Got a smile on my face

We had our first heavy frost last night (yes, it was chilly in the caravan) but the two builders were back on site bright and early this morning to resume work on the house’s walls. In fact it turned into a beautiful day with bright sunshine and cloudless blue skies the whole of the day and pleasantly warm considering we’re now into December.

I didn’t take any photographs or videos while the two guys were working because I didn’t want to upset them by making them think I was spying over their shoulders but I did go up later after they’d left for lunch to take a few shots showing the progress they’d made.

The first shot shows a view of the walls beginning to rise from lower down the land.

null

Now some pics of the work they did this morning. I’m amazed how much they achieved in what I thought was a relatively short time.

null

null

There have been some questions about how they build with blocks that are full of holes and why the mortar doesn’t all fall down inside. The answer is that they don’t use mortar – they use a special adhesive that squirts out of cans in the same way that spray foam does. Here’s a shot of some of it that oozed out of a vertical joint.

null

And here’s one of the cans that it comes in. The picture on the can shows how it’s applied to two of the long internal surfaces. The next block is then placed on top and the joint between them cures until it’s very strong and rigid.

null

Once a course of blocks is marked out with string to keep them straight, a whole row of them can have joint compound sprayed on them and the next course then dropped on making sure that the exposed faces are vertical compared to the course below. This makes building very fast and a wall can be seen going up in hardly any time at all.

Here’s a shot looking up towards bedroom one from the living room.

null

And here’s a shot of a joint compound spray can that had recently been used.

null

The following are some general shots showing the progress that had been made up to lunchtime.

null

null

null

null

null

null

null

null

I didn’t take any more pictures until the end of the day after the workmen had left. By that time it was getting a bit darker as the sun was going down and also quite a bit cooler as we headed towards another cold night with clear skies.

I think that they’d done incredibly well and compared to what I’m used to seeing, the progress they’d made was fantastic, more or less up to the height of the window sills. Here’s a view of how much higher the walls had grown, from further down the land.

null

And now some more general shots of the project.

null

null

null

The next shot is of the main doorway. You can see that compared to when the young chap came back in August to lay down the green damp-proof course, these guys have measured it out more exactly and as a result, the blocks they’ve laid do not fully overlap the compound. I don’t think that that will be important because firstly there is still a barrier there and it’ll be under the porch anyway.

null

null

null

null

Here’s another shot of the main doorway but this time from the outside.

null

null

null

null

null

null

null

null

So that brought us to the end of what I think was an incredibly successful day. At this rate the main walls could more or less be up within a week but I foresee only one problem with that. After today there’s hardly a days-worth of blocks left for them to continue with tomorrow and for them to be able to carry on after that, more would already need to be either on-site or on-the-way ready to be dropped within the next two days.

The question is, will they be and are there even enough readily available supplies? I guess that I’ll find out the answer to that shortly… But not first thing tomorrow, though, as I have an unwelcome dental appointment to have some broken roots extracted 🙁