Incontournable!

Or, loosely translated, just got to go for it!

I was idly watching videos on Youtube yesterday evening, as you do, and I came across a couple of e-bike reviews. One was by a rather conventional young man in Bristol (UK) who was a cycling devotee and evidently keen on following all the rules who thought that riding down some steps was very risqué and cavalier, and another by a long-haired bloke in California who had put together the bike he reviewed in his living room and was, ahem… quite the opposite.

Not only was the bloke in California going all-out for fun but he’d done so by finding a monster of a bike with dual electric motors, one in each wheel hub, a claimed range of over 60 km without even pedalling (!!) and a top speed of… wait for it… over 35mph (56kmh). And he was almost bursting with excitement throughout his whole video as he rode up and downhill, on the beach, over big heaps of earth at the side of the road and just about anywhere else he could take it. That said it all to me.

I’ve already got an e-bike, but it’s a sit-up-and-beg, old style one that’s maybe not quite first generation but probably not long after.

null

It still works as it should but unlike later models you have to pedal to make the motor cut in. That’s fine when you’re a sprightly young thing as I was about forty years ago but not now. What I want is to have the option of pedalling a bit and getting the old circulation moving on the flat but having some proper assistance available for the hills because then you can confidently ride out over longer distances and know that you won’t be defeated by the terrain.

So where’s this going, you might ask? The bike that the Californian guy was reviewing had cost something over $1000 just a few months ago and I wasn’t surprised given its specification because all of the single motor, high power models I’ve looked at recently on sites like Aliexpress have been in the 700-800€ price range or higher. This one with dual motors would have had to cost more.

I had a model book-marked in my browser from last week that up to then I hadn’t paid much attention to but having seen the Californian review I thought that I’d take another look at it and when I did I was surprised to see that it also was dual-motor and almost identical to the one in the review.

null

So it was worth a second look. Yes, 21 gears, a 48 volt rather than a puny 35 volt system and also hydraulic disk brakes rather then the mechanical, cable operated ones that the Californian guy had looked down his nose at. But the biggest surprise came when I looked at the price… only 393,96€ including delivery!

OK, I thought, the usual Aliexpress ploy. They show the price of the lowest cost part of the item – in this case the battery – and when you click on it you find that the complete bike, including the battery, is two or three times that figure. But no! The price really was only 393,96€!

And the surprises didn’t end there. Maybe because I’ve bought a few items from the Aliexpress web site recently, I was also offered a voucher for a further 20€ off, making my price an astounding 373,96€. So what could I do? Yes, you’ve guessed it. I bought one. I mean, after all, what can possibly go wrong at that price… 😕

The bike comes in a range of fluorescent colours including yellow, red and blue. I was sorely tempted – after all, why not go the whole hog.

null

null

However, I thought that possibly discretion might be the better part of valour as a grandad flying about on a bright red or yellow e-bike might attract a bit too much attention and to be honest, although lots of kids and young people are dashing about using e-scooters as personal transport, I’m not sure how legal an e-bike like this is in France. So I’ve gone for one in black and white that won’t catch the eye of any passing ‘flic’ and cause my collar to be felt.

null

It’s due to be delivered by 1st March and quite honestly, I can hardly wait. I must put my old bike onto Leboncoin in the meantime to make room for the new steed 😉

What’s this?

I’m not planning to do any more work inside the house for a short while so after a quick trip that I had to make to Montignac, today was a perfect day to give some attention to my aircraft. I started and ran the Savannah’s engine for a while a couple of weeks or so ago but the Xair’s engine hasn’t been started and run for many months, so that was my main aim today.

I had to pull the Savannah out first and as usual, was shocked to see how dirty it had become yet again. This year must be the year for seriously getting back into the air after my house-building efforts and before I do that both aircraft will need to be thoroughly cleaned and serviced. After moving the Savannah away from the barn to create a space to move the Xair into, I pulled that out also and removed the canvas engine cover and the cover over the screen so I could open the left hand door and get in.

When I arrived I’d checked Malbec’s runway and was surprised given how little rain we’ve had lately by how soft it still is. It’s still not flyable and someone’s also driven a vehicle, probably a large SUV, around over the top of the runway creating some quite deep gouge marks. It also wasn’t easy getting the aircraft out of the barn due to the muddy state of the ground in its entrance.

I checked the Xair’s engine over prior to starting it and was pleasantly surprised to find that despite the amount of time it’s been standing, there was plenty of charge in its battery. Although it hasn’t been started, I have turned the engine over from time to time and it started and ran immediately. This was despite the fuel being over a year old, much easier and more smoothly actually than the Savannah’s had done when I started it a few weeks ago, so I was very pleased with my efforts.

It was as I was pushing the Xair back into the barn that I noticed something strange. For a few moments I thought it was a round piece of rock or broken concrete and wondered how I’d not noticed previously when I’d pulled the Xair out. But when I looked at it more closely I found that it wasn’t something hard at all, but more like something made out of paper. What on earth was it?

null

I think it was some kind of nest, probably one made painstakingly by wasps or some other wood chewing insect as there was a single hole in its side that would have possibly been used as an entrance and exit. This would certainly figure because if it had somehow been attached to the Xair, somewhere under its covers, there would have been plenty of time for it to have been constructed over the summer as the aircraft has remained undisturbed for months.

But anyway, I kicked it out of the way around the end of the barn and there were certainly no insects in or around it now, probably a good thing for me. I then started and ran the Savannah’s engine again too for several minutes before pushing that back into its place in the barn.

My next job must be to pull it out again, give it another thorough wash and clean and a good service including an oil and filter change and maybe new plugs depending on how they look when I take them out. Both aircraft have been neglected for far too long and with Spring just around the corner, I really also need to think about moving the Xair on to a new owner.

99% finished

After today, my utility room is finished except for the small amount of plinth around the base of the floor mounted cupboard and the finishing strip on the end of the worktop. As both tasks involve applying edging strip I decided to leave them until tomorrow and do them together. There’s still the tiling to be done, as there is in the kitchen, but just as for the kitchen, the room can now be used to its full extent and the tiling can be done as and when I can get round to it at a later date.

Making the new back panel for the small wall mounted cupboard took a long time, much longer than I’d anticipated. I’m a self-confessed perfectionist but totally understand that in jobs requiring craftsman-like skills, perfection can only be attained by real craftsmen. I have no pretensions on that score so I just try to do the best job I can, aiming for a result that I am happy and can live with, and almost invariably that takes time.

Cutting out the new back panel for the hot water pipe proved to be quite difficult and very time consuming even with having the old panel as a template. What complicated things was that not only did the adjustments to the back, side and bottom of the cupboard have to accommodate the water pipe but they also had to allow for the angles that the cupboard had to be placed in and the height it had to be placed at to attach it to the wall fixings.

This would have been easily done by chopping more away but then the job would have been ruined. Here’s how it actually came out and I was happy with the end result.

null

null

Now a series of shots of the 99% finished room after I’d cleared up at the end of the day.

null

null

null

null

null

null

null

It’s been an arduous few days getting this room done but well worth the effort. As I only have a couple of small jobs to do and will then just take the rubbish up to the waste bins, I’ll probably have a bit of a lie-in tomorrow morning. I’ve decided that I’ve earned it 😉

Only plumbing

This is nearly always the problem when you go out to by stuff in France – you end up wasting so much time. It was 3.15 pm by the time I got back with a pair of new tap connectors and a sheet of white faced hardboard so too late to start any major work today. But I did finish connecting up the new sink in the utility room so that’s the plumbing all finished (subject to finding no leaks tomorrow!) leaving just the carpentry to do (the ‘menuiserie’ as it’s called here in France) to finish the room off.

The reason it took so long was because I wanted flexible connectors about 25 cm in length and the shortest available in Leroy Merlin were 30 cm. So I then went into Brico Depot and found it to be the same, so I bought a pair anyway. Then just to be on the safe side, I went all the way to les Briconautes in Montignac and found it also to be the same (but more than twice as expensive as the other two stores) so then went home to trust my luck with the ones I’d bought.

They were a little bit too long but I managed to get them in and the images show the results with the mixer tap working and the overflow installed.

null

null

The sink came with two alternative holes in which to mount the mixer depending on which way round the sink was installed. It came with a plug for the unused hole which I don’t like, so I paid a bit more for a cable operated pop-up waste with a knob that fits into the spare hole and is turned left and right to raise and lower the waste ‘basket’ (it’s not a plug as such as shown in the pictures).

null

The shot showing the underside of the sink shows the shiny pieces of waterproof tape that I added to the joints in the waste pipe to stop them weeping. Everything is fine right now and I just hope that it stays that way.

null

So it’ll be ‘menuiserie’ day tomorrow and that should mean the room will be finished – apart, that is, for the tiling as is also the case for the kitchen. But at least the room and its storage will be usable, which will be a major leap forward towards emptying the storage where I’m keeping furniture and other stuff.

I didn’t make it

I wanted to get my utility room finished by the end of this week-end but I ran into just too may problems in the latter stages and was unable to. It started with the waste system for the sink. I can honestly say that over the years I’ve run dozens of PVC waste systems using the special glue that is needed and never had a joint leak. Not one.

When I ran this one, which will probably be my last one ever as I don’t intend to ever build another new house or make changes to this one’s system when it’s all done and dusted, two joints leaked. I don’t know whether the ‘slow’ glue I used is actually now ineffective or what, but the only way to ‘fix’ a leaking plastic system, which as I say I’ve never had to do, is break it out and re-do it.

But that was impossible with this one due to everything being built-in and the lack of access, so I had to look for other ways to stop the leaks. I tried applying the special glue around the outside of the joints but that didn’t work. Then I tried running superglue around the joints because that can also ‘melt’ PVC, but that didn’t work either.

I then had the idea of applying small widths of the super-adhesive, waterproof aluminium tape that you use to seal leaky roofs, around the outside of the joints and that seems to have done it, without looking too much like a ‘bodge’, which I hate. Then when I checked the joint from the sink waste running into the trap, I also found that was weeping slightly as well.

I hate French plumbing components as I’ve said here many times because from my experience their quality is almost uniformly abysmal. The joint in question was a supposedly fool-proof push in, quick connect system that was guaranteed leak proof. I know, why didn’t I just buy a cheaper trap that you can screw together yourself that you know practically for certain will not leak? Maybe next time – but hopefully there won’t ever be a next time.

I took it apart and applied some joint sealant paste, which shouldn’t be needed, and it looks as though it may have done the trick, but I won’t know until the sink is used for a while, and in the meantime I’ve wasted at least 3 hours, perhaps nearly half a day, on leak problems that should never have arisen.

The next problem that I came across this morning was when I found that the flexible tap connectors that were supplied with the mixer were too long to connect to the hot and cold water supplies. Both Leroy Merlin and Brico Depot only open until 1.00 pm on Sundays (and they’re both unusual in that as other suppliers remain closed all day) and I thought about dashing out to get some shorter ones. But I then decided that my time would be better spent on getting the wall cupboards up.

That ultimately led to my last problem of the day which was, once again, to do with one of the pipes on the wall. The hot supply from the heat pump descends the wall to connect to the manifold that is now behind the 50 cm wide floor mounted cupboard. In doing so it passes right through the 50 cm wide wall mounted cupboard directly above it which has to be cut away to take the pipe.

I tried doing it with the cupboard fully assembled but although the cut-outs in its side and bottom came out OK, the large slot that I had to cut into its back panel was way off. The only solution will be for me to buy another sheet of white fronted hardboard and use the old ruined panel as a template to make a new one. That won’t be too difficult but it’ll be for tomorrow, so that’s when I decided to call it a day.

Now the pics, starting with the worktop fully installed and firmly fixed with the cut out for the sink.

null

This shot shows the tiny space in the side of the floor unit through which I had to route the sink waste. If I’d know I would have extended the hot water pipe and moved it to the right by a couple of centimetres or so. This would have avoided the problem which really couldn’t have been foreseen.

null

Here’s a close-up of the sink cut-out which I sealed to prevent damage to the worktop should any water seepage occur, which hopefully it won’t.

null

Now some shots at the end of the day showing the stage reached with the two large wall cupboards permanently mounted and the third smaller one just hanging in place.

null

Next a view of the worktop and sink unit. The waste seems now to be working without any leaks but the mixer, although permanently installed, is not connected to the hot and cold water supplies.

null

Here’s how the wall cupboards look. They have gone in well and will end up looking exactly the same as the ones in the kitchen.

null

The last shot shows how the hot water pipe passes through the 50 cm wide wall cupboard. The old, ruined back panel is not in place in the picture.

null

So work on the utility room should, all being well, be finished tomorrow. I wanted to then press on and build my new cloaks cupboard but I see that after tomorrow we’ve got several warmish, dry days forecast with only light winds. So I’m thinking that maybe I should use them to clean and service my aircraft, which have been severely neglected over the many months that I’ve dedicated to my house-build and are sorely in need of attention.

Coming along

I’ve been pressing on with fitting out my utility room. Slow and steady is the name of the game because it’s been quite a tricky job involving lots of cutting to fit the base unit around the many pipes on the wall behind it. I’ve also had to run the waste for the sink which had to be as close to the wall as possible to allow the freezer to push back as far as it possibly could and then enter the base unit from the side through a very narrow gap between the side panel of the unit and the hot supply to the sink.

It would have been very easy to make mistakes but I’ve closely followed the well-known advice to measure twice and cut once. And so far I’m very pleased with how everything has gone because nothing has gone amiss to spoil the look of the job which is always very close to my heart. This included notching the back edge of the worktop for the hot supply that descends the wall, which came out perfectly, as well as all of the cut-outs that I had to do to both sides of the cabinet to accommodate the pipework.

null

null

There’s still quite a bit more to do and although I may not finish the job tomorrow, I should get it done by the week-end which was always my principal aim. The worktop and sink are not yet fixed in the above images and that will be my first job tomorrow. It shouldn’t take too long, although the front and back fixings of the sink might be a bit tricky, and then it will be time to hang the wall cabinets which are assembled and ready.

Some people might be wondering why I’m fitting a sink in the utility room because it’s possible that I won’t use it all that much. The reason is that I don’t see my house as being purely for me – rather it’s a small three bedroom family home for which a sink in the utility room is perfectly appropriate. I always built the services in for it and it’ll be difficult to install a sink and connect them later, when the room is completely fitted, so now’s obviously the time to do it.

Pesky weather!

For the past few days I’ve been trying to get over to Brico Depot and Leroy Merlin to buy the materials I need to finish off my utility room and get started on building my new cloaks cupboard. Ideally I only wanted to make a single trip to both suppliers but up to today I wasn’t able to.

The reason has been that the worktop I need for the utility room only comes in a length of 3 metres and that’s too long to fit into my car even with the back and front passenger seats lowered, so I’d have to transport it in my large open trailer. It’s bad enough having to do that with the risk of damaging it but at the very least it needed a dry day, which we haven’t had recently.

We haven’t had heavy rain as such. Instead we’ve had constant thick mist lasting most or all of the day making everything dripping wet, especially my trailer, but today it cleared enough this afternoon for me to give it a go. Fortunately it went OK.

First I went to Leroy Merlin to buy the wood I need for the front panel for the cloaks cupboard. Leroy Merlin is the only place advertising wood in 2.5 metre lengths (the others only go to 2.4 metres which is not long enough) and I was shocked at the price. Four lengths of 2.5m x 20mm x 90mm (I was originally going to buy five to make sure I had enough but decided not to) cost 18,90€ each, but I had no choice.

Then I went to Brico Depot where I picked up the worktop, a small sink and a waste system. I’d banked on some help loading the worktop onto the trailer as its weight is too much for one person but the bloke who helped me wasn’t much help as he’d hurt his arm and could hardly lift anything. Despite this we got it on and I then protected its vulnerable bits with sheets of cardboard from the packing cases that the utility room units had come in, which I’d taken with me.

null

null

It stayed dry enough during the drive home and I managed to get it off the trailer by myself and into my living room where it’s now standing. So now I’m all ready to crack on with my utility room and if all goes smoothly, should have it finished fairly quickly. I want to get it done before I start on the cloaks cupboard as I don’t like having two or more jobs on the go at the same time even though sometimes it’s unavoidable. When both jobs are finished I’ll at last, after all these months, be able to start emptying my stuff out of storage.

What beauties!

After looking at various alternative designs and suppliers, I ordered the doors for my proposed new cloaks cupboard a week or so ago and have been waiting for them to arrive. Well, today was the day and after I’d been told by the delivery company that they’d probably be with me this afternoon, in fact they arrived quite early this morning.

And what a pleasant surprise I got. But firstly a few pictures starting with the alcove in which I’ll be building the cupboard.

null

Next my original plan for the cupboard from when I designed the house. I always wanted to have bi-fold sliding doors but initially my idea was for them to be solid white in form and not up to the full height of the alcove.

null

Since then I decided to make them natural wood to match all of the other woodwork in the house, and as I want to fit possibly two full-width storage shelves, and as less than full-height doors would restrict access to the upper one, I decided to make them the full height of the alcove. And here they are this morning standing together leaning against a wall in my living room.

null

What beauties they are! In France this louvre design is called ‘Persienne’. I now know that I’ve made the right choices and can’t wait to get cracking on building the cupboard structure in which to mount them. They’ve come all the way from Poland and an added bonus was when I removed the plastic film in which each one had been wrapped I was treated to the gorgeous smell of freshly cut wood. What a way to start a Monday morning 😀

Deliveries

Waiting for them to arrive is one of the most frustrating things about living in France. With the exception of Amazon and a few other companies (Screwfix, a UK owned business in the same group as Brico Depot, can also be trusted) French companies are notoriously unreliable in meeting delivery dates for orders placed on line.

You can end up wasting lots of time waiting for them to arrive because you know that if you’re not there when they do they’ll probably be taken away again and may then not be redelivered for several more days. If ever. There was one instance in my old house when a garden roller I’d ordered was sent all the way back to the supplier because I wasn’t there to sign for it – to Germany! You couldn’t make it up.

I have, or had, two recent outstanding orders. One was for the floor and wall cabinets that I’d ordered for my utility room. Castorama (another UK owned company in the same group as Brico Depot) let me know just after lunch on Tuesday that they’d arrived earlier than expected in its Limoges store but I was still waiting to hear about the doors for my cloaks cupboard that I’d ordered (from a French company) that were supposed to be delivered at about the same time.

I decided to dash up to Limoges to collect the cabinets that same day as there was clearly no chance that the doors would be arriving that afternoon and although I arrived an hour earlier than my appointment, I was pleased to find that my order was already ready for collection and was able to load up my car to head back immediately. That meant that I could assemble the cabinets on Wednesday ensuring that I’d be present in the (unlikely) event that the doors turned up, and they’re now all ready waiting to be fitted in the utility room

null

null

But I can’t go ahead and fit them because I need a worktop, small sink and some plumbing fittings to be able to do so and the Catch-22 is that I can’t go and get them because if I do, the doors might turn up. I’ve already received the news that the doors are ‘out for delivery’ and here’s the tracking information for them as of this morning.

null

You’ll note that there’s no ‘estimated delivery date’ so in effect the information is totally useless. As a result I’m still having to waste time sitting around waiting for a delivery that probably won’t arrive. I’ve not totally wasted the time as I’ve caught up with a couple of house-build videos which are now well overdue. They both err… date back to last February. Doesn’t time fly 😕

One of my better ideas

One of the things I suffered from very badly in my old house was a lack of storage space. In fact there was hardly any to speak of and at the time I moved out there were still unopened boxes of items that I brought with me from England when I moved to France nine years previously.

I was determined to remedy this in my new house and some might say that I’ve gone overboard in creating new places to store stuff and maybe they are right, although my own view is that you can really never have too much of it – storage space that is. That’s why I put as many storage cupboards into the kitchen as I could fit in and also installed the floor-to-ceiling wardrobe and storage units in the two principal bedrooms.

I’m waiting for the floor and wall cabinets that I recently ordered for the utility room (the same style as the kitchen) and at long last yesterday I ordered the four doors for the cloaks cupboard which will also contain a full-width shelf and a bank of several more smaller ones providing yet more storage space. And I also ordered yet another cabinet which arrived today.

One thing that I did have in my old house that I don’t have in the new was a workshop. This was a boon because in it I had a sturdy bench on which I’d mounted a vice, a grinder and a drilling machine. I’d also installed racking for my tools and the materials that I’d accumulated for the various types of work that I was engaged in plus the maintenance of my aircraft and cars and although I’ve extracted several tools that I’ve used while working in my new house, much of this stuff is still in storage.

This situation can’t go on forever. I need to empty the storage and although I’ll inevitably end up chucking some stuff away, I’ll have to find new homes for the remainder. I’ll have my metal ‘abri’ in front of the house until I can get around to building a garage and that will be suitable for some stuff, but as it’s scorching hot in summer and cold and damp in winter, I won’t be able to store items like power and other tools in there.

I’ll be able to put some items in the floor and wall cabinets that will shortly be in the utility room but I didn’t think these would be suitable for the larger, heavier items like saws and drills and when I started looking for an alternative, I had the idea of using a metal office-type cabinet with internal shelves. I found one in white which was delivered in two cartons today and the following images show it after assembly and in place in the utility room.

null

null

null

null

null

I’m absolutely delighted with it. One of the businesses that I had before coming to France sold office furniture and equipment on line, including cabinets like this. Customers didn’t have to assemble those, of course, but the quality of this cabinet after assembly is certainly in the same sort of league. And it’s also lockable, which is handy.

I’ve already placed my electric Singer sewing machine which was always a problem to store on its floor below the bottom shelf and I’ll soon be moving many other tools into it as well. In fact, if I had more space in my utility room I’d probably even buy a second one but maybe on second thoughts it’s lucky that I haven’t because I’ve got to stop somewhere 🙂

Running jump into 2024

No time to waste as after a two-year break due to Covid I’ve now booked another short stay in Hurghada on the Red Sea in Egypt at the end of the Winter and I want to get as much done as I can before I leave. I would like to have everything inside the house finished so I can get straight on to interior furnishings and the garden when I return.

But that might be too much to ask as not only have I got to wait until the second week of this month for the wall and floor units for the utility room to be delivered, but I also found out on Christmas Eve that the folding doors that I’d chosen for my cloaks cupboard cannot be delivered before 29th February at the very earliest.

So I’m pretty much stymied at the moment except for one thing. My lovely neighbour had to install a new ‘système d’assainissement’ (septic tank system) for her gite complex and as I think it will also have to serve a house that she and her partner propose building in the future, its tanks are pretty big. So some very large holes had to be dug to take them and as most of the volume created would be taken up by the tanks, I reasoned when work started that there would be quite a bit of earth left over.

And there is, and to cut a long story short, she let me know over Christmas that I could have as much of it as I want, all of it even, so long as a small amount of topsoil is left for her own use. Here are some pics that show what I’m talking about.

null

null

null

I always said that when the work on my house was completed, there wouldn’t be enough earth available to back-fill to create a platform around it with a gentle enough slope and I was right. There are several areas around it which could take quite a bit more earth to reduce the slope of the ground as it falls away fom the house, especially at the northern end and the back, and there’s also an area at the front of the plot, more or less where I originally placed my caravan, which could do with being built up and levelled. The areas I’m talking about are shown in the next image.

null

The workmen have offered to run the earth over from my neighbour’s property during this week and although I’ll ask them if they want to lay and level it for me, I doubt they will as they’ll probably have another job to go onto. But hopefully they’ll be able to drop it in the areas marked with X’s. It’s an opportunity that will be a win-win for everyone and although I’ll have to keep a watchful eye that I’m not having loads of old sub-soil and rocks being dumped on me, so long as I get enough topsoil to cover the areas I’ve marked after they’re filled, it’ll be a good result for me.

In other news, I think I’ve found a way to get around the delay on the doors I need for my cloaks cupboard. It appears that I might be able to source suitable doors from a couple of sources as well as a choice of folding door kits. So I might be able to make the doors up myself, in which case I could get cracking on them within about ten days. That’ll be more like it 🙂

Oh, and by the way, a Happy New Year to all my family and friends wherever they are who are following my adventures here in France.

‘Cellier’ setback

Maybe, maybe not. The following image shows my original plan for the main wall in the utility room in my new house.

null

I wanted a worktop under which I’d have my washer/dryer and my freezer with a 60cm wide floor mounted unit at the end butting up to the heat pump. The floor unit wouldn’t have a back so as to give free access to the hot and cold water pipework.

Three 60cm wide wall-mounted units would be mounted directly above to provide ample storage together with the floor-mounted one for household items, tools and suchlike and a small sink would be fitted in the worktop immediately above the floor mounted unit.

There was a problem, however. The heat pump was installed further away than I’d anticipated from the wall on the right of the above image and the main pipework, including the main supply into the house, extended much further to the left of the heat pump unit than I’d ever imagined. This meant that there was not enough room for the 60cm wide floor-mounted unit, thus throwing out my whole plan.

null

The space available was more than wide enough to take a 40cm wide floor-mounted unit but although units of this width are readily available, an internet search revealed that it would be almost impossible to find a small sink that would fit into it other than something very mickey-mouse that would be well-nigh unusable. The space would, however, take a 50cm wide unit – just!

null

But there was a problem with that. Not that many suppliers offer 50cm wide wall and floor-mounted units, and Brico Depot, my preferred kitchen unit supplier, offers none at all, just 40cm, 60cm and 80cm if you want the wall and floor-mounted to match as I do.

There are some suppliers that do, the most notable being Ikea, but I have a problem with that. The closest Ikea depot is a long way away in Bordeaux and not only that. I’ve only ever fitted one Ikea kitchen, the one for my friend Val in the Languedoc, and I wasn’t at all impressed by either its design or quality, so I didn’t want to go that route if I could avoid it.

So I was left with a quandary that found me searching the internet ever more frantically, a search that eventually yielded a surprising result. Brico-Depot is part of the Kingfisher group based in the UK that has another subsidiary in France, Castorama.

I’ve known for some time that both Brico-Depot and Castorama offer kitchen furniture ranges which have some overlaps but what I was very surprised to find was that whereas Brico-Depot offers no 50cm wide units, Castorama does, and specifically the units that I’ve fitted in my kitchen.

My original plan was to install less expensive units in my ‘cellier’ but this was of minor importance compared to having units of the size that I needed. My internet search revealed that no Castorama store within any reasonable (unreasonable even) distance from my home was declaring any 50cm wide stock except Castorama in Limoges who not only had several of the 60cm wide units in stock but also one each of the 50cm wall and floor units.

So after making one final check yesterday morning to ensure they were still there, I headed off up to Limoges not long after sunrise to make sure that I’d be the first in line to grab them. But I was to be thwarted. In true French fashion, the reported stock of 50cm units was found not to exist after all and given how long I’ve now lived in France, I was not wholly surprised. But all was not lost, however.

I was told that I could order them (which I could have done on my computer at home if I’d known) and they’d be available for me to pick up in 10-12 days time. This won’t be a disaster as instead of working on my ‘cellier’ I’ll now switch to building my cloaks cupboard, which was to be my final construction job after my ‘cellier’ work.

And the other thing was that one or two other items were the odd euro or so cheaper than in Brico Depot, so I picked them up while I was there, as well as a slightly damaged plinth for the floor-mounted unit which I got at a huge discount.

No problem there, as it’s long enough for several floor mounted units and as I’ll only have the one 50cm unit, most of it will be discarded anyway including the damaged bits. So on balance the trip was worth it, but I’ll have to wait a little bit longer, unfortunately, to finally finish off my utility room.

That’s better

I just re-jigged the washing machine waste and replaced the manifold that was too long in the utility room and now things are exactly as they should be. I wasted a couple of PVC fittings in the process because the new adhesive that I purchased from Leroy Merlin was flashing off much to fast.

You only had to touch the parts being joined together and they immediately became locked rock solid. I had to replace the two bends making up the offset for a third time as when they locked they were not on the correct angle. Luckily I still had some old adhesive that I got from Brico Depot a long time ago which cured much more slowly and allowed me to do the job.

The washing machine waste is now positioned far lower with a longer inlet and now there’s no chance that it will ever overflow.

null

I removed the 4-outlet manifold and replaced it with the 3-outlet version.

null

null

This has allowed far more room for the freezer which can now be pushed closer to the wall so it will not protrude from under the worktop.

null

I can now go ahead and order the floor and wall units, worktop, small sink and a mixer tap to finish the room off and make it exactly as I want it 🙂

More ‘cellier’ work

Having painted it, I’ve been pressing on as fast as I could to complete the work in my ‘cellier’ (utility room). The main reason for this is that until all of the preparatory work was completed I couldn’t install the floor and wall units that I have planned and until the storage that they will provide is available I can’t empty out all of the items that I have in storage that I’ve now been paying for for 30 months.

As well as painting its walls and ceilings, the plumber left me with something of a problem in the far corner of the room where I want to have my washing machine. The pipework he left behind was a bit of a mess to say the least because he’d committed the plumbing sin of having pipes crossing over, as shown in the following image.

null

He’d included a ‘P’ trap for the washing machine waste to feed into but I’d told him that I also wanted to fit a worktop with a sink along the same wall that would also need a hot as well as a cold supply. He evidently hadn’t thought at all how best to arrange these together with the shared waste outlet to the septic tank and what he left behind was actually pretty awful.

He placed the pipe for the sink waste on the left whereas the sink will be off to the right and by having the washing machine waste crossing in front of the hot and cold water supplies not only would it be tricky to run the three connections up to the sink but it also meant that it would be impossible to push the washing machine as far back against the wall as one would want. This would leave a lot of the machine protruding from beneath the worktop which would not only be unsightly but would also make the front of my lovely new Indesit washing machine prone to knocks and potential damage.

So before I could continue on to fitting the floor and wall units and the worktop I had to address this problem and come up with a completely new layout of the piping. The next image shows what the pipework in the corner now looks like.

null

In fact I’m thinking about altering it again because by placing the washing machine ‘P’ trap on top I’ve had to cut down the tube that the rubber outlet pipe from the washing machine pokes into to a point where the water surface inside is closer to the top than I would like. By redoing the arrangement and dropping the ‘P’ trap in question down lower I could avoid any possibility of water overflowing when, say, the machine is pumping out and the sink is being emptied at the same time. So that’s what I intend to do after Christmas and it’ll only take a short time to accomplish.

As the image shows, I’ve completely separated the cold and hot supplies to the sink and here’s a shot of the ends of them to which the mixer tap flexies will be attached. When I cut the pipes to do the re-jig I kept the connectors that the plumber had fitted to save a few euros and also have connectors that I knew wouldn’t leak.

null

Here’s a view of the complete new arrangement.

null

When the plumber fitted out the separate toilet we agreed that we should abandon the outside tap that I’d originally proposed to have on the front corner of the house and move it further round to the side. The original connection at the manifold in the ‘cellier’ was therefore abandoned and he ran a new connection for it. Whether this was the reason I do not know, but one manifold outlet now remains unused and blanked off, as shown in the next pic.

null

The problem with this is that the manifold has four outlets when it only needs three and extends further to the left than it needs to just preventing the freezer from being pushed back against the wall. I’ve found that Leroy Merlin offers a suitable smaller replacement for only 9.50€ so that’s another job I’ll be doing as soon as Christmas is over.

null

But that’s it for now and I’ll be taking a day off tomorrow like everyone else in France. But Christmas only lasts for one day here so like everyone else (almost) in France I’ll be back to work on Tuesday.

Happy Christmas everyone. Enjoy the break and I’ll be back next week.

Special day

I began fitting ceiling coving throughout my new house in June and began painting the interior starting with the kitchen in the last week of that month. Since then I’ve installed the complete kitchen, the hand-basin in the bathroom, a couple of wall-mounted bathroom cabinets, the shower screen, the floors in all of the bedrooms, a floor-to-ceiling fully-fitted wardrobe and storage unit in the larger two, 6 exterior lights and 43 LED spots throughout the whole of the interior.

I’ve also had to paint the ceiling and walls of every room with a sealer-undercoat and top coat and today is special because at last almost exactly six months to the day, I’ve now completed the task by finishing off the ‘cellier’, the utility room that houses the heat pump unit and will also be the home for my washing machine and freezer.

null

null

null

It wasn’t a job that I was relishing or looking forward to mainly because if I’d known how much pipework would be associated with the heat pump I’d have painted the room before it was installed. But I left it too late and was left with the unenviable job of trying to paint around all the plumbing as I just couldn’t face leaving any part of the room as bare plasterboard. It took a lot of masking but I’ve managed it to a point where I’m pleased with the results.

The room isn’t finished – I’ve got to install at least one worktop and wall and floor storage units as well as make some alterations to the plumbing to connect a small sink and allow the washing machine and freezer to fit closer to the wall than they originally could. But with the painting done the worst is over (I hope!) 😕

More heat pump stuff

Here’s another one for all the heat pump cynics.

I can’t do an exact date-wise like-for-like comparison with my old house at Plazac and my new house because the former’s billing ran from mid-September to mid-November (2020) and my new house’s will be running from end October to end December 2023. However, I can make some very accurate estimates.

Here are the actual units consumed for two periods for my old house.

19/11/20 – 18/01/21: 1771 units
19/09/20 – 18/11/20: 1557 units

A good assumption is that the units consumed 19/10/20 – 18/12/20 will be the average of the above: 1664 units

My new house has a smart meter and exact figures are therefore available.

29/10/23 – 18/12/23: 636 units
Estimated 29/10/23 – 28/12/23: 763 units

763 units for the new house is 46% of the figure for the old (1664) and this at a time when the major demand has been for heating and the house has been toasty warm the whole time with the indoor temperature never falling below 22 degrees C day or night.

My old house (a poorly unsulated converted barn) was never uniformly warm and although I had background heating using electric convector heaters, the main source of heating was my wood burner. Obviously the cost for this was over and above the cost of electricity which was only used for lighting, oven cooking, hot water and running household appliances.

The figure for my new house is for everything – lighting, heating, cooking, the lot.

These are the numbers for energy input and output since installation.

Electricity input: 387 kWh
Energy output: 1607 kWh
Ratio: 4.15

So the heat pump is delivering over 4 times the amount of energy required to run it, which I find astounding. The numbers speak for themselves and it goes without saying that I am delighted with how the system is working 😀

3 bedrooms

Is what I now have, all usable. I had to do quite a bit of ‘rearranging’ of stuff, moving materials and tools around and disposing of rubbish before I could get working on bedroom three. And when I eventually was able to, it turned into a nightmare as I’ll explain. But first a couple of pictures of the results.

null

null

Once again, the camera hasn’t quite caught the colour which has a slight dusky pink tinge to it, making it colour-coordinate exactly with the floor covering and the wall plinth. But you might like to know why it was a nightmare getting to this point, so I’ll explain.

Regular readers may recall that two plasterers were involved in finishing the internal walls and partitions in my house, covering nail heads and the joints between the plasterboard drylining sheets. I wasn’t that impressed when I first saw their work and quite honestly I’ve become less happy with what they did the more I’ve been involved in decorating over it.

Apart from areas that they missed entirely (there’s an area from floor to ceiling in the ‘cellier’ for example) it’s now evident that for much of their work they used old, dead plaster. Unlike fresh plaster straight from the pack that sets very quickly, old plaster takes much longer to cure but usually eventually does so.

Dead plaster, on the other hand, mixes with water and looks like fresh plaster even when it has dried. However, it doesn’t undergo the chemical reaction that makes it cure and becomes soft again if water or a water based material, such as paint, is applied to it. The result is that if the paint is applied using a roller, the roller’s suction removes the ‘plaster’ as it passes over the surface.

This has happened in all of the rooms in which I’ve painted using a roller and I’ve had to make good areas of both the walls and the ceilings. However, in bedroom three the areas involved were huge, both on the ceiling and the walls and especially on the coloured wall.

This is why after making the coloured wall good, it looks patchy in the above pictures. It was made worse because I achieved the colour by adding white and a dash of red to a can of beige and over the two or three days in which I did the work it was impossible to keep the mix and therefore the colour totally uniform. It will have to do however.

This is the price you end up paying by sub-contracting work out to sub-standard workers but at least now I’ll be ready for when I can expect the first visitors to stay over in my new house.

Finishing off today’s story

Bedroom two isn’t totally finished. I still have to adjust the doors of the Ikea ‘dressing’ and fit the handles and I’ve also got to fit the threshold piece in the doorway to cover the gap between the tiles in the corridor and the new bedroom floor. But those are jobs for tomorrow as it’s been a very long day and I’m tired. Here’s how the room now looks with all of the wardrobe doors on.

null

null

null

null

Don’t forget that the wall colour isn’t a dark yellow as it appears in the photos – it’s a very warm, rich peachy-orange. I love it. It’s warm, bright and modern just as I wanted and it more than meets my expectations, so I’m very happy with the results 😀

And again, my friends

I’ve been busy for the past week or so working on bedroom two which I expect to finish completely tomorrow. I’ve fitted the laminate floor and plinth, the Ikea ‘dressing’ as it’s called here, the ceiling coving that was left still to do and today I finished painting the walls. Here’s where I got to this evening.

null

null

null

I’ve wanted to use colours throughout the house that are warm, bright and modern and also reflect the area in which I live. I’ve never ever previously used colours as bright as in the two bedrooms I’ve painted so far, and I’d never have used them if I’d stayed in the UK, but here they seem to work perfectly. What do you think? Have I gone right over the top this time?

In fact I can’t get a shot that properly shows the correct colour. Due to the limitations of my phone camera it appears to be a rich golden yellow in the first two images, but it’s not. The final image above was taken with my Nikon Coolpix and still isn’t quite right, on my computer screen anyway, but is the closest I’ve managed so far, which is actually a warm, rich, peachy orange.

I love it. What do you think?

BTW, the light patch in the third image was the light from the low sun streaming through the window and the bars that show in all of my bedroom images with artificial lighting are due to mains frequency strobing of the LED spots that the phone camera is supposed to cut out but doesn’t.

An unexpected honour

A few weeks ago I was approached by the Daily Telegraph newspaper in the UK to write an article about my house-build project after a comment I’d left on an article in their Property section. It’s taken a while for it to happen but it was finally published today and seems to have started a lively debate among the ‘Grand Designers’ who think I won’t win any architectural awards, the ‘Armchair Developers’ who think I don’t know anything about how to get a house built and the lovely rest of the world who realise that it was all just about realising my dream to build a house for me to live in.

null

The image above links to the article – I don’t know if you’ll need a subscription to DTOnline to read it though. If so, here’s a link to a copy that I’ve made for My Trike. It looks a little different to the real article but the copy and images are the same except I’ve substituted the DT’s picture of Fleurac by one of my own as theirs wasn’t of Fleurac in the Dordogne at all.

DTOnline house-build article

I think it’s been an amazing experience and a privilege to be able to share it with so many others.

Outside in

The gentleman came this morning to test my house to ensure that it meets the environmental standards that were claimed for it in my ‘permis de construire’ (building permit), in particular those relating to insulation, heat loss and draught exclusion. To do that he blocked up all of the air vents and sealed the front door with an airtight cover incorporating a machine with a large fan connected to a lap top computer.

The house was then pressurised and measurements taken to assess how much air was escaping taking heat with it and also the potential for cold draughts entering the house from outside. The result was astounding – astonishingly good in fact – but not surprising in a way given how warm the house always is. The internal air temperature never drops below 23 degrees C with a setting of 24 degrees on the wall thermostat and it’s especially noticeable as the days become cooler when you re-enter from outside.

However, he was kind enough to take me round afterwards to show me where there were a couple of gaps which are allowing cold draughts to come in from outside. These will be simple for me to fill with silicone etc while I’m doing my decorative work and will increase the thermal performance of the house even more by preventing any cold air whatsoever entering the house. It goes without saying that I’m absolutely delighted!

On the subject of outside in, I recently reorganised the house since installing the wardrobe and storage space in bedroom one to make everything more tidy and get more space back. As part of the process a large space was vacated in the dining area where I originally placed my inflatable bed which will eventually be taken by the dining room table and chairs that are still currently in storage.

The space is plenty large enough to take the large outdoor table that I moved up onto the terrace area a few weeks ago together with six of its eight chairs, the last two remaining outside next to the small round table that I also moved up from outside the caravan. Sure enough, the table and chairs fit in the space beautifully and with the addition of a smart new tablecloth don’t look out of place at all.

null

null

null

Brilliant! For the first time in several months I’ll now be able to entertain friends and visitors. The official hand-over of the house keys is scheduled to take place any time now so who knows, maybe the first occasion will be a small house-warming party 😉

The awesomemost…

I’ve built quite a few furniture units in my time for kitchens, bedrooms, bathrooms and more, but only one set of Ikea. That was for my friend Val in the Languedoc’s kitchen and although it looked fine when finished, I wasn’t particularly impressed with its build quality. I’ve now finished the Ikea wardrobe unit in bedroom one and although I still think that Ikea has a few quality issues, it has to be the most awesome unit that I’ve ever built and installed.

Everything went together exactly as it was supposed to, except the hinges on one set of doors conflicted with a shelf and I had to discreetly notch its edges. I could probably have done the whole job a bit quicker if I’d been prepared to risk making mistakes but I wanted to avoid that at all costs. It’s exactly how I saw it in my plans and I love how it’s turned out. Here are a couple of shots of the cabinet interiors.

null

null

The unit is high and it didn’t help adding an extra 2.5cm of timber on the floor below it to allow for fitting the floor plinth. The main consideration is the height of the clothes hanger rails. The one on the left is the ‘male’ hanger and I can reach that fairly comfortably but I purposely set the ‘female’ one with the longer drop on the right slightly lower to allow for ladies of shorter stature.

Finally, here are the shots of the finished unit with all of its doors on.

null

null

null

null

null

The one thing that I’m especially pleased about is how true the door mirrors are. You’ll notice that the reflections of straight lines in adjacent doors are hardly distorted at all which I think is important because when standing in front of a junction between adjacent doors you want to see your whole reflection, albeit with a line down the middle, and not have a chunk missing because the two doors aren’t flat and parallel.

And it appears that although I had to go all the way to Nantes to pick up the ten mirror doors that I needed for the two units in bedrooms one and two, in fact I had a stroke of luck. I checked on Ikea’s French web site today and not one store, including Nantes, now has them in stock and in fact it appears that Ikea might have dropped them. My reason for thinking that is that out of interest, I also checked Ikea’s UK web site and exactly the same applies there too.

The units for the two bedrooms have together cost a little over 2000€, so not cheap compared to having plain white doors. However, I know from my researches that the only alternative was to have the units custom built and that would have cost a minimum of twice as much and even more with the level of internal fit that I’ve done. So it looks as though things worked out well for me for a change 🙂

It’s finished

Bedroom one is now completely painted. What do you think? Have I gone completely mad with the colour this time?

null

null

null

I don’t know why, but I always saw the wall behind the bed in this room being a golden yellow. I’ve looked on the internet and seen some beautiful gold, yellow and autumn brown bed linen and having lived with ghastly pink floral patterned duvet covers that I inherited from my marriage I always knew that it was time for a change. I think, or at least I hope, this is taking me in the right direction.

Now all I need to do is assemble the interior of the Ikea unit and fit its doors. The latter could be quite challenging given their size and weight.

Done it!

Over the last couple of days I pressed on with fitting the Ikea unit in bedroom one but I didn’t want to keep posting part-finished shots of the job and have waited until today when it’s finally complete to show how it’s come out. The outstanding tasks after last time were just to fit the floor plinth across the front of the final unit, seal the wall gaps at the ends, fill in the gap between the top of the unit and the ceiling and fit the ceiling coving but these were fiddly and time-consuming.

But I’ve finally finished and I’m very happy with how it’s turned out.

null

null

null

null

null

I’m especially pleased with the tiny bit of coving at the end of the unit that juts out from the wall. I wasn’t very optimistic in the beginning but in the event it turned out OK I think.

null

The room is now ready for painting. I bought the colour for the wall that will be behind the bed but apart from saying that it’s bright and warm I won’t say what it is. I’d like to get the room painted tomorrow but I don’t think that it’ll be possible because first I’ve got to seal the coving and even if I get that done in the morning it probably won’t be dry enough to apply a top coat over it until at least the evening. But anyway, I’m pleased with where I now am and we’ll see how things go tomorrow.

Amazing statistic!

Out of interest, I’ve just done a comparison of my electricity consumption in my new house (heat pump for hot water and heating, LED lighting, electricity for cooking and everything else) and my old one (steatite electrically heated hot water tank, electric background heating, electric oven but only used occasionally, some LED but mainly halogen and incandescent lighting).

Old house: 19/09/20 – 18/11/20, 1557 units consumed (26 units/day)

New house: 12/09/23 – 26/10/23, 246 units consumed in total of which the heat pump accounted for 34 units. Thus ‘all other’ accounted for 212 units in 44 days (5 units/day)
Heat pump: 19/10/23 – 26/10/23, 34 units consumed (5 units/day)

Thus my total daily consumption in my new house has been about 10 units/day ie under 40% of my consumption in my old house at about the same time of year.

I find this staggering especially bearing in mind that my old house was always cold, especially during the day, and had to be additionally heated by my wood burner whereas the new house has a constant room temperature of 24 degrees C throughout the building and hot water at 55 degrees C.

I think the figures show that modern heat pumps really do work so long as the houses in which they’re installed have been designed around them, like mine has been. Obviously I’ll keep monitoring the figures but I don’t think I’ve made a mistake – in any sense of the word 😀

Coming along nicely

The Ikea Pax unit in bedroom one that is. I’m not rushing things because the two units for bedrooms one and two have cost a lot of money and I don’t want to make any mistakes. I also want them to look good when I’ve finished.

Today I got all three of the cabinets in bedroom one fully installed and permanently fitted in place. I was extremely lucky because they went in with no gaps at either end and look as though I must have made the alcove in which they’re fitted to the exact width to take them. But I didn’t. It was a lucky accident.

As I mentioned previously, I raised them by 2.5cm so I can fit the wall plinth from the floor across their fronts to match the rest of the room. I did this by laying two lengths of timber on the floor inside the alcove below the fronts and backs of the units.

null

null

The chance of the timber moving in the future was minimal unless there’s an earthquake but I made sure that couldn’t happen by attaching it with brackets to the backs and fronts of the units. These will not be seen as they’ll be under each cabinet’s floor.

null

null

All three cabinets have been firmly fixed back to the wall so they can’t try to topple when their doors are opened. They have also been joined together in the same way as my kitchen cabinets were using the special screw-together joiners that Ikea provided with each cabinet. Here’s how they looked at the end of the day.

null

null

The next tasks will be to fix a fill-in panel between the cabinet tops and the ceiling to which I’ll be able to attach coving, together with the floor plinth. Then it’ll just be a matter of painting the room, fitting out the cabinets and adding the doors to complete the bedroom and make it useable. Then on to bedroom two to do it all over again.

Ikea – pressing on

But not quite as far as I’d hoped. The missing narrow unit that I needed for bedroom one was delivered on time this morning and I wanted to get all three assembled and fixed in position by the end of the day. Unfortunately after I’d had my lunch I sat down in a comfortable chair that was so comfortable I dozed off and ended up losing quite a lot of time 🙂

I got all three of the units assembled and only when I came to position the narrow one did I realise that Ikea had incorporated a method for attaching the units to the back wall so they can’t topple forward that allows you to drill the wall and fix them without having to remove them again. I then found though that I didn’t have enough of the shorter fasteners that I needed for the job so had to pop over to Brico Marché in Le Bugue to get some more.

By the time I got back it was too late to finish the job but here are a couple of shots that show where I got to today.

null

null

First Ikea unit

The first part of the Ikea Pax wardrobe and storage unit in bedroom one. It will be fitted across the full width and to the full height of the alcove that I built into the wall and will consist of two units 1 metre in width and one of 0.5 metre. The four boxes that took two of us to load into the van at Nantes were the 1 meter wide units for the two bedrooms, one and two, and this is the first of those.

It’s quite fearsome and Ikea recommend that two people are involved in building it. However, I’m doing it just by myself and although very heavy to lift and move due to the thickness of the ‘melaminé’ board from which it’s constructed, it’s no more daunting than other projects I’ve taken on. It’s height is the most impressive thing about it. I took a shot of its components early this morning (around 6.00 am) when I first started.

null

It’s sides and back all come connected and folded together wrapped around with securing bands so you don’t have the choice of moving it piece by piece. When you have stood it vertical you remove the bands and unfold them like a giant birthday card and having done so add front and rear bottom rails to stiffen the structure followed by its top and bottom. I’ve only fitted its top for now as after moving it into place I have to raise it by a couple of centimetres so I can fit the floor’s wall plinth across its front. The next shot is of it standing in position waiting to be raised.

null

I’ll be nipping out to Leroy Merlin after typing this to buy four lengths of 2.5cm thick timber (2 per room) on which to stand the cabinets in each bedroom and raise them to the required height. When the whole job’s finished I’ll probably need a long ladder to place things on the top shelves… 😕

Two very fraught days

I hired a van from Leclerc in Trelissac to drive to Nantes on Friday (20th October) to pick up the two wardrobe and storage units for bedrooms one and two. The vehicle was the smallest they have for hire, a Ford Transit of 8m3 capacity and knowing the length of the items I was picking up I was concerned that it might be a bit too short and that perhaps I might change my order for a larger vehicle. However, there wasn’t one at either of the two local Leclerc depots so I decided to take the chance. Little did I know that this would be the least of my worries.

null

The total distance there and back was a bit over 800 kms and the little van proved to be more than up to the job although the first problem I encountered was the weather. It was cloudy and already raining by the time I left Périgueux at around 9.15am and things went from bad to worse as the journey progressed. Rain with high wind gusts had been forecast and this proved to be an understatement with the conditions on the main roads being a nightmare with the amount of spray being thrown up from the wheels of trucks making passing them a distinctly less than comfortable experience.

However, I arrived at Ikea in Nantes at around 2.20pm and was thus able to meet my intended pick-up schedule. The shopping centre that Ikea is located in is huge and impressive with an enormous car park at ground level under the centre’s main structure and on entering the latter you have to ascend moving ramps to get to Ikea on the first floor. They refer to it as levels 1 and -1. Here’s a shot I took of the foyer with the ramps leading up to Ikea.

null

On entering Ikea I had no idea where I was supposed to go but there was a small arrivals desk just inside where I entered the store and the lady standing there very kindly took me to where I could pick up my purchases. The young chap there said everything except one item was available and for that I’d have to go to another Ikea depot, the address of which he gave me. Luckily Waze, the satnav on my mobile phone, recognised it immediately as it had the address of the main Ikea store which I was then in.

I was staggered when the young guy wheeled out my purchases. Because of their lengths the ten mirror doors were laid across two large trollies and the remaining items the same on two more. I said I’d need help to load them onto my van and another young colleague kindly agreed to do so. We had to take two lifts to descend to the car park because of the widths of the loaded trollies and when we got down there he suggested that he would wait while I brought my van over and parked in the ‘mother and child’ bays close by to load it.

So off I went to find it, but easier said than done. I found the van some way away via a tortuous route and then had the task of trying to find my way back to the lifts where the young chap was waiting. I ended up driving around the car park several times before I finally noticed him waving at me in the distance. OK, I thought, but it still took me another couple of goes before I found the right aisles in the car park that took me back to where he stood.

With the volume and weight of several of the items it took the two of us to load the van. Luckily everything just fitted in for length but I was amazed by the shear volume involved. I was already then beginning to think about how I would be able to unload the van at the other end as it would be night time, I’d have no one to help me and I’d have to get it all off so I could return the van early the following morning. Here’s how the interior of the van looked after it had all been loaded, and don’t forget there was still one more item to come.

null

null

I had an horrendous drive home. It was fine but still blustery when I left Nantes in the late afternoon having picked up the final item at the other Ikea depot. It was the longest of all, too long to go directly in the van but fortunately it fitted in diagonally placed on top of all the other items. As I headed south and it became dark I drove back into the stormy weather again. The rain wasn’t as hard as in the morning but the spray from other vehicles was just as bad in places and was exacerbated by the headlights of oncoming vehicles.

It was a terrible driving experience but there was worse to come. I was in a stream of vehicles on the main road heading south in the Charente when a large wild boar sprang out of the woods on the right hand side of the road, right in front of my van. With all of the vehicles to choose from why did it have to choose mine? I slammed on the brakes which were remarkably effective given the state of the road and the weight I was carrying and the animal crossed in front of me over to the other carriageway.

There happened to be no oncoming traffic at the time but instead of continuing it stopped and turned back again, right in front of me. I could do nothing to avoid it but luckily I think I only gave it a hard tap. But anyway, when I got out to check there was no sign of it and there was no apparent damage to the front of the van, so I continued my journey home where I eventually had the job of unloading the van at around 10.30 pm in gusting wind and rain showers. I succeeded with difficulty in getting the items off that took two of us to load in Nantes and here’s how the main part of the load looked afterwards on the floor of my living room.

null

And here are the remaining small items that I put separately in bedroom one.

null

But my nightmare still wasn’t over. It continued when I returned the van to Leclerc. The first thing was that they said the van was ‘dirty’ and demanded a 50€ ‘cleaning’ surcharge. I said I’d never heard of such a thing before. Usually when a hire vehicle is returned it’s prepared for rehiring by the hire company. Now Leclerc expect you to do it for them apparently.

The vehicle only had normal road grime on it and I said that I’d take it away and clean it myself but that I wouldn’t pay any additional hiring fees while I was away. I ended up taking it to the car wash in the Leclerc facility and that cost me an additional charge of over 11€. Nearly half of that was wasted as you have to buy ‘jetons’ (tokens) to go in the machine and the minimum you end up paying for covers two washes at least. Not much use to me living in Fleurac.

But it wasn’t to end there, far from it. When I’d picked up the van I’d mentioned how many knocks and dings had been noted on its sheet, none of which had been fixed or repaired as all were minor or cosmetic. When they checked the van after I’d washed it I was called outside and told that there was a problem. It was a stone chip on the front bumper about the size of a little finger nail, acvtually a bit less, probably as a result of debris thrown up by another vehicle. It was nothing special and anyone would have just dabbed a spot of touch-up paint on it.

But not Leclerc. They made a huge issue of it and said that the vehicle would have to go off to the body shop to be assessed by their painter. In the meantime despite my protestations they have seized my 1500€ security deposit and I know what I now expect. A huge bill for repainting the van’s front bumper. They won’t do it, of course, it’ll just be marked on the sheet as another cosmetic blemish on the vehicle as far as future hirers are concerned.

I suspect Leclerc is making more out of ‘repairs’ on the van that I hired than from the actual hires themselves. You hear stories like this but usually about less reputable vehicle hire companies. But it would seem that Leclerc has now decided to go the same way. I’ve used them several times since I’ve been here without any problems but this will be the last time, that’s for sure.

Interesting heat pump information

Really interesting. I was paging through the heat pump’s main menu on the unit itself and found a section called ‘Information’. When I looked into it more I found it had the following sub-menu.

null

‘Malfunction history’ was interesting because it showed there was a repetitive problem labelled ‘Water flow problem’ on the morning of installation which probably explained why the engineer was on his phone so much. However, as all now seems to be working what I was more interested in was ‘Energy data’ and when I selected that the following sub-menu came up.

null

That caught my attention so I decided to immediately investigate ‘Energy input’ and was treated to the following data screens showing the heat pump’s consumption of energy by day, week, year to date and since commissioning. I was really impressed.

null

null

null

null

Then I decided to look at the data for ‘Produced heat’, was presented with a similar set of data screens and was even more impressed!

null

null

null

null

null

Amazing! So with an input of only 14 kWh since the pump was installed on Thursday it has produced a heat output of 72kWh, over 5 times as much! That figure blew me away. I’ve previously read about heat pumps having a performance factor of 3x but to be getting over 5x I find to be almost unbelievable.

I don’t know what this means for the future – it’s still very early days and the outside temperature is still relatively warm at 16 degrees C. However, the heat pump specification sheet says that even with an outdoor temperature of -15 degrees C the pump can produce an output temperature of 65 degrees C. I find that amazing and very encouraging as I think that that should be quite adequate to keep my new house very cosy through the winter months here in the Dordogne 🙂