Disaster struck

I left Fleurac for the UK on Thursday having made my land and caravan as secure as I could. I was very concerned, however, by the weather forecast for the following day which showed that there would be strong northerly winds with very fierce gusts of over 80 kmh/50 mph in the late afternoon and early evening which made me fear for the safety of my ‘tonnelle’ that was standing at the bottom of my land next to my caravan.

Nevertheless, I thought that it would be safe as the winds were expected to be from the south-west and the ‘tonnelle’ would therefore be relatively sheltered in its position at the bottom of the dip. But it turns out that I was too optimistic. My friend Victor said that he’d keep an eye on things for me and sadly on Saturday morning I received the news from him that my ‘tonnelle’ had been destroyed.

Here are some of the shots of the aftermath that he took and sent over to me.

null

null

null

null

null

The winds on Friday were so strong that they’d succeeded in destroying the ‘tonnelle’s’ metal frame bringing the whole structure down. I find this quite extraordinary being as the tie-down cords were still in place and until I return and am able to see the damage for myself, I find it difficult to understand how this happened.

But in any case, I’ve now lost the ‘tonnelle’ without it ever having been used for its intended purpose and it now leaves me with a problem. I had two ‘tonnelles’ of the same dimensions and design that I wanted to set up in the area outside my caravan to use for eating outside and the like and I’d even bought a second floor-covering that’s the same design as the one I’d put into the damaged ‘tonnelle’ so they’d both match. I need the two for my plans but if I just buy another they probably won’t match. I guess I’ll have to leave the decision as what to do now until I get back 🙁

Very frustrating

It’s mid-morning as I type this and yet again there’s no activity on my house-build. So that’s two weeks since anything was done to move the project along and there’s nothing much that I can do about it.

null

The contractual period by the end of which the house must be completed is 12 months and the builder must know that even with delays like this at the front-end, they can still get the house finished within this deadline to avoid paying penalties. That doesn’t do much for my hopes, however, for a speedy completion that will see me moving in by the end of the summer.

I certainly don’t look forward to facing another winter in my caravan, especially as if it does happen, it will be down at the colder bottom end of my land. This delay and the uncertainty it engenders is highly frustrating to say the least, the more so as I plan to leave for the UK in just a few short days.

But there’s more to this. According to the contract terms, I transferred a sum equivalent to 15% of the cost of the build on commencement of work but I don’t think that I see that value in the work that has been completed at this moment in time.

Nevertheless, I’ve been requested to make a further transfer in the meantime and have complied, bringing the total up to 25% of the cost of the build and for that I would like to see the groundwork completed and reasonable progress having been made on the walls.

I don’t much like paying for results in advance and not seeing anything happening so we will have to see what happens over the coming couple of days before I start asking some leading questions.

Job done

Well, nearly. With my planned trip to the UK drawing closer every day I needed to fence in the other (south) side of my land, not so much for security but to stop the wild animals coming on while I’m away. I’ve only got two small fruit trees planted and the deer have already had a nibble at the bark of each one and if I didn’t do anything I’m sure that I’d return to find them severely damaged or perhaps eaten down to the ground.

I can’t put all of the fence on that side into place permanently however. The main reason is that there’s a large gap in the middle to allow the builder room to work and a bit further down the two gateposts that have been put in both have to come out again as they’re as bent as a fiddler’s elbow and it would be futile trying to fit a gate between them. So although I could fit the three tensioning wires to support the fence mesh in the bays in the bottom section, I could only make the supports temporary further up, just enough really to deter the deer from finding their way over.

I’ve got more fixing to do tomorrow but I managed to get all the mesh that I wanted to hanging on the posts, and don’t I know it because it was a long, very hot afternoon’s work and I’m now feeling it a bit. However, as the photos show, it was worth it.

null

null

null

null

null

I haven’t cut the mesh so when I leave I’ll carry on unrolling it and hang it right up to the last post that’s there. I need to leave the gap there for now as it’s the only way that I can get my car down to the caravan but when I leave I’ll fill it to prevent any vehicle being driven down there. Not that I think anyone will want to, on foot even let alone in a vehicle.

Heavy lifting – done

For now anyway! After retrieving my pair of outdoor tables from my ex-neighbour, Chantal’s, garden yesterday I only needed to bring my plant pots over from Victor and Madeleine’s garden, where they’ve been kept safe since last June, in order to be self-contained again. It was another beautiful day today so ideal to get the job done.

To be honest, I wasn’t much looking forward to it because two long tubs and two tall planters are made out of fine concrete and are very heavy and when I moved them from Plazac, I had some help getting them onto my small trailer. This time around I had to do it by myself but I managed it and now all of my pots are secure in the small space behind my caravan and ready to be used again, which I’m thinking of doing when I return from my impending trip back to the UK. More on that later.

null

null

Last but not least was my little white statue of Venus rising from the waves which became quite a local landmark at Plazac because it was how all of the delivery drivers found my old house. For now she has pride of place standing at the corner of my ‘tonnelle’.

null

She won’t always be there though. Eventually she will be restored and repainted and given a new position outside my new house where probably she will become as equally well-know as before. But that will be much later when the house has been completed and there will be no chance of her being damaged because she has survived the long journey from the UK to Plazac and now to Fleurac in one piece and that’s how I want her to stay 😉

Getting organised again

I cut the grass yesterday for the first time this year, not all of it of course, just the area below the ‘building site’. It was a perfect day for it and I confess that for the first part of the afternoon I sat out and enjoyed the warm sunshine before starting on the grass later on and finishing in the early evening. Today was another glorious spring day and this was the sight that greeted me when I looked up towards the house-build from my caravan.

null

Nothing more has happened on-site this week since Monday, I guess because the builder has been preparing for a big leap forward next week putting in the beams that will support the house and moving towards completing the main concrete base slab. Here are some shots taken with one of my drones (my Hubsan Zino) that show the build progress to date and how the rest of the land is now looking after the winter, now that the grass has been cut.

null

null

null

null

Before moving on, I can’t resist showing this gorgeous shot of the bottom of my land and the lovely little valley beyond. That area is classed as solely agricultural and one of the reasons I went for this piece of land was because that view, which will be seen from my living room, kitchen and bedrooms 1 and 3, can never be taken away because of that. Not in my lifetime anyway.

null

Having cut the grass and just in case there will be a lot of building activity next week, I thought it would be a good idea to move my trailers away from the area behind my ‘abri’ to give the builders a bit more space and also prevent them possibly becoming trapped. So I decided to kill two birds with one stone. My ex-neighbour, Chantal, is moving next week from the house next to my old one at Plazac to one in Rouffignac. Since I left she’s been looking after my two outdoor tables by keeping them safe in her garden and I therefore needed to transport them over to Fleurac before she moves.

Today was perfect for doing it so I started by going over to pick up the smaller of the two with my small trailer and measuring the larger one to make sure that it would fit into my larger trailer, bearing in mind that it’s missing a large part of its floor. I got both of them safely over to Fleurac and after giving them a good hose down to remove as much of the grime that built up on them both since they were put out last July, I placed the smaller one in the open area between my caravan and the ‘tonnelle’ and the larger one inside it for now.

null

null

The larger one will remain inside the ‘tonnelle’ until I get back from my proposed trip to the UK when I can advance my plans and erect the second ‘tonnelle’ that’s presently still in my ‘abri’. There’s no point having both of them out in the weather while I’m not around and in the meantime we’ll be able to use the wooden furniture as and when friends drop in for ‘aperos’ now the weather is becoming so nice.

Here’s where I ended up putting my trailers. An ideal spot really, not visible from the road so reasonably secure, and also not where they will be an eyesore.

null

All I now have to do is pick up my plant pots from Victor and Madeleine’s, which I’ll do maybe this weekend, or certainly before I leave for the UK. Then I’ll be fully self-contained again, apart from the stuff that’s in storage, of course. After that I’ll be able to put the rest of my plans in place to make my little piece of paradise even more organised than it is now and I’m looking forward to it 😉

Quiet day

The builders didn’t turn up today because I guess they’re allowing the columns that they set the last time they were on site to cure and gain strength. However, Thomas, their surveyor, did come on site and carefully checked the work that had been done, presumably to make absolutely sure that everything’s in exactly the right place and to the correct dimensions in advance of the next stage.

I also found out why my electrical supply failed. I’ve used the same two 50 metre extension leads that I did previously when I originally connected my caravan to my neighbour’s house but they came up just a few metres short. I’d therefore temporarily bridged the gap with a third which has 50 metres of smaller diameter cable wound on a spool. I’d only unwound a few metres and left the remainder on the spool and these two things together meant that the cable was becoming hot enough in use to trip the spool’s thermal breaker.

Although I’d checked this at the time and reset all of the breaker buttons on all three of the spools, even after I’d unwound the hot cable from the spool, its breaker still took several minutes to reset, so this was why I couldn’t get the system up and running again at the time. So it appears that EDF wasn’t at fault on this occasion, it was a technical failure in my cable that was responsible.

I made up another 20 metre extension with larger diameter cable today and all is now working as it should. I still have an electrical problem to sort out though. I hadn’t realised that I left the light on all day over the caravan’s sink and although when I did spot it after several hours it turned off OK, it wouldn’t turn back on again. So as well as trying to cut the grass tomorrow (Wednesday) I’ll have to buy and install a new small strip light. And I thought I’d have nothing to do living in my caravan once work started on my house 🙁

Back on the job

After the frenetic activity in the first half of last week it went quiet while the concrete that had been poured into the ground was allowed to cure, but unsurprisingly work resumed again this morning. I went up to the top first thing while checking my electrical connection (which failed last night and was still down this morning) and found that a large truck was already parked on the access road with the driver delivering construction materials.

I told him that there was nobody on site from the builder but he said not to worry as they’d be along quite soon and continued with the unloading. I’m now pretty sure that all of these guys know each other very well from their many previous contracts and know exactly what they should be doing. A short while later while I was driving up to the ‘poubelles’ (rubbish bins) to drop off some stuff left over from when I moved the caravan over the weekend the builder’s truck went past in the opposite direction and when I got back the two in the truck were helping the delivery driver with the unloading.

null

null

The delivery included cement, ballast for concrete, concrete blocks and some more of the hollow square blocks that the builders had brought themselves last week and once the delivery truck had gone they got started with the young labourer knocking up light concrete, initially by hand but later using the concrete mixer that they had brought with them. Today’s job was to create columns on the concrete that was poured into the anchoring foundations last week using the hollow blocks placed over the upright reinforcing rods filled with the concrete.

There was nothing for me to do and as I didn’t want to make myself a nuisance by looking over their shoulders I left taking any more pictures until after they’d gone at not long after 3.00 pm. But one mustn’t be judgmental – they started at 9.00 am and worked right through as far as I could see without stopping for lunch or any other major break, so I think they did pretty well. Here are a few shots of the site at the end of the afternoon.

null

null

null

null

Here are a couple of shots of columns showing how they were made, simply by stacking up several of the hollow blocks and filling them with concrete.

null

null

But there was more to it than that because the tops of the columns also had to be adjusted, presumably in order to form a level base for the beams that it’s my guess will be put in place later in the week. In the next shot you can see one such column and in the final shot how three in what will be the central spine of the house have all been adjusted in the same way.

null

null

I’m not privy to what will happen next – I don’t know if a retaining wall of blocks will be laid around the perimeter of the house before the beams are put in place but I suspect it will be. But I guarantee that nobody will be more interested than me 😀

Bizarre

Explain this if you will. My electricity went off at around 8.00 pm last night and I connected up my generator at about 6.00 am this morning which I had running until midday. I checked every half hour or so to see if my supply had been restored but to no avail and eventually popped over to check with my neighbour who said that she hadn’t suffered any power outage at all. This didn’t surprise me because relatively speaking, my connection was made from a box ‘up’ the road whereas hers comes from further ‘down’ so she could easily be connected via a different sector.

Nevertheless, I thought that it was about time that I ran a check on my connection, so I dug out an electric saw and plugged it into the unused, second socket that I fixed on the side of my electrical box up near the road. And it worked. This meant that electricity was obviously being delivered. So I checked the other socket to which my caravan was connected and that worked too, so no problem there.

I’ve had to use three extension leads to get down to the bottom of my land where the caravan now is all of which were used previously when I connected to my neighbour’s house when I first moved into my caravan and have been used since. Even so, I thought that it’d be a good idea to check each one in turn. So I did, and to cut a long story short, each one worked fine. So then I connected the caravan up to the third one, as it had been previously, and it worked.

So what’s going on? Was the power restored by EDF just by coincidence, moments before I decided to test my cables? Or alternatively, was a gremlin at work playing games with my electricity at my expense? I guess I’ll never know, but at least the experience has made me set up my generator on a fine day so it’ll be ready next time I need it, because you can bet that when that time comes, it’ll be pitch black and pouring with rain. That’s what I’m thinking anyway, and it’s helping me feel a bit better about things… 😕

Another moving experience

My caravan has remained at the top (road end) of my land ever since last Autumn when I moved it up from the bottom in order to get as much protection as possible from the northerly winds from the trees up there during the Winter. I toyed with the idea of keeping it there during the construction of my house so as to be close to the water and electrical supplies but as soon as work started it became obvious that it would be far too close to the action.

It is already clear that parking my car on the access road that the builder has put in would not be an option because it then wouldn’t be wide enough for the site vehicles and machinery that need to be brought on site and parking it close to my caravan as I’ve been doing for the past months would not be ideal as the ground is already becoming very cut-up in that area and will become more so. And, of course, it is bound to become more noisy, dusty and dirty as work proceeds.

Another consideration is that I have two ‘tonnelles’ (gazebos) for which there is definitely not enough space up at the top and I’ll be needing them this summer to house outdoor furniture for when it becomes hot and sunny as it will do in the not too distant future. I couldn’t face another summer confined to a hot and stuffy caravan and it’ll be pleasant to have somewhere that’s cool to enjoy pleasant afternoons with friends and a few drinks and snacks.

I always had in mind that I’d be moving the caravan back down at some time but I didn’t realise that it would be this soon and that the ground over which I’d be moving it would be as disrupted as it is. When I built my ‘abris’ (garden tool store) up at the top end I’d carefully tried to work out as accurately as possible where to place it to allow the builder the amount of access they said they’d need and what angle to position it on to align it with the house and also allow me reverse my Kia up alongside it in order to hitch to the caravan and pull it out while missing the trees behind it.

So quite a lot to think about and I had no guarantee that things would work out until I actually did it – which I did by reversing the car and pulling the caravan out a few inches at a time. And luckily it all worked out, although I did worry for a few moments as the rear of the caravan swung round past the back corner of the ‘abris’.

null

null

null

I didn’t have a lot of room to work with and although fortunately the caravan remained on fairly flat ground the Kia’s 4-wheel drive and high ground-clearance came in handy as it had to climb up and over the short, steep bank on the opposite side of the access road.

null

At the moment there isn’t enough space to allow me to drive between the foundation work and my new fence posts down to the bottom of my land so I had to completely turn the caravan, take it up to the road, descend on the land neighbouring mine on the other side of my posts and then reenter between the last couple when I got to the bottom. It was lucky that I hadn’t got around yet to fixing the mesh in place down there!

null

null

It was then just a matter of jiggling the caravan backwards and forwards to get it into the position that I wanted, which was mor difficult than I expected it to be because of the limited visibility that I had and the closeness of the overhanging walnut tree.

null

null

But I finally did it and this was how things looked at the end of the Saturday. The job had taken me all day and by the time I’d cleaned the caravan’s interior and replaced everything that I’d transferred to the car or moved inside it, I have to say that I was totally whacked.

null

On Sunday morning Wim paid his usual morning visit for coffee and a chat this time accompanied by Jean-Pierre. And this time was even better than usual because later on Sophie and Sylvia, Jean-Pierre’s wife, also turned up which was great as it’s always nice to have visitors. It also gave me several more pairs of hands to help me shift the ‘tonnelle’ that was already there and after they’d left I was able to set that up again in what will be its new, permanent position.

null

null

null

To finish off with, a footnote. Not long after I’d started on this post at around 8.00 pm on Sunday we had a power cut. Typical that it should happen after I’d just moved the caravan as far as it could be from my ‘abris’ where my generator was with no way of getting a connection down to the caravan. In the event I went to bed early – really early at around 8.30 pm – but when I got up at around 6.00 am on Monday, the power was still off.

So nothing else for it but to get my generator out of the ‘abris’ and bring it also down to the bottom next to the caravan where it’s now whirring away. Later on when norm al service is resumed I’ll have to make the arrangement more permanent – with the generator under some kind of cover. And also a bit further away from the caravan than I’ve currently got it too 😐

Blown away!

I was at my computer at 8.00 am this morning working on yesterday’s video when I was surprised by not one, but two enormous ready-mixed concrete trucks arriving outside my caravan.

null

null

null

null

One drove down forwards and the other backwards so they ended up being parked back-to-back. The reason was that the first one was equipped with a concrete pump while the second contained the concrete that would be delivered into the column holes from yesterday.

null

The idea was for the second truck to pour its concrete into the hopper of the first which could then deliver it where needed through the long boom of its pump.

null

The driver of the first truck initially began pumping the concrete into the column holes while controlling the whole operation using a portable remote controller. About half an hour after he’d started he was joined by the foreman from the contractor who was accompanied this time by a different No. 2 who assisted and also became very busy adding the steel reinforcing as and when it was needed.

null

null

null

null

As soon as the pumping was completed the second truck left for its next job leaving the pump truck behind to be cleaned up before it too departed. The site was then ready for the next operation.

null

This consisted of inserting vertical reinforcing rods into the now-curing concrete columns that will be used to connect them to the horizontal beams I expect and setting up marker strings around the outline of the house and what will be the positions of the beams ready for the next stage.

null

null

null

Everything was over and done by just after 10.00 am, so yet again in just over two hours. I am blown away by the speed of progress over the last few days and how quickly and thoroughly things have been done. Amazing!

Here’s the video that tells the story of today.

The other thing that blows me away is to see something that was originally just an idea in my head and a design on my computer actually becoming a reality right in front of my eyes. It’s an extraordinary experience, one that I’ve not experienced before on such a scale and incredibly satisfying 🙂

Under 2 hours!

That’s all it took for the two guys to finish their work yesterday. I’m amazed given that they dug 15 holes that will become support pillars for the concrete beams that will lock the base slab of my house to the underlying rock layer and the amount of earth that involved shifting.

Here are some shots that I took around mid-morning after they’d left.

null

null

null

Some of the holes that they dug were the best part of 2 metres deep.

null

null

Here’s the video that tells the whole story.

As I type this I’ve already been blow away by the next development which I’ll talk about in my next post!

They’re back!

And they really mean business. Almost dead on 9.00 am and a small truck drove up containing a few items – some concrete blocks, some concrete reinforcing mesh, stuff like that – and I thought , OK, so they’re getting ready for when they start on the groundwork in a few days time. Not a bit of it! A couple of minutes later a large truck drew up hauling a trailer carrying a Komatsu excavator.

null

null

null

null

null

null

null

They had the machine unloaded and working within half-an-hour. There are only a couple of guys working but seeing how much just one got done with an excavator the other day I reckon they’ll have my footings and slab ready for pouring concrete before I know it. It seems that after all of the delays things will now be happening like greased lightning! To say that I’m pleasantly surprised, and impressed I have to say, is an understatement…

Go!

We had a cold night last night and I didn’t sleep that well because I kept waking up with cold feet and couldn’t be bothered to get up and put some socks on. As a result I was still dozing at 9.00 am this morning when I was awoken by a vehicle engine. I thought originally that a truck or tractor had passed my caravan on the road but then realised that it had been the sound of a vehicle stopping and when I peaked out through the curtain a small truck containing two men was parked outside next to my car. I hardly expected things to start happening so quickly and I greeted them with a ‘Bonjour’ and then moved the Kia in case it would be in their way.

In the event I needn’t have bothered because it wouldn’t have been and what they had come to do didn’t take them very long anyway. They’d come to mark out the ground in preparation for when work starts on the foundations. They did it by carefully spraying red lines between the pegs whose positions Thomas had carefully checked at the end of last week, then removing them, placing three of them with red lines in between to show the house’s centre axis and then mounting level boards on poles in positions all around the foundations’ outer limits at what will be their final height.

And that appears to be it. It only took them just over a couple of hours before they disappeared again but I guess that everything’s now ready for the groundworkers to come onto site when they’re ready to go. Here’s a shot showing a small section of what they did.

null

And here are some more shots of the whole site taken from various positions.

null

null

null

It came as something of a surprise to me when they arrived this morning as I had thought that not much if anything would happen so soon after the ‘terrassement’ work. But I was wrong and for all I know the work on the foundations could now begin at any time. I have to say that as I have now booked my flights to and from the UK it would be great if they coincided with the period during which the foundation concrete was curing and little or no other work was being done. You never know, I might be pleasantly surprised 😉

On your marks, get set…

The race is almost ready to start. We’ve had yet more continuous rain almost since the ‘terrassier’ finished his work on Wednesday. Thomas, my builder’s surveyor, returned unexpectedly late Friday afternoon to make sure that the posts that we’d put in place where the corners of my new house will be were still exactly positioned after the ‘terrassement’. It had been raining before he arrived and he had to don his rubber boots and by the time he’d finished, they were caked with thick orange-brown clay.

null

null

null

It has rained almost continuously since he left but now it’s stopped and it looks as though although there are some high winds forecast, there won’t be much more rain next week. In fact, it looks as though the temperature will get up to 18 degrees Celsius by the end of the week, which is quite extraordinary. But it means that there should be a good chance that the land will have dried out before then if the builder is able to start work.

In the meantime I’ve made and uploaded a video showing the work that the ‘terrassier’ did last Wednesday which can be viewed by clicking on the link below.

I intend to produce a series of videos of the whole building process, or as much as I can of it, right through until my house is complete. I have to go back to the UK for personal and family reasons shortly after the build has started but with a bit of luck that might coincide with the time that’s needed for the concrete in the foundations and oversite to cure before the work starts in earnest. However, at this stage I don’t know for sure and I think that I’ll need to book a flight from Bergerac to Stansted anyway before the fares start to rocket and then just see how things work out.

All systems go

This morning I received some more stuff from my builder. One item had to be signed and returned to them – namely my agreement that the hole that was dug on Wednesday – the ‘implantatation’ of my house – is in the right place. It’s quite important actually because until they have that, the builder wouldn’t be able to start on the actual house-build, so I made sure that I got that in the post back to them this afternoon.

The other thing was a demand for the first tranche of funds – 15% of the contract build price – and as the banks don’t open on Mondays and are more concerned with dealing with walk-in clients on Saturday mornings, it was important to also get that done today. I know my way around the system much better now and what buttons need to be pressed and sure enough, after setting up the builder as a recipient of transfers from my account myself and emailing the bank to effect the transfer on my behalf (the sum is above my ceiling so normally I couldn’t do it myself), it still hadn’t been done after more than an hour.

So I phoned again to find out what was going on and was told that nothing could be done until they had received my email. So I said that they should look again and Voilà! Next they asked me for the builder’s account number. I said that they didn’t need it as I’d already set them up as a ‘bénéficiaire’ and all that was needed was for them to effect the transfer as it was above my transaction ceiling. So the young lady raised my ceiling – I think they are getting to know me as a client now, and my foibles – and I was able to do it myself.

But why all the urgency, you might ask? Because I note that on the ‘assurance de chantier’ (construction insurance) that the builder furnished me a copy of there’s a date for the ‘ouverture de chantier’ (opening of the site) of 15th March. That’s next Tuesday, and as neither the banks nor the post offices open here on Mondays, if I hadn’t dealt with the transfer and the confirmation of ‘implantation’ today it’s likely that that start date would have been missed. It may still be, but at least it won’t be because of anything that I haven’t done…

On the move

At last! I got a message from my builder on Monday that he hoped to have a ‘pelle’ (mechanical shovel) on site today to get going on the ‘terrassement’ for my house. This involves digging out an access road that will be filled with heavy stone to take the weight of the site vehicles and machinery during the construction and will also be the access road to my house when everything’s complete, creating a level base for the house and digging out the foundations.

After all of the delays that the project has been subjected to I hardly expected anything to happen – maybe tomorrow or the day after, but not today – but this morning I received a message that the ‘terrassier’ would be arriving between 8.30 and 9.00 am and sure enough, he did. That meant that I had to get cracking immediately to move my ‘tonnelle’ which he confirmed would be in the way, and after I’d removed its side curtains and pegs, he gave me a hand to move it out of the way down my land.

Afterwards I got some more help to move it the whole way to the bottom, pegged it down again as we are expecting some gusting winds over the coming days and moved the table and chairs into it as well.

null

null

The ‘terrassier’ started work immediately and yet again I was amazed at the amount of material that these machines can shift in a relatively short time. These shots were taken just a few minutes after he’d started work on the access road.

null

null

null

While I was setting the ‘tonnelle’ up down at the bottom, he’d already started shifting earth down to create the level platform on which the house will be built.

null

The last three shots show what will be my house’s access road.

null

null

null

And amazingly, all of the above was done in just over an hour the shots all having been taken at only around 10.30 am.

The ‘terrassier’ continued working until stopping for an hour’s lunch break at midday and then got going again. I then had to leave to pick up the chemical-free plastic hosepipe that I recently ordered to extend my water supply to the bottom of my land so I can move my caravan. On the way back I passed a large aggregate lorry which I knew had just delivered the stone for my access road. Sure enough, when I got back the ‘terrassier’ was busy laying it and was already half finished.

null

null

Here are a some shots of the large hole he had dug out to create a level platform for the house.

null

null

null

As well as the ‘pelle’ which he had used to shift all of the earth the ‘terrassier’ had also brought a heavy roller with him and after laying the stone for the road to his satisfaction he then unloaded it and began rolling it down to create a firm base. Here are some pics that I’ve lifted from a short video that I shot using my Fimi drone while he was doing so.

null

null

null

null

null

null

And that was it. He’d finished, packed up and gone by 5.00 pm which I found amazing given the amount of work that just one man had done with the help of two machines. Imagine how long it would have taken back in the day when it all had to be done by hand! But anyway, my project is now moving and today was a great leap forward. I can’t wait for the next stage which will be laying the foundations, but more on that later.

Pickaxe time

I thought that it was about time that I repaired the mudguard on my large trailer. It was damaged by the careless forklift driver at Brico Depot when he, against my instructions, tried to load a Big Bag of ballast that I needed for the concrete base of my new ‘abri’ from the side rather than from the rear. The forklift arms could not be extended far enough because of the weight of the bag and he couldn’t get it into the centre of the trailer. When he lifted it up again he caught the mudguard, bent it upwards and ripped it off its two outer securing bolts on each end.

Since then I’ve used the trailer several times, most recently for collecting the wood that I’ve needed for my new fencing, but I’ve always been worried that the mudguard might flap up and down so much that it would also be torn off its two centre securing bolts. I already had some large diameter washers so today I took the time to remove the two bolts from which the mudguard had separated, add a large washer under the head of each one and retighten them, thus clamping the mudguard back in place. It was totally successful and now I have to get round some time to fitting a new metal floor in the trailer to make it perfectly serviceable and roadworthy again.

I was originally then going to start work on my fence but before doing so I decided to check on the two little fruit trees that have been waiting to be planted in their original little pots for over a year – I was given them as gifts for my birthday last year, not the one just gone. I found that it being Spring and all that, both trees had lots of buds on and those on the plum (the other is an apple) were almost ready to come into flower.

First the apple.

null

Now the plum.

null

So now that the guys have finished whacking the fence posts in using their tractor down in the area where I wanted to plant them it was time to get them planted without further ado. Usually you’d just need to grab a shovel, dig a hole, add a bit of peat or whatever, drop the trees in and that would be it. But not here in the Dordogne. As we saw again the day before yesterday with the fence posts, you only have to scratch the surface here and you find rock. It was the same again today for the trees and so it was time to get out my trusty pickaxe again.

I wanted to plant them towards the bottom right hand corner of my land so they will not block my view of the valley beyond and will act as a kind of natural screen when I move my ‘abri’ for my ride-on mower and other garden tools down there. I had in mind a kind of triangular arrangement with another tree, probably a cherry, that I don’t have yet and couldn’t plant anyway until all of the work in that corner has been completed. So I left a gap in the lower far right corner of the ‘triangle’ and planted the two today in the other two apexes.

Here’s a shot with the apple on the right and the plum on the left.

null

Here’s a shot from a different angle with the apple again the closest and the plum a bit further away.

null

Finally, here’s a shot looking back up the land with the plum closest to the camera.

null

It took quite a bit of effort to get the job done but eventually I was able to give the roots of both trees a good soaking with two buckets of water each, which I hope will be all that they’ll need to overcome the shock of being planted and enable them to flourish. So job done, not that I expect to be harvesting much fruit in the time that I’ll be living in my new house 😉

Future plans

We have steady light rain today so after two days of working outside I’m happy to stay inside my caravan. I rehung the ‘tonnelle’ wall curtains yesterday so they are now as they should be except I’ve hung them on the upper rail rather than the lower one to keep them clear of the ground, as the following two shots show.

null

null

The rain is also running off the roof without dripping into the inside which bodes well for the furniture that will in due course be inside both of my tonnelles. The wind picked up a bit and became quite blustery for a while yesterday afternoon so I also fitted guy ropes to the tonnelle’s four corners to ensure that it stayed firmly in place.

They can be seen in the above pics but what is not clearly shown is just how much space the tonnelle actually takes up now with them attached. The conclusion I’ve come to is that when building starts the space to its side will be insufficient for the workmen to move around it and it would become even worse if I tried to erect a second one, which is my intention.

So I’m now definitely of the opinion that I need to move my caravan back down to the bottom of my land and preferably before the builder comes on site. It will be a bit colder down there in the short term compared to where I am currently but I think that despite today’s rain, we have turned the corner into spring and the days will soon begin to warm up.

I’ll also have to extend my electricity and water supplies but that won’t be difficult. The only problem will be insulating the long length of hosepipe to prevent the water becoming really hot in the summer sunshine. Free hot water is nice to shower and wash-up with but isn’t good for much else. I’m also thinking of turning the caravan compared to last time so as to accommodate the two tonnelles on the available flat(ish) land down there but I’ll have to look more closely at that once the rain stops. The move will have to happen though 😉

More post thumping

The guys came back today to put more posts into the ground. The builder asked me to leave a space close to where they’ll be working so they have enough room to swing the arm of their mechanical shovel round without damaging or knocking my fence down, so with not having the whole of the south side to do, it should have been a piece of cake.

But it wasn’t. The first few posts went in OK but when they got to the first one whose position was fairly crucial, the first gate post, it hit a rock and wouldn’t go fully in. We had to remove it a couple of times and reposition it a bit but it still went in crooked, which will make things more difficult for me when I come to make the gate. Then when we went to bang in the second gate post that absolutely couldn’t be moved, a hydraulic hose on their tractor burst.

We thought that that would be it for the day but the repair was quicker than we all expected and they were able to return after lunch to finish the job off. In fact they were dogged by even more problems with one post snapping, others twisting and several not banging in deep enough, all due to the amount of rock under the surface. Strangely enough, for some reason there was considerably more rock on this side of my land compared to the other and it really slowed things down and made for a much more untidy end result.

In fact we gave up trying to bang any posts in up at the road end because they were only going about 20 cm into the ground, nothing like the depth required. We decided that when the time comes, we’ll have to drill post holes along the top end with a mechanical augur and mount the posts in concrete. That’ll have to be after or just before the house-build is complete and the builder won’t need to manoeuver any large vehicles or equipment up there. Here are some shots that I took at the end of the day starting at the road end.

In the first shot, the post on the left will have to come out because as you can see, it has hardly gone into the ground at all. The post to the right of it which isn’t shown is a corner post. I may be able to get away with it although it really isn’t in firmly enough. I’ll have to see how it fares over the next week or so while I’m working mounting mesh on the posts down at the other end after which I’ll return to start putting the horizontal bars in place on the posts up at the road end.

null

null

This shot was taken looking down towards the bottom end and was taken from about half-way down where we had to stop to leave the gap that the builder requires.

null

The next shot shows the two gate posts on this side. They are a bit more woggly in reality than they look in this picture but I’m sure I’ll be able to get around that when I come to make the gate to fit between them. At least I hope so.

null

The next shot shows the very end of the run with the first (or last depending on which end you start from) post sited inside the tree line as close to the boundary limit as possible, just as I did at the other end of the tree line where the fence on the other side of my land starts.

null

And finally, here’s a shot looking back up my land from the trees towards the road end.

null

So although we got quite a bit done, it wasn’t a very satisfactory end to the day. The posts have gone in nowhere near as well as on the other side of the land because of the amount of rock that was encountered. It is what it is, however, and I’ll just have to do the best that I can with what I’ve got. I’ll be starting on that tomorrow morning by fixing the tensioning wires in place, starting from the bottom post and working up and I hope that things go better for me then than they did today.

Light at the end of the tonnelle

Sorry, but it was too good to miss that headline and surely everyone knew that it was only a matter of time before I used it. We’ve had another lovely day today for working outside and I went out bright and early intent on getting the ‘tonnelle’ roof properly attached to its frame. To cut a long story short, I ended up releasing the tension in all of the roof rods and detaching the whole structure from the frame. Only then could I get the fabric to stretch properly to accommodate all of the roof rods in their respective pouches in the roof edges.

But that wasn’t the end of it. The end cross beams to which the centre end roof rods are attached are slightly ‘handed’ – the fixing brackets into which the rods are bolted are slightly offset from centre. I didn’t think this mattered as there was no mention of it in the assembly instructions, but it does. Naturally with there being a 50% chance of being right, mine were the wrong way round so I had to completely remove them, turn them round and reattach them.

Only then did the roof bolt on without much strain and then the ‘tonnelle’ structure was complete. Then it was just a matter of fitting the side and end curtains, but that wasn’t as straightforward as it sounds either. The structure’s top beams have an upper and a lower bar and the instructions show the curtains attached to the lower one. But as my ground is not even, if I did that the curtains would drag on the ground at one end and this can only be avoided by suspending them from the top bar.

Here are some shots showing the curtains as I originally fitted them, inside the ‘tonnelle’ frame legs as the instructions appear to show.

null

null

The next two shots show the curtains completely zipped up and fully closed.

null

null

You’ll notice that there are some hanging problems where the corner and side posts are and I then tried turning the curtains round and hanging them outside the frame, which is how they are at the moment. However, the zips are being overstretched as a result and the zip stitching, which is a bit untidy all round, is now visible on the outside of the ‘tonnelle’. I’ve now worked out how to hang the curtains properly from the top bar inside the frame so I’ll revert to that arrangement when I get a chance.

All of the next shots show the curtains hanging outside the frame posts. Once I’d got all the curtains in place I collected the cane table and chairs that have been under a plastic cover down at the bottom of my land since I left Plazac. When I uncovered them I found that where the cover had allowed water to penetrate it had caused some slight damage to the wood, mainly on the chair backs and the rim of the round table. It’s not too bad though and it will only take a little bit of rubbing down and varnishing to make it hardly noticeable.

I gave everything a hose down to clean it up a bit but the table still needs a bit more work because the packing tape that I used to secure its glass top while in transit has left quite a bit of residue behind. Nevertheless, it and the chairs will be OK to use for now once the chair seat pads have dried out. Here are a couple of shots of the set inside the ‘tonnelle’.

null

null

I was very pleased to find that there will be enough room if I move everything down a bit towards the end for the 2-seat sofa and two single armchairs to fit across the other end. There may even be enough room for a small low table, which would also be really nice, especially as I’ve already ordered a plastic ‘tapis de sol’ (camping mat) measuring 2.5 x 3.5 metres to cover the floor.

To finish off, here are some shots of the ‘tonnelle’ showing its general position relative to my caravan and other things.

null

null

null

null

As the ‘tonnelle’ is slap bang in front of my caravan, I’ve now lost my gorgeous view to the south, but this will be a small price to pay to have somewhere shady and cool to eat and drink outside once the weather begins to heat up, as it will do soon.

But thinking ahead even further to when building work on my house gets underway, I now think that it’ll probably be a good idea to move my caravan back down to the bottom of my land where I had it last summer. This would mean shifting the ‘tonnelle’ down there also, but that won’t be too bad and checking how things might work with it outside my caravan up at the top was one of the reasons why I decided to erect it in the first place. I think down at the bottom will be much better, even if it will mean making new arrangements for my electricity and water supplies.

A nearly day

That’s the only way to describe today. It started off OK as my first job was to unload the latest (and hopefully, final) batch of wood that I’ll need for my fencing that I bought a week or so ago but have left under a plastic tarp on my trailer ever since. What really shocked me was how much of it was covered with a thick greenish mildew, presumably because it was wet when I bought it and the warmth under the tarp subsequently provided ideal conditions for it to take root and multiply. It looks pretty horrendous but seems to brush off quite easily so shouldn’t give rise to too many problems, and when I eventually come to paint all of the fencing – wood, posts, horizontal bars, gates, everything – with preservative, it’ll be killed off anyway.

This wood is what I’ll be using for the horizontal bars on the fencing sections in the front of the house and the vertical bars of the gates. It actually consists of the outer sections of the trunks that are stripped off before the trunks are sawn down to make planks and I chose to use it because I think that it’ll give a pleasant rustic effect. But more of that when I come to do the job in a few weeks time. Here are some shots of it after I’d unloaded and stacked it prior to re-covering it.

null

null

null

After a quick lunch I decided to tackle a job that I’ve been thinking about for a few days. There will almost certainly be a few more cold snaps before the temperatures really start to climb as we go into the full Spring, but we’re already experiencing more and more lovely days when it would be pleasant to be able to sit outside. I acquired a couple of ‘tonnelles’ (small marquee type tents) last summer which I’ve never used and have been stored in my new ‘abris’ for the past few weeks.

They have curtains on their four sides that can be pulled back selectively according to the weather and the degree of privacy that is required and my idea was to place the first one close to my caravan with the round glass-topped wooden table that I had in my kitchen at Plazac and its matching four wooden chairs inside it. We originally had this set in our conservatory in the UK with a matching 2-seat sofa and two armchairs which I have also kept in storage, so it will be quite suitable for the intended purpose. My second job today was to get the ‘tonnelle’ erected.

It was actually much tougher than I thought it would be, partly on account of its size that made it unwieldy for one person to handle, and as a result it took longer than I thought it would do. In the end I only managed to get its basic frame structure and roof completed and here’s how it looked at the end of the afternoon after the sun had dipped behind the trees on Malbec on the other side of the road.

null

null

null

But there was still a problem. The the roof covering fits very tightly onto the bars that form the roof structure – too tightly in fact. Try as I might, I couldn’t get it to stretch enough to pull over one of the pockets into which the ends of the roof bars sit securing it on the roof frame, without the risk of ripping it. Here’s what I’m talking about.

null

I don’t yet know what the solution is. As the photo shows, I’ve released the fixings that secure the roof bars to the horizontal frame rails but it still won’t stretch enough to go on, so I’ve left it until the morning to see if I can work something out. Who knows, maybe if the roof becomes wet with dew it’ll stretch a bit anyway, but I doubt it because it’s probably made out of polyester fabric which doesn’t stretch the way a natural fibre like cotton does. Anyway, that’s for tomorrow…

Paid off?

Since putting the barrier in place on the slope through the trees up to the upper level, there have been no new signs yesterday or today of the ‘sanglier’ on either my land or that next door to mine on the south side. However, they have caused quite a lot more damage on the land on the lower level, as the following shots taken yesterday show.

null

null

null

So they have returned but have stayed on the land below mine. I’m hoping that this is because the new barrier has prevented them from climbing up and that it will give me the respite that I need to get ‘anti-sanglier’ fencing in place on the bottom section of my land. If so, the effort involved will have paid off and I’m keeping my fingers crossed that this will be the case 😐

More ‘anti-sanglier’

This was how all of my fence posts were laid out along the boundary of my land earlier today ready to be banged into the ground.

null

But unfortunately the guys who were going to do it couldn’t make it and it’ll be Monday instead. So this gave me even more of a reason to see what more I could do to stop the wild boar coming onto my land and doing more damage in the time until I can get fencing put into place on the bottom section. I mentioned in my earlier post that I’d found the gap that they had got through this time to come up from the land below and this is it.

null

You can see through the trees the damage that they’d done on the land below mine before coming up the slope and through the gap. The next shot shows where they emerged after doing so.

null

So what I had to do was construct some kind of barrier in order to prevent them doing this, and here is how it turned out.

null

It doesn’t look like much but what the photograph doesn’t show very clearly is how the barrier extends forward above the slope creating a space with a wall in front of the animals and a ceiling over their heads making a barrier that they can’t climb over. I’m hoping that that will be enough to deter them.

As the next two shots show, I’ve also tried to block their paths on either side to prevent them from finding a way round it.

null

null

This doesn’t mean, however, that the fight is over. There’s another gap some 20 or 30 metres further to the south through which they could come if they wanted to. It’s shown in the next shot.

null

What it also shows is that they haven’t used it – so far – and that there’s no damage to speak of at this point on the land below. This, though, is the damage on the land next to mine above the new gap, which is of similar severity but to a much more limited area.

null

null

I’m hoping that this is because the new gap isn’t favoured by the sanglier because it’s too close to the neighbouring house and by my blocking up the route they do use, they’ll be encouraged to go elsewhere to forage for whatever it is they’re looking for. To date the damage on my land and the land adjoining it shows that they don’t like to venture too far to the left or right of their exit route.

The final shot below shows the distance that my land is away from this second gap. If I’m correct in my thinking, I’m hoping that the greater distance will keep the sanglier away at least for long enough for me to build my fence before they become used to the changes and more confident again.

null

So that was it for today. I just hope that I don’t look out again tomorrow morning and find that all of my assumptions were wrong and that I’ve had yet another visit. I’ll have to wait until tomorrow morning to find out, though.

By the way, as the land I’ve built the barrier on isn’t mine, once I’ve got my fencing in place I’ll probably remove it again. I’d also like to do that because the gap is one used by the small deer (chevreuil) when they decide to take cover after being spooked and I’d hate to think that I’ve done something that removes their escape route and discourages them from coming. When I peeked out of my caravan the other morning four of them were feeding only 30 or 40 metres away 🙂

Early start this morning

Why? Because literally all of the ground that I replaced a couple of days ago and more had been dug up again this morning and I was out before breakfast putting it all back again. Yes, yet again. This is becoming very tedious and infuriating. I can’t understand what the special attraction of my land is because although the neighbouring land to the south had a few digs and scrapes on it, the damage was nothing like as extensive as on mine.

I could clearly see where the animals had come from. There’s quite a large gap in the tree line some 30 or 40 metres to the south of my land, where I’ve placed mesh to stop them, and I could clearly see where they’d climbed up and then turned right to make a bee-line for my land.

The guys are coming back later on today to start banging more of my fence posts into the ground and in the meantime I was thinking about starting work building the gates. I’m now wondering, however, if my time would be better spent collecting downed wood from the trees next to my caravan and seeing if I can block this access up because it’ll be a few more days before I can get fencing in place on the bottom of my land to discourage the ‘sanglier’ from coming back onto it.

It’s official

Much to my surprise, Thomas, the surveyor from my house builder, turned up again this morning. He was surprised to see all my stakes in place and although I don’t think that he had come to place any of his own, I think that they came in useful for him because the purpose of his visit was to measure the differences in the heights of each corner of the house in order to gauge how the land will need to be adjusted to create a level platform for the house to stand on.

So he laughed and said, ‘Let’s see how accurate they are’, and we then worked together with his gps positioning device to accurately place all of the stakes exactly in their correct positions. In fact he was quite impressed because the first few were only a few centimetres out and the rest were only out by at most a few tens of centimetres because (a) I had turned the house slightly anticlockwise and (b) hadn’t got the 45° degree bend in the middle quite right.

I was very pleased with the outcome because the small changes that we made moved the back corner of the house slightly further out from under the trees and with a couple more branches removed, as I mentioned in a previous post, I’ll be able to almost avoid having a problem with falling leaves and acorns. Even so, we both agreed that I’ll need to place screens in my guttering to avoid the rainwater pipes and soakaways becoming blocked.

So the positions of my stakes are now official. I tried taking some more photographs to create some images showing the finished house from different angles but without great success. It then dawned on me that you can only create accurately scaled composite images with the correct perspective angles if the ‘cameras’ used to shoot the actual surroundings and the model have identical focal length lenses ie you can’t combine shots where one is taken with a wide-angle and the other with a telephoto.

So I did the best I could and here are some more shots of my house as it will be taken from three different angles. First from the south-west.

null

null

null

Secondly, from the south-east.

null

null

null

Finally from the east showing the back of the house.

null

null

null

We talked about how the flat platform will be created and this will be done by lowering the front right-hand corner to about the level of the corner on the other side and then using earth removed when the foundations are dug out to raise the back. Thomas said that they will create a level area outside at the back of the house for a patio or terrace the northern end of which will be in the form of a gentle slope down onto the garden.

I am really pleased with how things are going and can’t wait for the work to begin, which should be very soon 😀

Now you see it…

After the builder’s surveyor had left – he was taking detailed measurements for the footings because it turns out that they need to be more complex than was originally anticipated and the groundwork contractor needs to have detailed specs ahead of starting their work – I repaired the damage caused by my latest nocturnal visitors and then did something that I’ve been wanting to do for some time.

Up to now the only images of my new house on my land that I’ve been able to create by combining images from my architects’ design software and photographs of the terrain have been rough approximations. The reason is that even by taking great care, it’s been almost impossible to get the scaling right. Yesterday I purchased some wood from Brico Depot to make some stakes to accurately mark the house’s position and although I was hampered by recurrent showers, I got them in place at the end of this afternoon as the light was failing.

I don’t have a laser theodolite or even accurate measuring equipment like those used by surveyors but I took great care measuring distances and angles and I’m pretty confident that my stakes are not a mile out compared to the ‘implantation’ plan that I agreed with my house builder. Here are a couple of shots that I took firstly showing the view of the house from the south and secondly from the east (its rear).

null

null

And now the view from the front. Because the stakes are accurately placed, I can use them to accurately scale an image lifted from my architects’ design software and in order to get it right, I’ve combined the images in stages. The first shot is just of the terrain with the stakes in place, the second shows the terrain with my house superimposed in transparent form to ensure that its scaled and positioned exactly and the third and final image shows the house accurately positioned and scaled.

null

null

null

So the final image above is the most accurate image to date showing how the house will appear on my land when it’s completed. Unfortunately the light was poor by the time I could take the shot of the land with the stakes in place but even so, I’m very happy with the result and will look more at what’s possible, perhaps using shots taken with one of my drones. That should be fun and interesting but I’ll need to wait a few days for the weather to improve before I try doing that 😐

Hit again

I had another visit from the ‘sanglier’ last night. This time not as bad as on some previous occasions but annoying at the very least and the damage will take me at least 20 minutes to half an hour to repair.

null

null

null

null

However, it appears that the fencing that I’ve put in place is doing its job because this time there’s evidence of damage on the adjacent land to the south that shows that they came from that direction.

null

null

So it looks as though I’m going to have to accept that this will continue to some extent until such time as I’ve managed to get the ‘grillage’ in place along that side of the land. There’s a small problem with that because although the guys were supposed to come back as soon as the land had dried out enough to take the weight of their large tractor (we had more rain last night), the builder has arrived this morning to take some final measurements before starting on the groundwork next week and he has suggested that I hold off putting up fencing close to where they will be working.

It may still be possible to erect say, half of the run of fencing upwards from the bottom where the sanglier always do their work and that may be enough to deter them as I doubt that they will want to come higher which would be too close for them to where the work is going on. However, I first need to see what the builder is proposing and then I’ll be able to decide. But it’s good news the building work is at last on the verge of starting and the construction of my new house will soon be moving forward 🙂

At last

The rain stopped and we had an awesome day, actually. So time to get outside and finish up clearing away the rest of the leaves that have been standing in small heaps for days and being rained on. It took the whole afternoon but the effort was well worth it because now I can move onto other things.

null

All the leaves have now been cleared – all that I’m intending to clear anyway – and here’s the last barrowload before I took it and emptied it out in the trees.

null

I’m so pleased to at last see grass and the top of my land looking reasonably clear again.

null

null

null

Here’s the heap of leaves where I dumped them in the trees. It’s bigger than it looks – well over 100 barrowloads – because beforehand there was a hollow that has now been filled. And not only filled, because in the process a lot of leaves have been trampled down as I’ve walked over them to empty out the barrow.

null

null

My next job is to make the first two of the three gates that are needed in the lower three sides of the fence. I’ll have to leave the third until its posts have been put in place just in case they are not parallel and the gate’s dimensions have to be varied accordingly.

But first I think that tomorrow I’ll go to Brico Depot and buy some wood to make some pegs out of because I want to bang six into the ground where I estimate the corners of my house will be. The builder will inevitably remove them when they start work but I’d like to visualise beforehand where the house will actually be standing and get a feel for its dimensions. Up to now, everything has just been on a computer screen or paper and it would be nice to at last see something actually on the ground 😉

What I’m talking about

It rained for the whole of yesterday evening and last night keeping me awake for much of the time and this is the sight outside my caravan this morning.

null

null

There’s standing water running down the slope of my land and mud. And more mud. Continuous rain is forecast for most of this week and intermittent heavy showers over the week-end and going into next week so what the ground will be like then is anyone’s guess.

I’m having big problems trying to force a start date for the construction of my new house out of the builder but it’s a waste of time for the time being as there’s no way that heavy excavation equipment could be moved onto my land for the foreseeable future without doing much too much damage to contemplate. So he’s off the hook. For now.

A washout?

It certainly looks as though this week, or most of it at least, will be as far as my achieving my plans is concerned anyway. I laid out all of the posts for the remainder of my ‘anti-sanglier’ fence last week ready to be pounded into the ground but since then it has done little more than rain. So although the guys were due to come back this week to do the job, it doesn’t look as though that will be possible because the ground will be much too wet and the tyres of their large tractor would tear it to pieces.

I’ve also been waiting for a call from the sawmill since the end of last week to tell me that the wood that I need for the fence sections in the front of my new house and the three gates that I’ve included in the other sides was ready for pick-up. That came today, so I had to go and collect it, bring it home in my large trailer in the pouring rain and then leave it covered up as best I could to prevent it getting even wetter than it already was.

Before the rain set in I managed to clear away most of the dead leaves and acorns that have been the bane of my life since the autumn when they all fell to earth and hoped to finish the job on Saturday. I couldn’t, however, and since then the almost constant rain has prevented me from doing so and much else besides. I couldn’t get anything done on Sunday but did manage to make a few more heaps ready to be dumped in the trees yesterday between the showers, but there just wasn’t the time for me clear any of them away and dump them.

Sure, I got some lovely pics when the sun peeped through from time to time between the showers, as the following shots show, but I’d rather have just been allowed to get on and finish the job.

null

null

null

Here are a couple of shots of the wood that I needed that I took today at the sawmill.

null

null

When I arrived most of it was tied in a bundle outside and I started to load it onto my trailer by hand. However, I had a word with the manager and he said that he’d load it using his machine. That was great, but unfortunately it had to be done from the side of the trailer with the tailgate removed, and when the bundle rolled onto the trailer it forced the opposite trailer side over onto the wheels on that side.

He jiggled things around using the machine and I pushed the side upright again, but as this was the side and mudguard that were previously damaged by the loader at Brico Depot, I’ll have to take a closer look when it stops raining in case any more damage has been done that might make the trailer unroadworthy. If not, I’ll have to dismantle the trailer anyway when I can get around to fitting a new floor in it, so it won’t be a big issue until then.

In the meantime, because I had to drive the trailer without its tailboard in place, I found a length of webbing which I attached to both sides and made the whole thing more rigid and secure. Here’s the wood after I got it back to Fleurac before I threw a cover over it to protect it from the rain.

null

null

null

I decided that I wouldn’t let the rain beat me and that I’d at least try to get the rest of the leaves and acorns raked up into heaps ready to be dumped. Although I got a bit wet as I continued working in light rain when it had eased off a bit, I did manage to do that and also got a few barrow loads dumped in the trees before it got just too wet to continue.

null

null

null

null

So I’m now poised like a coiled spring (ha ha) ready to leap into action as soon as the rain stops, although I don’t know when that will be. The forecast indicates that we’ll have persistent rain tomorrow and Thursday with more rain on Friday afternoon. If Friday morning at least is dry I might be able to get all of the leaves and acorns cleared and dumped, but that remains to be seen.

It may also be dry over the week-end and before the weather turned pear-shaped I’d hoped to get in my first flight of the year. But that now looks doubtful as Malbec’s runway will undoubtedly have become too wet again. But such is life in France with my ULMs at this time of the year. And we do need the rain if we are to avoid a drought in the summer. It’s just a pity, though, that its timing should be so ruddy inconvenient 😐