So frustrating and annoying

Yet again I have a list of jobs to do to move MYRO forward and I’m sitting indoors watching the rain lashing down outside. I picked up the ailerons and trailing edge tubes from Ken’s a couple of days ago and I was all set to do what I have to do before getting them over to Stoke for Chris to inspect them. I then planned to get the wing reassembly work done, ready for them both to be re-fitted. I also now have the prop bolts so that can be fitted as soon as I’m ready to. I’m so close to getting finished now but at this rate I could lose yet another week. I’m getting so fed up with how this keeps happening, time after time 😡

I just came back to add a bit more to this post. The day turned out not to be a total loss after all. Once the rain stopped I got across to Ken’s and got cracking doing what I could despite the horrendous wind that was still blowing after the rain had passed through. I forgot to take the hole cutters with me last time so couldn’t fit the lower Mikuni that needs a hole cut through the screen to match the one that’s in the side of the pod, so as well as doing that and fitting the Mikuni, I also drilled the two holes for the electric fuel pump and fitted that too. I had to get a short length of fuel pipe to connect the pump to the Mikuni because the stuff that was fitted was cracked and perished even though I only fitted it in 2009. It was made by Trelleborg and there was an official bulletin about it and as I’d had to inspect it every month and make a note in my engine log book that it was still in serviceable condition, I was glad of the chance to get rid of it for good.

I then had to lie on my back in the cabin with my legs in the air and my head under the panel to tighten up the fuel pressure gauge. This had to be done after the panel was fitted so I had no choice but I just hope that it’s the last time I’ll have to do it. I’d also fitted a replacement engine hours gauge while the panel was out. It was a cheap and cheerful Chinese unit and unfortunately its fixing system leaves a bit to be desired. I’d hoped to tighten that up too but I’ll have to find another way of doing so – probably just wrap the body of the gauge in a bit of black insulating tape and push it tightly into the panel hole which should be sufficient.

So that was it. I had hoped that some items I’d ordered from Ebay during the week to do the work needed on the aileron would arrive in the post today but they didn’t. Ruddy nuisance but it was lucky I didn’t wait in for them. I’ll probably have to resign myself to buying them locally tomorrow and then seeing them arrive too late on Monday. Trouble is, if I don’t do the work this week-end, I might end up losing a whole week which I’d really like to avoid now I’m this close to finishing. It’s yet another inconvenience – as I say, frustrating and annoying… 😕