Now the walls

The two workmen arrived at about 9.00 am and got cracking straight away on the interior walls. I went up to see them shortly after they’d started and asked how they were doing. They replied, ‘No problem’, I said that those were the words I wanted to hear and left them to it.

They had made a bit of progress by lunch time as the following shots show.

null

null

null

I went up again to see how they’d done at the end of the afternoon and found that they’d managed to get quite a bit more done. It isn’t just a matter of getting the dry-lining boards up. The insulation also has to be carefully measured, cut and installed before the boards are put into place.

null

null

null

null

null

null

null

null

It looks as though putting the walls up may take a little bit longer than I originally anticipated. However, I’d prefer to have a slower good job rather than a quick bad one and it looks pretty good so far. I’ll be interested to see what progress is made tomorrow 😉