfaces at two levels in the corners where the baskets can’t reach, to store stuff on. It needed a little bit of tweeking to clear the pivot point of the upper basket but looked fine once I’d finished. And when I’d fitted the door, I knew that I’d done the right thing, as the following picture shows.

null

As you can see in the pics, as I don’t have any worktops yet, I’ve used cartons containing units I don’t need yet as temporary replacements and to keep dust out of the units that I’ve installed. This means that I can use them if I’m careful, which is convenient, and I’ve already taken the opportunity to fill up the storage space that they provide. Sheer luxury compared to having my stuff standing out in the open as it was 🙂

After casting my net as widely as I can, it appears that the only place where I can easily source worktops from that are 65cm deep is Leroy Merlin in Perigueux. I haven’t visited their branch yet but their web site shows that they will be subject to an order delay of 12-15 days. This is going to cause me a few problems. I can’t install a sink or cooker hob without a worktop so I’m going to be rather stuck until the ones I order eventually arrive. The up-side is that while I’m waiting, I’ll be able to get the X-Air’s wings rigged and as all of the fields are now being mown for hay, the timing could be about right if I want to take off when the aircraft is ready from the field opposite my house. The down-side is that I need to take out the old gas water heater on my kitchen wall and fit a new Steatite electric heater on the wall in my bathroom. It would be nice to be able to smash out the old sink and do all of the plumbing at the same time, but as this now won’t be possible, I’ll have to plan for a kind of ‘half-way-house’ arrangement that connects the new heater while leaving the old pipework in place. Inconvenient, and yet-again a bit time-consuming, but not impossible to do 😉

Just a quick comment to finish off with. Whoever put in the existing pipework made provision for a dishwasher in the form of a water supply and adjacent electric socket. I’m re-using the socket for my washing machine which, in the French way, is currently in my bathroom, as I don’t intend to have a dishwasher. They send too many chemicals into your ‘fosse septique’ (septic tank) and use too much water in any case, so I’m moving my washing machine into the kitchen, which will be more convenient and also free up the corner of the bathroom where I’ll be mounting the new electric water heater. The water supply in the kitchen is just a pipe ‘teed-off’ from the cold water supply and ever since I’ve been here it has had a small damp patch underneath it. So it’s leaking a bit, not enough to be able to see, but enough to show on the floor, so I’ll have to replace it when I re-do the plumbing. I’ve noticed that since I’ve started work on the kitchen, the damp patch has been getting bigger. I just hope that the pipe holds long enough for me to get the work done and I don’t wake up one morning to find the house awash. That would be ironic now I’m doing the work as it must have been like it for donkey’s years 😐

Now for phase 2

What glorious weather we had today. Today I’d set myself the target of finishing fitting the second of the two units down the side wall of my kitchen, so I didn’t have the spare time to be out in the sun, except when I was outside working on my Workmate bench. But it was hotter than yesterday and one of the weather web sites I use gives an observed high temperature today for Plazac of 29 degrees Celsius, which I can well believe. I had to pick up a small sheet of white melamine to make my in-fill panel out of, a length of timber and some screws from Les Briconautes and as soon as I got them I pressed on.

I started off making a few mistakes that wasted time more than anything else, but despite them the end in-fill panel turned out pretty well and by the early evening, the final unit was securely installed and ready for its trim to be fitted. I stopped briefly for a quick snack and a long cold drink before making up and installing its drawer, fitting its door and adding the oak side panel and the pic below shows the job at the end of the day.

null

So these three units are now ready to have their worktop fitted and then I can start using them if I want to. The only problem with that will be the amount of dust that the next stage of the job will create, when I bash out the old sink and take the gas heater off the wall, but I’ve got stuff stored in the open in the kitchen at the moment, so in comparison having the units will be an improvement. The only feature that I’m disappointed with at present are the plinths along the base of each unit. They are held in place with soppy little plastic clips and I think I will end up making my own ones that will be ‘all-in one’ where possible and joined together as well. Shouldn’t be too hard and it will improve the appearance of the whole kitchen no end I think. But that will be at the very end of the job. Now I’ve got phase 2 to think about, which will take me onto the main wall of the kitchen and as well as the units I’ve chosen, will also involve fitting the electric oven, gas hob, washing machine and sink. All good meaty stuff, which I like. I can hardly wait to get cracking 🙂

Slow but steady

We had a really lovely day today, possibly a little too windy to fly if I’d been able to, but with a gorgeous blue sky and wall-to-wall sunshine. But I had to continue with my kitchen work, so couldn’t take very much advantage of it, although I did manage a half hour or so in the garden after I’d had my lunch. It was pretty hot and I know I caught some more sun even in the short time I was outside. I went to the shop at 6.45pm and my car temperature gauge showed that it was still 25 degrees Celsius then, so it must have been quite a bit warmer than that mid-afternoon.

Kitchen progress has been a bit slower than I’d hoped for a couple of reasons. The assembly instructions that come with each item are not as clear as they might be which makes the first time for anything quite slow. After that, things speed up but I’m only just coming towards the end of all the ‘firsts’! Secondly, because my house is quite old, the walls and floors are not that true, so I find myself constantly adjusting and tweeking to get the kind of finished job that I want. This is the main advantage of doing things yourself, of course, because a contractor could never put in the hours that I am. This means that you’d either end up with things being done their way rather than yours or, in the worst case, a bit of a bodge-up where they’ve cut corners to get around the problems that arise as the job proceeds.

As I explained in my previous post, I decided not to bother making the wall good behind the corner cabinet but instead to cover the electric cable tubes with a plywood cover. This is how it came out. I took the picture while the emulsion was drying and it ended up looking a bit tidier than it appears, not that appearance was that important as it’s hidden behind the corner unit.

null

So the first job today was fixing the junction boxes to the wall after which I then re-ran the cable for the cooker and fitted a new power point to the end of it. It all went to plan and then I was finally able to complete the permanent installation of the corner unit followed by the adjoining 40cm unit. It was all of the tweeking involved in this that took the time today, but I just had to be patient, because getting this corner right will I think be the trickiest part of the whole job. I placed the last 60cm unit into position next to the 40cm one, but there wasn’t going to be enough time to fit it because I’ve got to make an in-fill panel between its end and the wall. So instead I thought I’d make up a drawer and door for the 40cm unit so I know what’s involved for all of the others. Here’s how the finished articles looked at the end of it.

null

The ‘facades’ are solid American oak and the doors and drawers are all the ‘soft-n’-silent’ close variety. I like the look very much and if things keep going as they are, I hope to eventually end up with a very attractive kitchen that nicely suits the character of the house. But there’s still a long way to go, and we’ll see what we will see at the end of it 😉

More on weather weirdness

A few days ago I did a post about the weird weather we’re experiencing in south-west France. I hadn’t realised how far it extended until I read an article this morning on the BBC News web site. Here are a few extracts from it.

Thousands flee as central Europe flood waters rise

Emergency operations are under way in Austria, Germany and the Czech Republic to deal with record levels of flooding in some places.

Landslides and flooding have led to the deaths of at least four people. At least eight people are missing.

In Germany, more than 7,000 people have been moved from their homes in the town of Eilenburg, reports say.

The Czech capital, Prague, is on high alert amid fears that floodwater could swamp its historic centre.

More than 2,500 people have been forced to leave their homes in the capital and the surrounding region, Radio Prague reports. Animals from Prague’s zoo have also been moved.

Underground stations have been closed and schools shut as Prague officials wait and see whether the Vltava River will flood its banks.

Disaster zone

Main roads in many areas of central Europe have been closed and rail services cut. In some areas, electricity has been turned off as a precaution.

Outside Prague, two people were killed and four reported missing when a house collapsed. The body of a man in his 50s was found close to swollen river waters north-east of Prague and two people are missing after their raft overturned south-west of the capital.

In Austria, the meteorological service said two months of rain had fallen in just two days.

A man was found dead near Salzburg after being swept away as he worked to clear a landslip, and three further people are missing.

More than 300 people were moved from their homes in Salzburg and the neighbouring Tyrol as the army worked with the civil authorities to clear landslides and make roads passable.

Floods have swamped parts of the Passau in Bavaria. Parts of the Pinzgau region, which includes Taxenbach, have been declared a disaster zone.

In Germany, Bavaria’s flood alert service has warned that the forecast of continuing heavy rain is likely to worsen the flooding affecting the Danube and the Inn, among other rivers in the area.

The German cities of Passau and Rosenheim have declared a state of emergency.

Authorities in Passau, which lies at the confluence of three rivers in Bavaria, said waters could rise above the record levels of 2002.

Towns and cities in Saxony, Thuringia and Baden-Wuerttemberg have also been inundated by flooding, and the army has been deployed to help with the emergency effort.

In northern Saxony, water levels on the River Mulde were said to be particularly high.

A large area of Eilenburg north-east of Leipzig was evacuated, reports said, with 7,000 people being taken to emergency shelters.

This is a really extraordinary situation. Can it all just be down to the move south of the Jetstream that I mentioned in my earlier post or can all of the events, including the move south of the Jetstream, be due to something else that we have yet to understand? Is it just coincidence that the picture I included in my post showed the Jetstream positioned to the south of all of the countries affected? I have no answer to these questions, but these catastrophic events in central Europe make our cold and wet experiences here in the Dordogne pale into insignificance in comparison and I have nothing but sympathy for the large numbers of people in several countries who have been affected by them. I sincerely hope that things improve soon and that they are able to recover and get their lives back on track again.

Coming on slowly

I’m moving steadily forward with my kitchen, not as fast as I’d like to, but things will speed up as from now. I knew that I’d be unable to do anything much until I’d made the corner good so I could start to press ahead with getting the floor units installed, but the mortar would have to have time to cure so I could secure the cable junction boxes for the washing machine and oven and the corner unit itself. I’d hoped to get the making good done yesterday but I had a very long wait at Brico Depot to exchange two ‘facades’ (cupboard doors) that were incorrect and by the time I’d got home, it was too late to start. So that was today’s job.

I mentioned in my previous post that the angle between the walls is greater than 90 degrees, and how I’ve got around it is shown in the following pic.

null

The back edge of the corner unit has had to be pushed back into the wall which was not a problem after cutting away at the hump in the corner. The main problem with having an angle greater than 90 degrees is that it effectively moves the junction strip on the side of the corner unit for the unit that butts up against it and which should be at 90 degrees to it, away from the wall that the latter should be up against. So the adjoining 40cm and 60cm units will be standing a few centimetres off the wall that they should be up tight against. I’ve calculated that this will not be too serious though, because although the units along the main wall will have a worktop 60cm in depth the units standing away from the wall will just need a worktop of depth 63cm and an infill panel at the end to fill the gap. So no problem 🙂

Here’s how the kitchen corner looked after I’d made it good using plain mortar. It was a bit fiddly because of the limited space that there was to work in and the hanging cables and junction boxes that kept getting in the way, but I’m happy with it.

null

I’ve decided not to bury the electric cable tubes again because there’s no need to. They’ll be behind the corner unit and the corner will be boxed in above the worktop in any case. So all I’ll do when I re-secure the electrical junction boxes is make up a plywood cover for the tubes, which I’ll fix to the wall with screws. Anybody in the future who then rips the kitchen out (hopefully long after I’m gone!) will then not have the problem I was faced with and know immediately that the cables are there.

I can’t do much more today. I pushed the corner unit into position before the mortar cures so I know it will fit properly. Now I’ll just put together another couple of floor units after I’ve had another cup of tea and hopefully I’ll be able to make much quicker progress tomorrow and in the days to come.

By the way – although this weekend’s weather was generally pretty good, I don’t think that I missed much of an opportunity to fly through working indoors on the kitchen and not being able to get out to Castillonnes. The reason was the northerly winds that we’re still being plagued with, which I think would probably have been a bit too strong and gusting for microlights. I hope to ‘break the back’ of the kitchen work this week, during which temperatures could get to over 30 degrees Celsius, and then be able to get some flying in next weekend. However, at the time of writing, it already looks as though this plan could be de-railed because as so often with the high temperatures, we could end up with thunderstorms by, yes you’ve guessed it, Saturday and Sunday 😐

Besieged from all sides

Is how I’ve felt today. The day started off dull with light drizzle but then it got serious, since when the rain has been pelting down non-stop. The river outside my back door is back again, so I need to put a proper path in as soon as possible. But I can’t, even though I got myself a concrete mixer a few months ago in readiness, because now I need to get the kitchen done.

Because of the volume of rain we’ve had today, water has once again been dripping down the chimney onto my new fireplace. So I really need to get the wood-burner installed and the chimney capping tile back on again to keep it out, but I can’t because I have to get the kitchen done!

It’s been murder with Toddie today because he has to go out a lot these days on account of his age. And every time he’s needed to today, just as in every other day recently, he’s come back in sopping wet bringing half of the garden with him, which as well as drying him off, I then have to clean up. So it’s been a trying day today to say the least, and that’s without even thinking about the X-Air that’s still standing outside in the pouring rain 😐

But despite everything, I’ve pressed on as planned with my kitchen work. Today I needed to deal with the large hump in the wall in the left hand corner and prove that the corner units could be placed exactly as I need them to be. Having done that, I could then be fairly confident, despite the alignment of the walls being a bit rough and ready, that the rest of the fit would proceed without too many problems. The first job was to carefully take a club hammer and bolster to the hump to find out what was underneath it. It didn’t take long to find out that it hid a large bunch of plastic corrugated tubes containing electrical cabling, which should not have been a surprise as it was located right below the fuse box. After carefully chipping the surface back, here’s what I was presented with.

null

Tubes like this are more or less universally used in French buildings to carry the electric cables and I didn’t want to disturb them too much. I also didn’t want to have an accident so as well as wearing rubber soled shoes, I also put on a pair of thick rubber gloves. After carefully removing material from the corner and the back wall I achieved what I had been hoping for, namely that the corner cabinet fitted in just as it had to to get the correct alignment along the main wall with the other units I’ll be installing, and with the two units fitted against the side wall. Here’s how they looked when I’d placed them roughly where they’ll be going.

null

This part of the job isn’t yet quite completed. The angle between the walls is great than 90 degrees but I’ve worked out that this doesn’t matter so long as I can get the angle between the corner unit and the first 40cm side unit large enough. To do that I’ve still got to trim a bit off the back corner of the latter which I’ll probably do later this evening. Then the side units will have to stand off the wall a bit because of the geometry, but I’ve already worked out that this will be OK if I fit a 60cm deep worktop on the units along the main wall and a 65cm one along the side units. I’ll then have to fit a blanking panel between the back of the 60cm side unit and the wall to fill the resulting gap, but this shouldn’t present any problems.

I made up for all of today’s hassles by cooking myself a nice steak, which I’ve had for a while in my freezer. Because I still don’t have a microwave, I had to cook it from frozen and as I don’t have a proper cooker, I did that in a covered frying pan with some oil and spices. I had to be careful as I’d started it from frozen but it ended up deliciously medium rare 🙂

I teamed it up with some frozen vegetables, Poêlée Champêtre from the range by St Eloi, which I’ve found to be delicious and with flavours only the French seem able to achieve. I also had to cook those slowly in a saucepan but the wait was well worth it. After enjoying the meal with a glass of French beer, I can say that I then didn’t feel quite as besieged as I had done earlier 😉

Weather weirdness

There seems little doubt from what people who have lived for some time in the Dordogne are saying that the weather we’re getting at the moment is pretty unusual and a bit weird. It’s much colder than it usually is at this time of the year and I remember when I arrived about a year ago thinking how nice it was having come from a cool, damp UK to experience the pleasantly warm days and nights. This week, a year on, we’re getting highs up to just 15 degrees Celsius and lows down at 8 degrees when the averages for this time of year are around 23 degrees and 12 degrees. Plus we’re getting day after day of constant showers or even continuous periods of heavy rain, so something does seem to be going on.

In my opinion, it looks as though it’s got a lot to do with the Jetstream, the very fast, high level winds that push weather systems west to east across the Atlantic. The very poor cool, wet summers that the UK has experienced in recent years have been explained by some experts as being due to the Jetstream having moved much further south than it usually does, dragging ‘arctic’ weather south over the UK. In ‘normal’ summers, the Jetstream is located to the north of Scotland allowing warm ‘maritime’ weather to come up from the south but with the Jetstream having moved to the south of the UK, there was a barrier to this happening. And the theory seems to have some truth to it, because the Jetstream has on average remained in that position for some time now during which the UK has experienced ongoing periods of colder than average weather and greatly increased rainfall.

If this is true and there is such a link, the news for us further south in France is not good. As if it was not bad enough having the Jetstream positioned to the south of the UK, now the situation seems to be even worse, as it has moved even further south, below the South of France and over the Mediterranean. This is shown very clearly in the following pic taken from the Metcheck.com web site

null

If it stays like this, and there is no obvious reason why it should revert to its ‘normal’ position as it’s now been out of kilter for so long, the prospects for the weather here in the Dordogne do not look good. The weather that we’ve been getting, with its ‘arctic’ influences of northerly winds, much lower than usual temperatures and above average rainfall could well continue indefinitely, just as it has in the UK. Surely it can be no coincidence that despite being several hundred miles further south, the Dordogne, while it is clasped with the UK in the python-like embrace of the Jetstream snaking to its south, is experiencing almost identical weather and temperatures. I could be wrong, but I’m not optimistic given the image above that things are going to improve for us here in the very near future. We seem to have had seven months of almost continuous winter. How much longer is it to the longest day after which the sun will begin its trek south again? Not long… 😐

Cuisinary developments

I’m expecting family visitors in a few weeks time, my mother who’s 94 tomorrow (Happy Birthday Mum!), together with my sister and my brother-in-law, and I’ve decided that there’s no way that we’ll all be able to live in a reasonably civilised manner for the week or two that they’re here without some kind of proper kitchen. I really wanted to get the wood-burner install finished before I started on the kitchen because I keep starting new jobs without finishing the ones I’ve already got underway but I think that I have no choice with this one. The reason is because I’m still making do with a camping kitchen and double-burner stove and a couple of camping tables but there’s no way, even if the weather is lovely and we eat out a lot and outdoors if we’re eating at home, that such an arrangement will be suitable for the four of us. And it’s lucky that I installed the new toilet when I did, otherwise I’d have had that problem as well 🙂

So I’ve decided that although I’d ideally like to deal with the kitchen ceiling before installing any kitchen units, because I know it’ll be a horrible dirty job, I’ll have to do that later and at least get all of the base units in. As luck would have it, last week the regular leaflet announcing the latest ‘Arrivages’ and special offers at Brico Depot arrived and it included details of a special offer on kitchens, so I went over there on Saturday and bust the bank by buying all of the kitchen units I need while they’re on offer. In fact I was able to get hold of a higher price kitchen than I’d originally planned for, for less than I was originally going to spend, so at least that was a result. In fact I’ve been back again after checking what I’d been supplied with to correct their and my errors and get some more units and I’ll be returning again soon to change one cupboard door for a door/drawer combination and pick up the accessories and worktops that I’ve chosen.

I’m going for a traditional French kitchen design in real solid oak which I think will suit the style of the house perfectly and I think the extra investment in solid wood rather than chipboard will be worth it in the long run. I’ve got my reservations about the handles that come with it, though, and as the doors and drawer fronts haven’t been drilled, I might see what options I’ve got to replace them with something I like more. The handles on my original choice kitchen were much nicer but unfortunately there’s no option but to accept the ones that are originally supplied with each style of kitchen, which is a bit of a shame, I think.

Here’s a picture showing the layout I’ve designed for the main wall. There’s no window in it sadly and although it might be possible to put one in (remember the walls of my house are nearly 3 feet thick) I think it would be too big a job to take on just now.

null

The kitchen walls are way out of square and the left hand corner has a great big bulge in it, electric wires running down it as well and it’s also where the water pipes pass through the wall into the bathroom. However, I’m pretty certain that all of these will not present too many problems because of the amount of space the standard worktops leave behind the cabinets to allow for services, that there is to play with.

Here’s a pic of the heap of flat-packs that I’ve got to assemble into full units and this was after I’d already assembled the corner unit and the two cabinets on the left hand side in the picture above.

null

And finally, here are the corner unit and the two left hand cabinets, not in position but just standing in the middle of my kitchen floor, where I assembled them. And yes, that is my new wood-burner behind them, still standing in my kitchen waiting to be installed into my new fireplace since January 😐

null

At the moment, I’m using the ramshackle old wall-mounted gas heater that was here when I moved in, for hot water. It’s old and not very efficient and never got the water above luke-warm when the supply was very cold in the winter. Its flue also discharges straight into the kitchen and as well as not being safe, it’s also now making the ceiling above it black and sooty. But there must be many thousands more just like it in rural France! I’ll be installing a 200 litre electric water heater on the wall in the corner of my bathroom. I’d prefer to have it in the kitchen but there’s just no way it can be accommodated, so I have no choice. I’m hoping to be able to box it in in the form of a ceiling high cupboard because that will keep the steam away from it and also give me some tall storage, which I’d otherwise be lacking, for things like my ironing board. The heater won’t be the usual immersion type but will instead be of Steatite design, which is very popular here in France. It’s a bit more expensive but much more efficient and therefore cheaper to run, which’ll be just as well given the whacking great EDF bill that I’ve just received for using my electric heaters over the past few months 🙁

Ca marche!

Yup, it works! The sun shone today so I was straight out into the garden after lunch to sort out the last bit of wiring work on the X-Air that I wasn’t able to finish last Friday, due to the thunderstorm. Because of the delay, I couldn’t remember how I’d connected up the two pairs of wires that I’d run down to the panel from the senders to the EGT gauge and had to cut some cable ties so I could find out. After replacing them and adding several more on the front down-tube to secure the cables etc running down to the back of the panel and then making the connections to the gauge, I was ready to go.

As usual, the engine started very easily and all of the gauges worked as they should except for the EGT gauge. I stopped the engine and switched the connections for one sender pair round and was pleased to see one of the needles jump up the gauge and start falling slowly as the engine cooled down. Obviously I’d connected the pair the wrong way round – just luck as there’s no way to know which way round they should go. When I went to switch the other pair round, one of the connectors pulled off and by the time I’d replaced it, the engine was too cool for either EGT sender to register. I started the engine up again and was then delighted to see both needles starting to climb, so both pairs had been connected the wrong way round – what’s the chance of that happening, as Harry Hill might say… But best of all, the fact that there were no obvious exhaust leaks and the gauge was working as it should showed that my arrangement for mounting the senders into the exhaust manifold stubs is effective. The fuel pressure gauge was also working fine, and when I revved the engine up to about 6000 RPM it showed a healthy pressure of around 0.3 bar or more, which is correct.

The plastic tube connecting MYRO’s ASI and pitot tube was run from the gauge under the panel, up the front down tube and into the wing, then out again and down inside one of the jury struts at the bottom of which it finally emerged to be connected to the pitot. It was a nice neat arrangement when done, but fiddly to connect up. I suppose the same thing could be done for the X-Air. In fact, because it was de-rigged more frequently than MYRO, the tube comes out from under the X-Air’s panel into the cabin, down a tube on the left hand side, straight out of the pilot’s door and up the front strut to a different sort of pitot entirely to what’s permitted for the X-Air in the UK. The arrangement is simple and as it works, I’ve decided to keep it, so the last job this afternoon was connecting the tube, running it down as far as the door and cable-tying it. And that was that! It means that I’ve finished the modifications that I wanted to make and if the wings were fitted and rigged, the X-Air could now be flow. It’s taken much longer than I expected it would, solely because of the weather we’ve had in recent months, and there are small things still to be done, like changing visually unattractive corroded nuts and bolts, but they can be ongoing while the aircraft is being flown. The last major thing I want to do before turning to the wings and re-rigging is re-varnish the wooden prop. I’ve had a can of clear varnish ready for several weeks and I’ll be very pleased when I’m able to do it, hopefully later this week.

One thing, however, has taken the shine off the day. I’ve just got my latest EDF bill, which is huge. One of the reasons for this is that they have applied quite a significant charge for converting the dangerous 400V 3-phase electrical supply in my home that almost resulted in the house burning down and could have proven fatal if I’d received a shock from a plug or an appliance that had been damaged, over to the usual safe 220V single phase. I’m not prepared to pay it so I foresee being locked in a dispute with them yet again. EDF is a dinosaur and is the worst example I’ve ever come across of what happens when a public sector monolith has no competition and thinks it can do what it likes. I came over to France for what I’d hoped would be a quiet and fulfilling retirement but EDF has been the single fly in the ointment. So yet again it appears that I have no choice but to waste more of my time doing battle with them. There’s a good side to France and the French people which I love, but there’s a negative side as well, and EDF in my view is one of the very worst examples of it 😐

Stir crazy

That’s what Toddie and I are beginning to feel like with the weather we’re getting. I don’t know if this is the worst Spring and early Summer ever in these parts because I haven’t been here long enough, but I wouldn’t be at all surprised! I’ve just come back in from having re-secured one of the X-Air’s engine covers which had been blown off by the gusting wind allowing the exhaust and part of the engine to be soaked by the falling rain and as I look out of my window now, another shower is passing through just as there was for the whole of yesterday. And it’s cold, at only 11 degrees Celsius, with a high of only 16 degrees expected. So we’re stuck indoors again, just as we were for the whole of yesterday and much of last week. And with little to amuse ourselves with, as after the EDF 400 volts debacle, I still don’t have a TV or DVD player or even a music system and am totally reliant on my PC to help me stay sane while the rain falls almost continuously outside and water steadily drips down my chimney. But sitting in front of a computer screen all day begins to pall after a while 😐

The sun came out briefly on Friday so I took the opportunity to get outside ASAP to try to finish off the X-Air panel work. I connected the fuel pressure gauge into the system and it worked nicely when I pumped up pressure with the hand primer bulb but I didn’t get a chance to start the engine and see what pressure it showed with the engine running. Instead I set about fitting the EGT senders. The first thing I found was that the stubs on the exhaust manifold do not after all, match the clamp-on senders that I bought recently. The stubs do not support them and they pass completely through them, right into the exhaust pipe. But I refused to give in and fitted the senders anyway by slipping a couple of washers over the sender bodies to prevent them going in too far and attaching the jubilee clip clamps very tightly so as to prevent any leakage between the faces of the washers and the ends of the stubs. I won’t know if the arrangement will be successful until I’m able to start the engine, which I was unable to do on Friday as I’ll go on to explain.

Then I needed to connect the EGT senders to the gauge using the connections that I made up at the gauge end what is now several weeks ago, a mark of how much wasted time this terrible weather is causing. I decided that I’d pop down to Les Briconautes in Montignac to see if they had any suitable cable and came back with some light-weight 2-pair telephone cable. On the way back I thought that the sky was looking a bit ‘unreal’ over the hills to the east and while I was running the new cable to make the EGT sender connections there was an ominous rumble of thunder. So just in case, I gathered up the tools that I wasn’t using and put them under cover and continued for several more minutes before the deluge hit! With the job only half-completed, I then had to rush around to get the X-Air covered up as quickly as possible, getting soaked in the process, and ended up back indoors looking out at the lashing rain and flashes of lightning that continued well into the evening. So that was that, and no more work has been possible since, because of the continuing downpours we’ve been experiencing.

On a different note, many weeks ago after we’d been out to the airfield at Castillonnes in it, I mentioned Victor’s beautiful restored Citroen 2CV, or Deuche as it’s known. We went out to the airfield in it again at the end of April and although I didn’t have my camera with me, I did have my mobile phone, which has a not very good camera in it. So this time I was able to get a few shots, and here are a couple.

null

null

Victor has restored it with ‘no expense spared’ and it looks as though it’s just come out of the showroom. It also has a ‘tuned up’ engine, from a Visa I think, and nips along very smartly, much to the surprise of other motorists! I’d love one like it, and it looks as though you can pick up some very nice models with a current CT, meaning that they’re road-worthy and can be driven immediately, for under 2000€. But I think it’ll be some time before I’ve done everything I need to on my house and garden before I could even think about taking on a project like that. But I can dream, can’t I 😉

Blast!

In the end, I decided against disturbing my neighbours with my lawnmower on Wednesday and Thursday, the two holidays, and as we all celebrated Victor’s birthday on Friday morning with coffee and chocolate cake – Many Happy Returns Victor! – I didn’t get around to mowing my grass until yesterday. My original intention was to do the back and leave the front until today, but as the forecast was for showers today, I decided to press on and do the lot. I’d finished but then noticed that I’d forgotten a small strip of rough ground along the front of my house and, unwisely as it turned out, thought I’d just trim off some long grass on a stony patch. In doing so, I was a bit careless and clobbered the mower blade on a lump of rock that was half-in and half-out of the ground. Now the end of the blade is badly bent and although I’ll try bending it back into some sort of shape when I get around to removing it, I think I’ll probably end up having to buy a new one. Stupid – and totally unnecessary 🙁

Changing the subject, I’m amazed by how long the awful weather is going on for. We’re expecting a high of 22 degrees Celsius on Tuesday but it’ll be back as low as 11 degrees again on Thursday! And as well as the low temperatures, we’ll also be getting rain on and off throughout most of the week. There was no flying yet again this past week-end, just because of the weather. I have to say, I didn’t expect this at all. I’d thought that with the exception of two or three Winter months, we’d be getting a lot more nice, flyable days down here, and certainly many more than we have done. Wim has only managed to fly his aircraft on a very small number of days in recent weeks and the X-Air, which I’ve had since last September still looks no closer to coming out from under its covers now than when I first unloaded it off the trailer and put it in my back garden. Here we are half-way through May and I’ve not even managed a single flight towards getting my French licence, when at the time I first discussed it with the Instructor at Castillonnes, we said we’d leave it until the New Year and try to knock it off in January! Surely something has to give soon 😐

Only good news today

I was wrong about there still being a leak on my new toilet. I flushed it several times yesterday evening and it appeared to stay dry so I left it and went to bed. The water level hadn’t dropped this morning and it was still dry, so I flushed it again a few more times. Still dry, so that’s it. All I have to do now is complete the fixing of the plywood I’ve used in the boxing, make a top cover and give the whole lot a couple of coats of white emulsion. That’ll do it until I eventually get around to doing the bathroom and tiling it and the toilet. So that was very welcome news today.

Victor also kindly lent me a couple of those long pick-up tools, one with a magnet on the end and the other with the four little claws that are operated by a button on the top. All it needed was 30 seconds with the magnet version to recover my dropped spanner which I’d managed to knock sideways earlier on with a piece of wood to get it into a more accessible position. So that was another problem solved!

Today and tomorrow are holidays in France and although shops etc will be opening tomorrow, today things are closed. So now I really must get out into the garden and start attacking the grass and weeds with my mower before they get totally out of control and more difficult to chop down than they already are. Still, at least it’s good exercise 😉

Good news, bad news

Good news – at last after waiting and arguing for over two weeks, I’ve received a label to return GrosBill’s wrong black microwave at their cost! The bad news though, is that I still haven’t got my money back from them and there’s no guarantee that even when they’ve got the ruddy thing back, they’ll then do a quick refund. I’ve given up hope of ever getting the right model from them, I have to say 😐

Good news – I’ve got my new toilet installed and flushing water just as it should! The bad news however, is that there’s a leak from somewhere underneath, where you can’t see, so I still can’t use it until I’ve located the problem and rectified it 🙁

One of the things that I will be eternally grateful to my old Dad for is that while I was in the Sixth Form he refused to pay me any pocket money or any parental support either, to top up my grant while I was at University. What he said he’d do, though, was help me get jobs to earn good money in my holidays, and that’s exactly what he did. My Dad was a surveyor and a very good one too, working in the public sector, so he had some excellent contacts with lots of top contractors. And so there was I, a ‘college boy’, getting stuck in and getting my hands dirty with a plumbing contractor for almost three years and a building contractor for another three. And these were some of the best times of my life. Initially the guys I was working with were a bit suspicious of me because they knew who my father was, but when they saw that I was ready to muck in and do whatever I was asked to, that soon vanished and not only did I have some great times working with some really genuine and skilled people who I had great respect for, I also learnt skills of my own that have stood me in good stead for the rest of my life.

Over the years I’ve been able to do all my own plumbing and building work, with the help of my Dad while he was alive and my brother-in-law who was a skilled plumber until he went into the office. This has included some pretty complex projects, all of which I was able to work my way through to a successful conclusion. However, I have to say that fitting this ‘WC Suspendu’ has been one of the worst and least enjoyable that I’ve ever done. The kit itself came with no instructions other than a couple of flimsy sheets of paper with some hand-drawn illustrations on them. There were some rough dimensions shown on the box that it came in but no detailed measurements to work to, so everything had to be precisely measured by hand and/or calculated from two or more measurements. Despite that fact that holes for the water inlet and the support bolts are in fixed locations, there was no template to work with and again, the positions had to be measured as closely as possible, together with the hole for the outlet pipe, and adjusted a bit at a time until they were right, which was both tedious and time-consuming. And to top it all, a pre-welded support bracket and some pre-drilled holes were in the wrong places. Generally speaking, the overall quality of the kit left an awful lot to be desired.

Then we come to the plumbing fittings. I like to use capillary (soldered) connections on a job like this where access is impossible after the job is completed. The joints are permanent and there’s no chance of a leak developing that would end up ruining your whole day. However, you can’t get soldered fittings in France which have the solder pre-loaded inside the joint. What? Yes, amazing but true. That’s why all the soldered joints you see in France have great gobs of solder on them or solder running down the tube away from the joint, something guys were fired for by the old plumbing contractor I worked for all those years ago. So I’ve had to use screw/cone fittings which seem to be of very variable quality here in France. Only after buying a new stop-cock did I find that it didn’t even have proper cones, but instead had an even cheaper arrangement involving weird metal spring washers combined with rubber washers, which must eventually harden up and start leaking I’d have thought. And then, after I’d got the water inlet pipe plumbed in and turned the water supply on, I found that the gland nut on the top of the stop-cock hadn’t been tightened and was highly delighted to have water spraying out like a fountain before I heard the noise from the kitchen, dashed in to find what was causing it and switched the supply back off again. And then to top it off, because the gland nut was difficult to get a spanner on, I managed to drop it down into the now-boxed-in cavity behind the toilet, so I was very pleased with the overall outcome, as you can imagine 😐

Anyway, here are a couple of pics just taken showing the latter stages of the project. The wood boxing in the second shot has had a coat of white emulsion to match the walls and that’s how I intend to leave it until I can do the bathroom and re-tile the lot.

null

null

So where am I now? Well, I’ve already removed and re-fitted the toilet once in the hope of fixing the leak and although the initial signs were encouraging, I think there’s still some slight dampness underneath the ‘cuvette’ (toilet pan). If so, I can’t leave it, because if it’s from the outlet, that’s what known in the trade as ‘foul water’. Why it should be leaking I don’t know – I can’t imagine that it’s because I’ve cut the outlet pipe half a centimetre too short, but it might be. If so, what a poor design it is, that it should depend on such a high level of accuracy. My next step will be to try the old tried-and-tested method that can only be used where it can’t be seen – get hold of some good quality waterproof mastic and smear both parts of the suspect joint with it after ensuring that they are perfectly dry and clean. Then make the joint and leave it for a day to allow the surfaces of the mastic to cure enough to make a waterproof seal – not difficult when the joint is not subjected to any pressure. And then I’ll have to just keep my fingers crossed, not using the toilet, of course, in the meantime. And that would be more bad news, although it’s something I’m getting quite used to after the last week or so 😕

Footnote – the final pic above was taken after I’d confirmed that the leak had been fixed and the job completed, prior to tiling at some time in the future.

Struggling on

And in more ways than one! I’ve moved on as quickly as I could, but I’m still without a toilet. I’ve had to go one step at a time with the work and have only lost a day due to the tile adhesive not drying as quickly as it should have done and having to leave it for a further 24 hours, but it’ll still be another few days before I’m finished. But I’ll come back to that in a moment. My main problems recently have been due to the hopeless attitude of French organisations, both private and public sector, towards customer service, which to them appears to be a totally alien notion. We’re not used to this nowadays in the UK, probably because of the way competition has been introduced into many aspects of British daily life. There’s still some way to go, but we take for granted that when a private individual or small company comes up against gross inefficiency, plain bad service or malpractice, then often the former will have the whip hand. However, this is far from the case in France and there are no signs that things are likely to change in the near future. When my financial adviser at my bank wrings her hands and says that this is the way things are here, then I have to say that I begin to rather despair. But maybe I ought to explain what has made me come round to this way of thinking.

I mentioned some time ago that I had a problem with EDF and my electricity meter not showing the correct breakdown of the units I’d used, between full rate (Heures Pleines) and cheap rate (Heures Creuses). I got into quite a lather when I failed to receive any response to the letters I wrote to EDF about the problem even when I knew they’d been received (recorded delivery) and customer service confirmed as such on the phone. Eventually I got a letter out of the blue saying that the ‘Moderateur’ agreed with my complaint and that EDF should agree a modified bill with me, which was done and the matter duly settled. What got my goat was that nobody in EDF could be bothered to let me know that the matter was being dealt with and to wait until the ‘Moderateur’ had come to a decision.

The same is now happening all over again with my new EDF problem, ie having 400 volts fed into my house, that has destroyed half of my electrical appliances. When I phoned customer services, they said that I should send them a list of the damaged items, which I did asking them to confirm when they had received it. I know that they have done, but once again, nothing. This is the manner in which a Government owned monopoly expects to treat its customers, who by paying their electricity bills keep those employed by it in jobs. Time for some competition? Come off it mate, not in France 😐

Anything else? Well yes, actually. A few weeks ago I bought a pair of walking boots off a French web site and when they arrived, they were too small. I returned them at MY expense even though it was the fault of the boots, not my foot size, and after several weeks of chasing the supplier, I was made to feel lucky that the amount I’d paid for them was credited back to my bank account. Good going? Hardly. By coincidence, I’d previously bought some boots off a well-known British web site and they were also too small when they arrived. The supplier also failed to acknowledge my correspondence, failed to make a prompt refund and then apparently lost the boots after I’d returned them by recorded delivery from France. However, the difference was that I was able to use the facility of the Small Claims Court to make a claim against them and ended up with my expenses and interest being paid, plus a free pair of boots.

So is that all? Unfortunately, no. I made what looks like another cardinal mistake of buying a replacement for my damaged microwave oven from the well-known French web site, Rue du Commerce. Unbeknownst to me, although you create an account with Rue du Commerce and place an order on their web site, they then offload it to a supplier, in this case GrosBill, who delivers the goods to you and supplies you with an invoice. Hmmmm…. I hear you say, so who is the ‘contract’ with? Well, if it was Britain, Rue du Commerce, of course as it was they who accepted your order, but it’s obviously a highly unsatisfactory arrangement with the potential for things to get very messy if the deal goes wrong. But what an earth could go wrong, I hear you say, it’s only a microwave in a box – all they have to do is check the box against the order, pick it up and ship it out? Ah, yesss…. but come on now, this is France.

I placed the order with Rue du Commerce on 15th April and my payment was immediately taken. On 16th April I received confirmation from GrosBill that the item had been despatched and a PDF invoice. So far so good. Unfortunately I wasn’t at home when it was delivered on 18th April (I was out on exploding soldering iron business readers may recall) so had to pick it up from Plazac post office on 19th April. When I got it home I only had to open the top of the box without even unpacking it to see that whereas I’d ordered a microwave in ‘Inox’ (stainless steel), the person who’d shipped it out who we must assume to be some way down the food chain, had picked up one in black. And that’s when my problems started. Put aside that the only way you can contact either Rue du Commerce to complain about their error and/or their lamentable lack of customer service is not just via one premium rate telephone number, but two, the second of which you are only told about after dialling the first one. Put aside the tortuous and highly inefficient communication chain via not one, but two ‘customer service’ departments with the potential for misplaced messages and misunderstandings. What I find totally infuriating is that after having eventually made contact and having received promises on several occasions that the matter will be rectified in ‘5’ days and then ‘3’ days and that ‘a prepaid label will be sent’ for me to return the item to them, here I am two weeks down the line and (a) the wrong microwave is still in its box on my kitchen floor, (b) they still have my money and (c) the last message that I received two days ago was, ‘Am I sure that the microwave I’ve received really is black?’

I asked my financial adviser at my bank yesterday if France has an equivalent to the UK Small Claims Court, which makes it so easy to deal with problems like this, inevitably resulting in the merchant losing and it costing them money. There is no equivalent in France – and in fact there seem to be few, if any consumer protection laws at all. One has to ask oneself what French politicians are doing besides having affairs with each other and/or each other’s partners that can be so important that putting proper consumer protection laws in place in this day and age can take such a back seat. It’s because nobody else is having problems, you say. Wrong! According to my financial adviser, everyone is having problems as a result of rogue traders and retailers who couldn’t give a damn, knowing that when they’ve got your money there’s precious little that you can do except mount a full legal claim against them. And as my financial adviser (who’s French, by the way) pointed out, everyone knows how the French legal system works (eg over a year to get the papers through to buy a house) and how slow and expensive that would be. So for that reason, everyone just shrugs their shoulders and takes out legal protection insurance at extra cost which they can then use to get such a case underway.

What a ridiculous system. Good for the lawyers but hardly the way to run a modern economy I’d have thought and I fear that if France fails to address it, there will be little chance of its making its economy more efficient in this, the internet age. I now understand why people here have told me that they don’t buy off the internet, preferring to go into Perigueux and pick up the goods themselves, and also why most of the French e-commerce web sites I’ve come across seem so ‘clunky’ and 1990s in style compared to what we’re used to in Britain. For my part, I’ll not be using either Rue du Commerce or Grosbill again and in fact as far as possible, I’ll return to my previous policy of buying as much as I can from UK web sites and having it shipped over. The shipping adds to the cost but in the long run it’s less financially risky and although it takes a few days longer, it frequently still works out cheaper overall than buying locally. And anyway, I can’t see why French traders should deserve my custom when they are prepared to treat me and my business in such an off-hand manner.

OK, now let’s get back to my toilet. As I mentioned previously, although still unfinished, work on installing my new WC has continued. Each step, putting down concrete, screeding the floor, laying the tiles etc, has needed a complete day and in fact, laying the tiles needed two because of the time it took the adhesive, that was left over from my fireplace work, to dry. Same thing with grouting the tiles in – the amount of grey grout that I had also left over from my fireplace, wasn’t quite enough to do the job, so today I had to go back to Les Briconautes to buy another small pack. But now the floor’s done so allowing for the grout I put in today to go off, tomorrow I’ll be able to start fitting in the ‘Kit WC Suspendu’ itself. Here are some pics showing the steps I’ve taken and the progress made since my last posting.

null

null

null

null

I’m absolutely delighted with the way the new floor tiles have come out as an almost exact for match for the originals. I couldn’t get any more of the ‘terres cuites’ that I bought for my living room floor and in fact, although the originals in the above pictures are terra cotta tiles, the new ones are ceramics. They are slightly smaller in thickness and although unglazed, they had a coloured surface on them which was close in shade to the old floor tiles and also with some variability in colour. I gave them a go with my wet polishing machine and lo and behold, it not only gave them a nice smooth surface like the originals but also ‘distressed’ them a bit, modifying the colour slightly and making them almost indistinguishable from the originals, especially now they’re down and grouted in. That’s one bit of luck, anyway 😉

A delicate subject

Yes, today’s subject is the WC, the humble toilet. It’s one that almost every English person coming to France will almost certainly have to address at some time, especially if they buy an old house like I did, so we might as well get it over and done with. Mine was in a hideous shade of pink that didn’t match the rest of the bathroom, which is in white. Whoever had installed it in goodness knows when had managed to crack the foot of the pedestal when they’d tried to tighten the bolts holding it to the floor and had therefore decided to leave it as it was ie loose. And to cap it all, when I first moved in and was giving it a clean before using it, I’d let the cistern lid slide over on the tiled floor, breaking it in two places. I’d saved the day with super glue but it was obvious that the whole toilet would have to be replaced at some time. I’d been hoping to leave it until I ripped out and re-did the whole bathroom, but events took a hand.

The French toilet cistern works differently from what we’re used to in England. The English cistern uses a siphon system whereas the French merely opens up a tube in the bottom of the cistern allowing the water to flow out downwards into the toilet. As it’s a very simple system, it’s fine and dandy until the rubber sealing the tube begins to wear, at which time water flows constantly out of the cistern and into the toilet. This is what mine was doing. I’d managed to stop it for a while by putting in a new rubber but this only worked for a short time before the problem re-started.

So I decided I’d take matters firmly in hand by replacing my old toilet with a swanky new suspended design. Brico Depot have an offer going at the moment so I picked one up a couple of days ago and today I was so peeved with having to keep turning the toilet supply valve off to stop gallons of water being wasted every day that in the end I decided just to do it. I haven’t got a recent pic of what my old toilet looked like, after all, it’s not something that you photograph every day, is it? Anyway, here’s one I took when I originally viewed the house before buying it.

null

It doesn’t look like much, but believe me, it was even worse in reality. I had visions of having to smash it out but after removing the aforementioned two bolts that didn’t hold it to the floor, I was able just to lift it out and carry it out into the garden. I did then have to attack the floor around the outlet pipe with a cold chisel, because the new suspended WC needs a vertical inlet no more than 14 centimetres from the wall, whereas the old one’s was over 23 centimetres. This was the only time when I was a bit concerned, because obviously I had no idea what I might find when I got under the floor. Here’s a pic of what I eventually found. Note the hole in the top of the pipe that I guess someone had made by accident, and then filled with a blob of silicone 😐

null

I was pleased to find that whoever had fitted it had used a standard 100mm diameter PVC tube and that after breaking my way into the stones of the wall itself there is a joint just beyond the surface of the wall. At that point I nipped down to Les Briconautes and picked up a joint collar and a 90 degree bend together with a small can of PVC pipe jointing adhesive. It was only when I got these home and began to measure things up that I found that in order to get to the 14 cm distance limit that I’d mentioned earlier, I’d have to cut back the pipe in the floor and also the horizontal stub of the new 90 degree bend and also reduce the length of the jointing collar. Having done this it then occurred to me that I’d be better off having just a single 90 degree bend with female joints at both ends so off I went again to Les Briconautes to pick one up (only another 4€) plus a bag of concrete and a small bag of cement to make mortar with when I get to the finishing-off stage.

It was an interesting journey, because it appears that a classic car rally was using the route that I took. Initially, there was just an elderly grey, UK registered Sunbeam Talbot convertible with a strap over its bonnet in front of me, but later when I returned there was a stream of classic Astons, Jag D and E Types, Porsches, Healeys, Ferraris and lots of other types streaming past, together with all the support crews in vans with trailers. I did a quick search but haven’t yet managed to find out any more details.

Back home again, my thoughts about using the single bend were proven right, and in no time at all I had the pipe in the floor cut back and the new bend fitted, as the following picture shows.

null

I’d used my angle grinder to make the cut edge of the pipe nice and straight and even though I was cutting plastic, I realised when it was too late that the machine itself was blowing clouds of dust into the air. I dashed to open the window and the kitchen door before it managed to penetrate the whole house again – what a nightmare that was 🙁 – but some must have. Making the new joint with the special adhesive was a piece of cake and then I was able to drop some of the stone I’d taken out earlier back into the hole and pour in some concrete to fill up the gaps and support the pipe.

null

The above pic shows from the footprint of the old toilet pedestal just how much I’ve managed to move the outlet pipe back. I’m just relieved I was able to do so as easily as I did. I’m not quite at the making good stage yet, I still have to finish breaking out the old tiles around the edges of the hole, but it won’t be long before I’ll be able to fit the metal frame to take the new WC. Until then I won’t have a toilet, so I won’t go into what that means in reality. I’ll just leave it to each individual reader’s imagination 😉

Foot note to today. It was exactly one year ago today that my UK house sale completed, I finished loading up the 7.5 tonne van with the help of my son and step-son, that I’d hired to bring my stuff down to France and started my journey that night to my new life in France.

Back to life

Well, if I was whacked out on Sunday night, by Monday night I was totally knackered! I only managed the two jobs that I’d had planned the day before, too, but they needed a lot more effort than I’d originally bargained for. For starters, I managed to get all of the light wood ear-marked for the ‘decheterie’ onto my trailer in one load but it took me most of the morning because I had to do quite a lot of hand cutting. This was to separate some decent size stuff that was worth keeping to be used to get fires going, from the real waste and by the time I’d finished, I set off in just enough time to get there before the ‘decheterie’ closed its doors at mid-day.

I had my lunch when I got home and then it was time to get cracking on the front grass. First I had to get my ‘debroussailleuse’ out, which I hadn’t used since the early part of last summer, to slash at some long weeds in one of the front corners. In fact I then ended up going around most of the edge of of the grass and eventually outside onto the bank that drops down from my garden to the small ditch at the side of the road. The reason for that was that the tractor had recently been along and trimmed the grass at the edge of the road and by cleaning it all up now, as it’s getting hotter, things will start growing more slowly and the front of my house will hopefully stay looking quite tidy for a while. The machine has a little two-stroke engine and it was a little bit troublesome, needing me to clean the plug a couple of time, but I got the job done. Then it was time for the heavy stuff – cutting the grass itself. It was a good day for it, sunny but not too warm, but the job took me from around 1.30pm until gone 7.00pm to complete, working solidly. And didn’t I know it at the end of it! It was pure luxury to finish, clear up and get under a hot shower, but I still felt the effects this morning though 😉

But I think it was worth it. Here’s one of my ‘view’ shots made by stitching together a couple of photographs, that shows the front grass from the house down to the road. After all the effort, I was well pleased with the results anyway.

null

And so onto today. I’ve been champing at the bit for a few days because the new panel has been ready to be fitted in the X-Air for a little while. Well, today was the day. It took me much longer than I expected to get it into place and all the screws tightened up, mainly because access to several of the nuts on the back was quite restricted and I wanted to be careful not to do any damage to the front or the rear. Finally, all were tight, the panel was secure and I’d double-checked all of the connections I’d made. So it was time for that magic moment- the first engine start-up. I primed the fuel, set the choke, turned on the master (nice red LED, good) and set the mag switches to ‘on’. Then I turned the starter key and… nothing 🙁

It’s funny isn’t it, how when something like that happens our first thought is that we must have done something wrong. I’d already removed the starter switch and was about to pull the three connections off, when I thought that everything had tested fine on the bench, so it couldn’t be something I’d done. So I went looking for something else and in a very short time found that the starter solenoid earth was so loose that you could turn the nut with your fingers. That turned out to be the easy bit because of the unconventional way that the previous owners had mounted it, but after disconnecting the battery, removing the solenoid and its mounting and replacing the dodgy connection with a new bolt, it was eventually back in and ready to try again. This time with the master switch ‘on’ the engine kicked when I turned the key, so I’d confirmed that the problem wasn’t down to me, as I’d suspected.

With the starter switch securely refitted in the panel (it needed tightening anyway) this time the engine burst into life and I was relieved to see that all of the engine gauges worked. I knew that the temperature gauge would because as soon as I switched the master on, it gave a reading just because of the heat of the day, but I was relieved to see that the new rev counter was OK and also that the engine hours gauge functioned. I haven’t received the new EGT senders yet from the UK so I have still to confirm that the gauge I’ve transferred from MYRO, which was originally installed from new, is still OK. I seem to recall that one side of the gauge wasn’t working at the time I came to France (it may have been the CHT gauge, though) but I think that was more to do with a broken connection than anything else because I hadn’t strengthened the very thin sender cables and connections in MYRO the way I have done in the X-Air. All will be revealed in the fullness of time, as they say.

I also still have to connect up the fuel pressure gauge. I have the tubing and a ‘T’ piece but as I need to get hold of some small hose clamps, I decided to leave that job until I have them. So how have things turned out? I’m very satisfied with the new panel but people will need to judge for themselves. Here’s how the panel looked originally.

null

And now here are a couple of shots of the new panel. The fibreglass used in its construction is much lighter than the old panel, which is good, but it means that it flexes easily and may cause the instruments to vibrate more, which is bad. We’ll have to wait and see.

null

null

I just have to get hold of the small hose clips now to finish connecting up the fuel pressure gauge. But tomorrow I must first do a bit of shopping and later I’m looking forward to dropping in on Victor and Madeleine. Tonight, though, I can go to bed knowing that the X-Air has life flowing through it once again, which is very satisfying 🙂

Whacked out!

If you’ll excuse the expression. My first job today was picking up another bottle of gas before the Carrefour in Rouffignac closed and after that I sorted out the X-Air panel wiring. When I checked, I found that I’d wired the other 12V socket, the DIN, in the same way as the cigar lighter socket ie it would only work with the engine/mag switch(es) turned ‘on’, so I changed both, so they will work independently of them, when the master and aux switches are on. The engine hours gauge, though, will still only work when the engine/mag switches are ‘on’, which is definitely how I want it to function.

Then it was time for lunch and after that it was time to get down to the hard stuff, namely collecting all the branches left on my front lawn after Christian had finished his pruning work yesterday. I didn’t just have to get them off the grass, I also had to chop the thin stuff up so I can take it to the ‘decheterie’ tomorrow in my trailer and saw the heavier stuff up that I want to keep so I can burn it in my new ‘poele a bois’ next winter. Well, I did it, and quicker than I thought I would, but now I’m pretty whacked out and ready for a sit down. I can’t watch TV because I haven’t replaced my satellite box yet, so I’m enjoying a second glass of Cabernet Sauvignon while I type this. And I may even have a third, to finish off the current wine box and start the next, and then I’ll start clearing up and thinking of taking a nice hot shower. Tomorrow I really MUST cut my front grass or I’ll be disappearing again into the jungle at the rate it’s growing. So that’s two jobs on the list already for tomorrow. Ah well… c’est la vie en France. And don’t I just love it 😀

Almost there…

I totally finished off all of the wiring on my new X-Air panel today. Yesterday I’d left off the connections to the EGT gauge but on reflection, I decided that this would be unwise. I’ve ordered some new senders from the UK as the ones available over here are 50% or so more expensive. I can have them delivered from the UK for less than the cost of just the senders bought locally before adding carriage. All of the other panel connections are made by flying leads and if I left the EGT sender connections off, it would be difficult to fit them when the time comes without removing the whole panel again, which I obviously don’t want to do 😐

So I decided I should make the EGT sender connections in the same way, using flying leads. I happened to have a short length of light 4-core cable that I bought in Maplins quite a while ago and as the EGT gauge needs two pairs of connections, this was an ideal start. However, the cores are extremely light, which is fine for the tiny currents generated by the EGT sender thermocouples, but I needed to find a way of making connections that would be strong and at the same time resilient enough to employ the usual crimp-on plug-in type connectors. I did it by soldering the connections straight onto the pins on the back of the gauge (easy with my nice new high power soldering iron), strengthening them with rubber shrink-sleeving and then holding that end of the cable solidly in a fixed position by connecting them to the heavier cables of the main bunch with cable ties. I then needed to boost the size of the cables at the other end so they could take the crimp-on connectors and I did this by separating the cables into two pairs, soldering on some heavier cable ends that would take the crimp-on connectors and methodically strengthening the weak cables and the soldered joints with shrink-sleeving as I went to give me the overall strength that I needed. I was very happy with the result which I think will work fine. All I’ll need to do when I have the new senders will be to cut them to length and add crimp-on sockets to make the final connections. Here are a couple of pics that show what I’m talking about.

null

null

I’ve tested the wiring on the bench and it all seems to be fine, except I’ve made one logical slip-up. The hour meter takes power from the starter switch but can only work when the mag switches are ‘on’ ie not earthed, as only then is an earth made for the hour meter. This means that with the mags ‘off’ the hour meter won’t keep running even if the starter switch is inadvertently left in its ‘on’ position. For convenience, because the cables were in close proximity, I’ve connected the hour meter and car cigar lighter sockets to a common earth. However, I hadn’t realised that this means that the power socket will only be live while the engine is running which would not be a disaster as it’s only intended to run a GPS while in flight. However, the DIN socket becomes live when the ‘aux’ switch is turned on independently of any other switch except the master, which is how I intended both power sockets to work, and I think I’ll modify the car cigar lighter socket earth tomorrow so it works in the same way. Best to do it now because if I leave it I’m sure I’ll regret it later 😉

Timber!

After my electrical ‘incident’ I’ve ordered several new items to replace the ones that were damaged, including a new microwave oven. The new one arrived yesterday, of course, while I was out on soldering iron business so I had to go down to the little post office in Plazac before mid-day when it closes, to pick it up. When I got it home and began to unpack it I immediately found that whereas I’d ordered one in ‘inox’ (stainless steel), the one that had been sent was black. This is getting a bit like wading in treacle. I seem to be beset constantly by the mistakes of others that keep dragging me backwards all the time. Because of the mistake, I then had to contact the internet merchant that I’d bought it through, which was not easy because (a) you have to dial a premium rate number and (b) they then divert you to another premium rate number to maximise the profit that they can make out of you. At the same time they give the second number out very, very quickly and somewhat indistinctly so you have to keep replaying it before you get it right. Clever eh? And really, really annoying. This French thing and customer service (or lack of it) is beginning to get my goat!

After sorting the mess out (I hope) at my expense, of course, as it will take at least 5 days for a replacement to be delivered, I turned my attention back to my X-Air panel. I’d just got going nicely and was close to finishing it off when my phone rang. Christian said he’d be right round to prune my giant lime tree that stands in front of my house. When he came I had to give him a hand, of course, and here’s a pic of the work in progress. Just three final small high branches left to be sawn off at a later date when Christian has his long ladder with him.

null

The branches that he took off will make quite a bit of difference as the tree hasn’t been pruned for years and quite a bit of foliage was hanging almost right down to ground level. Last year when I backed up the van containing my belongings that I’d brought over from England before moving in, I had to break off quite a bit of low hanging stuff before I could get close enough to the house and naturally it’s grown some more since then.

Afterwards I did manage to get the new panel finished, after giving Toddie his dinner, of course. What I want to do always has to come last on the list! Here are a couple of shots of the panel back, a bit less distinct than they might have been because of the sun that was by that time streaming through the glass in my back door.

null

null

With a bit of luck, who knows, unless there’s a small local earthquake or some other minor natural disaster over which I have no control, I might even get it fitted in the aircraft some time this week-end. That’s if I’m very very lucky, of course 😐

Zapped!

And almost in more ways than one, as I’ll explain in a moment. And not by the sun either. The forecast for today was more or less correct. After yesterday’s glorious 28 degrees Celsius plus we were told to expect 18 degrees today. And they weren’t far off because the temperature rose to a comfortable 19 or 20 degrees Celsius. So I was able to walk around in shorts, tee shirt and flip-flops without feeling too cool. Whether I looked cool is another matter but I’m of an age when I don’t worry too much about such things 😉

This morning I nipped down to Les Briconautes to see whether they had a high power soldering iron but the best they could do was 60W and at what I thought was rather too high a price. So I decided to go straight to Brico Depot in Trelissac to pick up one of their 100W puppies. The route from Montignac was different from my usual one and it made a nice change. After the rain we’ve had recently followed by the warmth of the past few days, all of a sudden the countryside is looking lovely as the trees are turning green and the meadows are covered in lush long grass and little yellow flowers. Just like my front lawn 😐

As soon as I got back home with the new soldering iron I decided to give it a go. It was one of those trigger operated, pistol types that only take a few seconds to heat up and initial signs were quite encouraging. After a few minutes use I thought to myself that the soldered joint I was working on was making a bit of a lot of smoke even with the amount of extra flux I’d put on it. Next minute I realised from the smell (that familiar smell of burnt plastic) that it was coming from the soldering iron itself! I’d released the trigger by that time of course, but the smoke still kept coming out in billows, so I yanked the plug out and ran outside with the iron in my hand. Toddie thought it was a good game.

So I had a quick bite to eat while it cooled down and the smoke had been reduced to a few light wisps and then I headed of back to Brico Depot with it. So all of a sudden a soldering iron ‘à petit prix’ had become rather expensive, but there was no alternative. Brico Depot seemed unsurprised when I presented them with the offending item and asked if I wanted to exchange it or have a refund. I asked if they had another high power soldering iron that I could buy instead, and the young man said only 75W, not 100W like this one. I said I’d prefer that if it wouldn’t catch fire like this one almost had!

So I got home again by late afternoon and again thought I’d give it a go. And I’m glad to say that this one worked a treat! It quickly melted the ruddy great old soldered joint that I’d been trying to work on and although the new joint wasn’t the prettiest I’ve ever done, it did the trick in moments after I’d been struggling for ages with my original old 30W iron and the new Brico Depot incendiary model. It just goes to show – when you need to zap something you not only need the power, you also need the correct tool for the job. Which this final soldering iron surely was 🙂

Another excellent day

As I’m sitting here typing this, I’m stuffing my face with a large bowl of vanilla ice cream. It’s a fitting end to a gorgeous day when we’ve enjoyed unbroken sunshine from dawn to dusk and a temperature of over 30 degrees Celsius. The forecast was for only 28 degrees but when I nipped out in the car just after 7.00 pm it was still showing that and the evening had already begun to cool down a bit. I spent the whole day working outside on the X-Air panel wearing just swimming trunks and although I’ve caught the sun, I don’t feel as though I’ve been burned. I think it’s still a bit too early for that, but I could be wrong.

I’d hoped to get the panel all wired up today but it didn’t happen. The main reason for that was that I’m re-using old switches etc that were previously soldered. This is always a problem – new items can be soldered in much more quickly in comparison – but this isn’t what rather annoyed me. That was because whoever wired up the old panel soldered almost everything when it wasn’t really necessary. And that wouldn’t be so bad either except they didn’t do a very good job. So switch terminals that could have accepted blade connectors have enormous lumps of solder on them, and where terminals have been bridged across there are lumps of ugly bare wire. If the terminals in question weren’t common earths, this would be totally unacceptable, of course. But before I started, I thought I’d see how the panel will look when placed in position in the aircraft.

null

null

I did the best I could but progress was not as fast as I would have liked. I eventually got to the point when I wanted to solder the leads from two LEDs onto a common earth on one of the mag switches when I had to admit defeat. My little 30W soldering iron just couldn’t supply enough heat to run the volume of solder and make the joint and to have continued might have resulted in damage to the switch. The solution will be to buy a 100W iron which I know I can get from Brico Depot for 7.95€ and that’s where I was going this evening before I decided that I might as well wait until tomorrow and buy an iron locally, and turned back for home.

When I arrived home, the evening was already beginning to cool a bit and while I was knocking up a spaghetti bolognese, this is what I spotted in my front garden.

null

That’s Aurelie and Benjamin’s cat Scratchie in my bird bath. I know there’s a bit of a thing about private swimming pools around her, but isn’t this taking things a bit too far? Actually, I think with today’s sun it was probably dry, but he’s still got a bit of a cheek, don’t you think 😕

A long day

It was a lovely day today for working outside – sunny, no wind but not too hot because the sky had a thin curtain of very high cloud. I spent the whole day working on my new X-Air panel. The work took longer than I expected – it took an hour or so just lining the panel up and drilling the holes to mount it when it’s finished – but just as the evening began to die I got to where I wanted to be, with all of the gauges and switches mounted ready for wiring up tomorrow. I’d hardly stopped all day and I was glad to be able to cover the aircraft up and go indoors for something to eat and drink.

It hasn’t turned out too badly. I’ve made a couple of silly mistakes but it’ll probably only be me that notices them. Trouble is I’m a bit of a perfectionist and am always highly critical of my own work. Here’s how it looked at the end of the day.

null

It’s not my finest work I have to admit. What doesn’t help is that the fibreglass it’s made from is of such poor quality as I mentioned in a previous post, the main problem being that the gel coat is just so thin. As soon as you get near it with a tool no matter how hard you try, it flakes all around the edges of any hole. But c’est la vie – at least it’s a considerable improvement over what was in the aircraft before 😉

MYRO – what now?

Up to now, I’ve purposely avoided posting pictures of MYRO since the accident because I’ve always thought that doing so would somehow validate the spiteful invasion of my privacy perpetrated by the despicable Bob Thompson and his wife when immediately afterwards they plastered pictures of it over the Internet and the microlight forums. I made my views on the matter pretty clear at the time and as far as I and others are concerned, they can now stew in their own juice because the nastiness that they stoked up has more to say about them than anything else. However, although I will stick to my original decision not to publish any pictures of the accident itself, as I am considering what my next steps will be for MYRO, I have now decided to show some pictures of it. Anyone who has been following my postings about events down here will know that ever since the accident, around ten months now, I’ve kept MYRO safely under covers in my back garden until I get around to deciding what to do with it. And I’m pleased to say that it hasn’t fared too badly in that time, as the following pictures show.

null

null

null

null

I did have to clean it up a little bit before I took the pics because as I found when it was parked under covers at Linton when I first acquired MYRO, the passage of air through the airframe when it’s parked outdoors deposits a weird black greasy film over everything. This affects the inside of the covers, the upholstery, the panel and instruments, the screen, in fact just about every surface. The situation was made worse because although MYRO was covered by a tarpaulin, the doors had been left off and the cabin was therefore completely open. The black film comes off quite easily when washed but looks awful, especially if it’s had the chance to build up a bit as now. We had a lovely day today – sunshine all day and 26 degrees Celsius – so I thought now was the time to sort MYRO out a bit, especially as I need some gauges out of its panel and the panel needed to come out in any event.

So today I gave everything a clean up, removed the panel and also emptied the tanks which still had the best part of 15 litres of fuel in them. My aim then was to seal MYRO up as far as was possible (that’s why I taped the broken nose back on again – to fill the hole up), replace the doors and wrap it up in a kind of cocoon to stop the air blowing through it. Hopefully that will then do the trick and MYRO will be preserved in its present condition until I decide what should be done with it.

The next two pics show the cabin after I’d taken the panel out and MYRO all wrapped up and replaced in the corner of my back garden. It’ll be interesting to see if fixing the cover in that way does the trick and keeps MYRO cleaner than it did up to now.

null

null

So what are my thoughts about the future of MYRO? Well, as I now have the X-Air which is much more suited to the Dordogne than the little AX3, the easy thing would be cut and run, get rid of what remains of MYRO and get on with my life down here. I may still do that, but there’s another interesting idea for consideration. In France there is a large number of very cheap Weedhoppers, which is what the AX3 actually is, without engines, many of which are being offered for sale as parts, and the longer time goes on, the more of them there are, of course. So repairing MYRO would be a real possibilty and as AX3s are a bit like Trigger’s broom, it would be quite an easy and cheap proposition. There might be a question-mark over covers because some of MYRO’s were damaged in the accident and repairing Ultralam covers can get quite expensive, let along buying new ones. The repair itself would be quite straightforward without the intrusive presence of the BMAA Tech Office and all the rigmarole that goes with it but at the end of it, MYRO couldn’t be registered again as a British permit aircraft. That would not be a problem, of course, because my intention always was to transfer MYRO to the French register and as things are, the UK register merely records MYRO as having been exported.

So what now? Well, nothing actually because I can afford to bide my time. When I’ve finished getting the X-Air sorted, I’ll strip MYRO’s wings down to the tubes the way the X-Air’s were for easier storage. Then I’ll contact a few of the Weedhopper sellers – there’s one offering one for parts only about 20 kms away down here in the Dordogne – to get an idea of what’s actually available and what the repair will cost. Then we’ll see … 😉

Moving on again

After my electrical episode, I contacted a local electrician the next day who said he’d be along at 5.30 pm to see what was up. Typically, he didn’t turn up and I’ve had no further word from him at all since then, so he’s definitely not going onto my Christmas card list! Luckily I had my generator to fall back on so with a couple more extension leads that I got hold of at the local Carrefour, I was able to run some temporary lights and my little fan heater and boil a kettle, so life wasn’t that uncomfortable. On the second day after the disaster I contacted another electrician who turned out to be a real diamond. He said he’d drop in at 2.30 pm the same day and turned up early at 2.15 pm. What a difference! He spotted the problem in a few minutes (local knowledge I guess) and had the whole system back up again in less than half an hour. He then went round the whole house and checked every socket and power outlet before declaring the whole thing safe and after the best part of an hour’s work charged me only 35€ for his services. I told him that once I’d resolved the issues with EDF and most likely had the house converted to single phase, I wanted him to come back, replace my old fuse box with an earth-leak contact breaker system and check the whole of my electrics out, replacing the bits that needed it, and I look forward to giving him the chance to do so.

Once he’d got the system back up and running, I was still, of course, left sitting on a heap of damaged electrical equipment, including my SFR Neufbox that had provided me with both Internet access and my VOIP based phone system. Plus the Philips DECT three handset network that I’d brought with me from England and had plugged into the Neufbox was also defunct. I phoned SFR customer service and the young lady on the other end of my (mobile) phone originally told me, with much laughter from both of us as we conversed in French, that SFR would send me out a new Neufbox and that I should then just return the old one. However, she then went off the line for a few minutes, literally as my mobile connection dropped out, and when she phoned me back she said she had some better news for me, and that if I took my old Neufbox to the SFR boutique in the Leclerc shopping centre at Trelissac (about 20 kms away on the way to Perigueux), a new one would be waiting for me to pick up in 2 hours time. What brilliant service! And it was! So after picking it up I also then nipped into Leclerc and bought a new Gigaset three handset DECT phone system with the result that the same evening I was back up with Internet and phone. Mind you, it took me over half of the next day to reload my telephone directory into the new system 😐

Since then I’ve decided that there’s no point waiting for EDF to make its decision about compensation, especially as I haven’t even written them a letter yet, and that I’d have to start purchasing replacements for the main things that have been damaged. I’ve purchased a couple of items from the UK, such as a new Freesat box, Humax this time, and a Gunson automatic battery charger, and I’m mulling over whether to buy a new DVD player as well from the UK, where it looks as though such things are much cheaper than here in France. Obviously, though, I’ll have to source a new microwave locally so I’ll start looking around for one in the early part of next week.

In the meantime, what of the X-Air? Well, some fuse holders and fuses that I’d ordered from the UK arrived a couple of days ago. I’d tried to source these locally but when I only want a couple of glass fuses, I resent having to buy a whole box of the ruddy things because the local supplier refuses to break it down. I’m afraid that I still think that in many aspects, the French have quite a lot to learn about customer service and giving the customer what he wants, especially at this time of economic uncertainty. It was cheaper for me to order in the UK and pay carriage for just what I wanted than to buy two boxes of fuses locally that would probably then just be sitting on a shelf in my ‘cave’ for ever. Well done British enterprise, and especially Vehicle Wiring Products of Derby who I used a lot when I was still in the UK and will probably keep doing so even though I’m now over here.

So I’m just about set to complete the new X-Air panel. Today has been glorious – temperature 20 degrees Celsius or a bit more even and sunshine all day – but even though the RPM gauge that I bought through the small ads arrived today, I decided not to press on with the panel and to cut my grass for the first time this year. It was very long all around the X-Air and as all my neighbours had their mowers whirring away, I thought I might as well do the same. In any case, it will make working on the X-Air much easier now, and as the whole week is forecast to be dry and sunny with the temperature getting up to 26 degrees Celsius mid-week, there will be plenty of opportunity. The RPM gauge is even better than I expected, by the way, and I think it was a very good and wise buy, as pictures of the panel will ultimately show. That’s if it works, that is! I’m sure it will, as the seller assured me that it’s in perfect working order 🙂

So it’s just a matter of dropping all the gauges etc into the new panel and wiring them all up. It’s not as complicated as it sounds as the following system diagram shows.

null

I’ve made some to changes to the system that was installed as I said I would. For a start, the Aux switch now just controls the power sockets, which I think is sensible, and the key switch becomes live only when the Master is turned on. As well as operating the starter itself via a 10A fuse, it is also a switch in its own right when it returns to its ‘On’ position after the starter has been activated, so I’ve used it to run the Hobbs (hours) meter which I think is the best option. Also the temperature gauge only works when the Master switch is in the ‘On’ position. So it’s quite simple and straightforward, really, which is often the way of things when they’ve been thought through. I’m a firm believer in the old saying, ‘If it looks right, it probably is’ and I think this is true this time. Before any UK X-Air owners reading this say, ‘Oi, my system’s different to that!’, don’t forget that UK aircraft have a push button starter, whereas mine has a key start, and I’ve also installed the 12V power sockets that I want and stuck to the Rotax approved wiring system. And the nice thing is that it’s ‘what I want’ and not what someone in the back of the BMAA Tech Office thinks I should have 😀

So tomorrow’s the day of the big leap-forward and by the end of the day, I’m hoping to have the panel finished, fitted and the X-Air’s engine running again. And finally, two little bits of extra news. My neighbour Jean-Claude has said that he’ll have no objection to my eventually taking off from his field to fly the X-Air over to Galinat, which is great news, because it means that I can finish all of my work on it here at home and not have to transport the aircraft by road and assemble it on the airfield. And the last bit of news is the best of all. I bumped into Christian, the owner of Galinat today, and in our conversation mentioned that we needed to discuss what rent I’d be paying. He gave me a very old-fashioned look that only the French can do properly and said, ‘Roger, all we all do is look after the airfield together’. So that’s it – what a super surprise and how lucky I am with the way things are turning out. But maybe it shouldn’t really come as a total surprise because, after all, C’est la France!

Extraordinary experience

I could hardly believe this. Two days ago I was indoors working on my new X-Air panel when all of a sudden there was a loud buzzing sound on my PC sound system, the lights in my house started flashing and the computer began going haywire. Lots of other weird things began happening and I realised that there was some sort of electrical fault in progress but didn’t know what. Then there was a strong smell of burning plastic and when I touched the energy saving light bulb next to my computer it was much too hot to touch. Same thing with the strip light I only recently put up in the kitchen – I took the cover off and the choke inside was so hot that I couldn’t put my finger on it. When I went back into my lounge there were clouds of smoke coming out of my DVD player and I knew it was time to disconnect everything. Turns out I was too late but I’ll come back to that in a second. When I got my test meter out and stuck it in a wall socket it read 400 volts!!

I got the EDF (Électricité de France) engineers in immediately that evening and they confirmed that the supply itself was OK – the fault was in a box on my wall – but that my house is being supplied with 3-phase electricity. I was incredulous! Nobody had told me and as anyone knows, 3-phase is for industrial applications, needs special wiring, sockets etc and is NOT for home use. Not only that, it’s more expensive (no wonder I’ve been getting big bills) and in a domestic situation it could be very dangerous. As my friend Bruce has confirmed to me as an ex-engineer, shocks from 220V and 400V can both kill you, but the chance of surviving one of the latter voltage is negligible. As I’d just seen with my own eyes, if I hadn’t been at home when this all happened, there’s a very real chance that the house could have caught fire once items such as the DVD player had burst into flames, which from the smoke it was emitting, I’m sure it would have done if I hadn’t had time to disconnect it.

So far I’ve found that the following items have been destroyed:

– Microwave oven
– DVD player
– CD/music system
– Satellite receiver
– DECT phone system
– SFR internet/telephone system
– Kitchen light
– Coffee machine
– Automatic 12V battery charger

In fact the list includes more or less everything that was either operating at the time or plugged in on standby. Luckily my new TV was not plugged in and my fridge and freezer both survived, but just by luck I think. The same goes for my computer system which I was amazed to find was still working when I connected it to a 230V supply from my generator, which luckily I had to fall back on for necessities such as temporary lighting and heating. SFR have been marvellous and so helpful – a young lady arranged for me to pick up a replacement Neufbox this afternoon and having bought a replacement DECT phone system at the same time for 79.90€, at least I’m back up already with internet and phone connections.

I’ve contacted my home insurer to see whether I’m covered but I am not prepared to let the matter rest as far as EDF is concerned. I think it’s monstrous that when I signed up nobody told me that my house had a 3-phase supply because if I’d known, I’d never have accepted it. And they also came in in December and changed my meter and still nothing was said. The engineer gave me some waffle the other evening about how 3-phase is common in the countryside because of the need to operate machinery but even he had to agree that there wasn’t much use for it in a house which had been converted nearly 40 years ago and should have been changed over to single phase, a quick and simple operation. I can tell you, I’m livid that EDF can have been so sloppy and apparently have such scant regard for the safety of their customers. I phoned my estate agent this afternoon and asked why wasn’t I told about this before I bought the house, and how come I’ve got a Diagnostics dossier that’s an inch thick that analyses everything including the paint on every wall in the house to say whether it contains lead or not but mentions nowhere in the electrical section that the house had a very dangerous 3-phase electrical supply.

The way I feel at the moment, sitting in a house that came close to catching fire and having been unwittingly exposed to the risk of death from electric shock, there’s no way that this thing is going to stop here 😐

Some useful progress

Today started off gloomy with a distinct chill to the air and as I needed to work on the new X-Air panel outdoors because of the dust the drilling would make, I wasn’t inclined to make an early start. Luckily it brightened up later on, although it never became what you would call warm, so I set up my new Workmate outside the back door in what sun there was, started Frank Sinatra Live at The Sand Hotels 1966 playing on Spotify and got going.

I seem to have changed the panel layout every time I’ve looked at it, which may not be a bad thing really, because better to keep improving the layout before you’ve started drilling rather than after. I’ve finally arrived at what I think is the right panel for me – it will do what I want it to and I also like the way it looks. The picture below shows what I’ve finally arrived at.

null

I’ve decided to use the altimeter and VSI out of MYRO, mainly because they match. I’ve got a large altimeter (and a small one as well, actually) that was in the X-Air, but there was no VSI and if I just used the one from MYRO, the two instruments would not be similar in appearance. By using the small ASI in kmh that was already in the X-Air rather than a large diameter gauge that I have that reads in mph, I’ve been able to mount the ASI, a slip ball that I already had from AX3 G-MYME, I think and a 12V cigar socket in a vertical bank in front of me, thus saving some useful space. This means that I can keep the engine hours gauge over on the left on the pilot’s side of the panel and still keep plenty of space in front of me to Velcro mount my GPS, with the added bonus that the 12V socket it needs is conveniently close to it. And I’ve had a bit of luck there. As I mentioned in a post last year, I broke my car satnav lead many weeks ago when I drove to Nimes to see some floor tiles and in an attempt to keep the satnav working, I bought a replacement with a short curly lead. This turned out not to be suitable for my car cigar lighter charger and I almost decided to throw it away. It now turns out that that lead fits the 12V socket that I’ve fitted into the X-Air panel absolutely perfectly, and as it has a short curly lead, I’ll be able to avoid the problem I had with MYRO, of having a long GPS lead draped across the cabin with a bunch of lead coiled up next to the satnav itself. Lovely 🙂

I’m mounting four engine gauges in a bank on the right of the compass, which I’ll be keeping in the centre of the panel, as it was originally in the X-Air. I have a small RPM gauge that was in the X-Air but I won’t be using it, for the weirdest of reasons. When I went to view the X-Air the first day up in Brittany, lo and behold there was a small live fly crawling around under the glass of the RPM gauge. Well, to cut a long story short, that fly’s dried up corpse is still in there and there’s no evidence of how it got in or, indeed, any way of getting it out. I’ve tried to crack the gauge apart without doing (too much) damage, but it has proven to be impossible. But as luck would have it, two RPM gauges from Rotax 2-strokes were recently advertised on the internet small ads over here, and having contacted both sellers, I’ve agreed to buy one of them. At only 43€ including delivery it won’t break the bank and as a bonus, it also looks to be in much better condition than the one containing the poor dead fly that I’ll probably be chucking away. What a way to go eh 😐

Only the water temperature gauge comes from the X-Air. It has neither a fuel pressure gauge nor an EGT gauge at the moment so I’ll be using the fuel pressure gauge that I bought new for MYRO (a good idea because if it isn’t used, it will probably gum up like MYRO’s original one did, if it hasn’t already…) and checking to see whether I should use MYRO’s EGT gauge, which I also bought new, or buy a new gauge and sensors. As I mentioned in an earlier post, I don’t want to strip MYRO unnecessarily, but because of the damage to the pod nose, the panel will have to come out at some time anyway, and I’m thinking that I might do it now while I’m in a panel-kind-of-mood, before gauges etc start to deteriorate.

I’m fitting the switches in what I think is a logical order, fairly high up in the panel below the compass. The reason for that is so I can Velcro my Vertex transceiver and interface in the space below them, as far as possible avoiding interference with them by the connecting cables. That was a slight problem with MYRO because the space available on the AX3 panel was a bit less, so things should be better this time around. The 12V main fuse I’ve shown in the diagram is the one I’ll be moving from up near the engine, as mentioned in my previous post, and there will also be a 10A fuse for the electric starter next to the key, much as I did in MYRO. I’ve now decided to fit only the single 12V DIN socket, the reason being that I think it’s a good idea to have one, even though I never ever needed one, let alone the two, that I fitted into MYRO’s panel. And finally, there will be two more panel-mounted fuse holders adjacent to the DIN socket, which will be for the DIN socket itself and the 12V cigar socket on the other side of the panel.

I made good progress with the layout today, but didn’t get anywhere near to finishing it. Even so, it’s taking shape as shown in the following pic.

null

The fibreglass in the X-Air panel is a lot lighter than what was used in the AX3. Both the gel coat and the mat are much thinner and as a result, I’m finding that the hole cutters are making the gel coat more chipped and ragged around the edges of the holes than I would like. But there’s no point getting upset as there’s nothing that I can do about it and I’ll just have to see if I can tidy it up a bit with a few dabs of black paint. The X-Air gauges also all had odd bolts and screws and unfortunately I haven’t been able to get hold of any suitable screws. So on Saturday I picked up a lot of small stainless bolts, nuts and washers (you fill up a small plastic envelope with as many as you can fit in and pay a fixed price) and I’m using these to secure the gauges, as the picture shows. I like the result better than I thought I would. And the other thing that I like a lot, is that I can do all of this without having to report to the BMAA Technical Office for approval and pay through the nose for the privilege. Now that really is progress in my book 😀

Afterthoughts

I’ve been having some further thoughts since I did the X-Air’s re-wiring. Although the two in-line fuses up near the engine are OK and will work, I’m wondering whether I might re-position them. This would only be for the sake of appearances, mind, and wouldn’t affect their functionality. The one in the battery charging line I’m thinking about moving back behind the cabin where you could get at it by pulling down the interior cover behind the seats. This shouldn’t ever need to happen and it would reduce the size of the bundle of connections up near the engine. Similarly, I could get rid of the other one by changing it into a panel mounted fuse. This would not only improve the appearance up near the engine but also improve accessibility.

If I’m going to do it, now’s the time while the panel is still on the bench. Knowing me, I have to implement a good idea even if it involves more work, so stand by for future bulletins 😉