{"id":21354,"date":"2023-06-17T20:04:27","date_gmt":"2023-06-17T18:04:27","guid":{"rendered":"http:\/\/www.micro-trike.co.uk\/wordpress\/?p=21354"},"modified":"2023-06-17T20:04:27","modified_gmt":"2023-06-17T18:04:27","slug":"3-out-of-4","status":"publish","type":"post","link":"http:\/\/www.micro-trike.co.uk\/wordpress\/3-out-of-4\/","title":{"rendered":"3 out of 4"},"content":{"rendered":"<p>I was up at around 6.00 am this morning and after I&#8217;d had a leisurely breakfast and emptied my bins I was up &#8216;on site&#8217; getting things ready to start work by about 8.00 am. The two ceiling coving priorities were the bathroom and the separate toilet because let&#8217;s say, unlikely though it&#8217;ll be, that I can agree a price with the tiler and he says that he can continue non-stop with the wall tiles after doing the floor, as both of these rooms will have floor-to-ceiling wall tiles the coving will have to be already in place for him to tile up to.<\/p>\n<p>So I started on the bathroom first, which took about 2 1\/2 hours to do.<\/p>\n<p><a href=\"http:\/\/micro-trike.co.uk\/images\/17jun23_01.jpg\"><img decoding=\"async\" src=\"http:\/\/micro-trike.co.uk\/images\/17jun23_01_s.jpg\"alt=\"null\"\/><\/a><\/p>\n<p><a href=\"http:\/\/micro-trike.co.uk\/images\/17jun23_02.jpg\"><img decoding=\"async\" src=\"http:\/\/micro-trike.co.uk\/images\/17jun23_02_s.jpg\"alt=\"null\"\/><\/a><\/p>\n<p>I was then going to move on to the separate toilet but as I was on my last cartridge of adhesive, I decided that it would be a good idea to get some more so I can work tomorrow. I checked on the internet and found that Bricomarch\u00e9 at Le Bugue had what I needed at a cheaper price than Leroy Merlin so I saved a lot of time by going there. When I returned I had a very quick lunch and resumed work on the separate toilet.<\/p>\n<p><a href=\"http:\/\/micro-trike.co.uk\/images\/17jun23_05.jpg\"><img decoding=\"async\" src=\"http:\/\/micro-trike.co.uk\/images\/17jun23_05_s.jpg\"alt=\"null\"\/><\/a><\/p>\n<p><a href=\"http:\/\/micro-trike.co.uk\/images\/17jun23_06.jpg\"><img decoding=\"async\" src=\"http:\/\/micro-trike.co.uk\/images\/17jun23_06_s.jpg\"alt=\"null\"\/><\/a><\/p>\n<p>By the time I&#8217;d done that it was still only mid-afternoon so plenty of time to get cracking on the &#8216;cellier&#8217; (the utility room). Despite there being some tricky trimming to do around the electric utility box it was all done and dusted by about 5.30 pm.<\/p>\n<p><a href=\"http:\/\/micro-trike.co.uk\/images\/17jun23_03.jpg\"><img decoding=\"async\" src=\"http:\/\/micro-trike.co.uk\/images\/17jun23_03_s.jpg\"alt=\"null\"\/><\/a><\/p>\n<p><a href=\"http:\/\/micro-trike.co.uk\/images\/17jun23_04.jpg\"><img decoding=\"async\" src=\"http:\/\/micro-trike.co.uk\/images\/17jun23_04_s.jpg\"alt=\"null\"\/><\/a><\/p>\n<p>As can be seen in the final shot above, the plasterers didn&#8217;t make good the corner of the &#8216;cellier&#8217; next to the electrical service. I&#8217;ll just do it myself to save time as that part of the room will be painted and the corner will therefore have to be tidied up.<\/p>\n<p>But there you have it! Of the four rooms that I wanted to put coving up in, I managed to get three done and there&#8217;ll be plenty of time to just do the kitchen tomorrow. That will be a huge leap forward as only the bedrooms will be left to be done, probably after I move in. I have to say that I&#8217;m over the moon with today&#8217;s results which turned out to be much better than I originally expected \ud83d\ude00<\/p>\n<!-- AddThis Advanced Settings generic via filter on the_content --><!-- AddThis Share Buttons generic via filter on the_content -->","protected":false},"excerpt":{"rendered":"<p>I was up at around 6.00 am this morning and after I&#8217;d had a leisurely breakfast and emptied my bins I was up &#8216;on site&#8217; getting things ready to start work by about 8.00 am. The two ceiling coving priorities were the bathroom and the separate toilet because let&#8217;s say, unlikely though it&#8217;ll be, that &#8230; <a class=\"read-more\" href=\"http:\/\/www.micro-trike.co.uk\/wordpress\/3-out-of-4\/\">Read more<\/a><!-- AddThis Advanced Settings generic via filter on get_the_excerpt --><!-- AddThis Share Buttons generic via filter on get_the_excerpt --><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-21354","post","type-post","status-publish","format-standard","hentry","category-main-blog"],"_links":{"self":[{"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/posts\/21354","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/comments?post=21354"}],"version-history":[{"count":5,"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/posts\/21354\/revisions"}],"predecessor-version":[{"id":21359,"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/posts\/21354\/revisions\/21359"}],"wp:attachment":[{"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/media?parent=21354"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/categories?post=21354"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/tags?post=21354"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}