{"id":19664,"date":"2022-09-13T20:15:51","date_gmt":"2022-09-13T18:15:51","guid":{"rendered":"http:\/\/www.micro-trike.co.uk\/wordpress\/?p=19664"},"modified":"2022-09-15T14:52:39","modified_gmt":"2022-09-15T12:52:39","slug":"new-house-build-day-11-video-2","status":"publish","type":"post","link":"http:\/\/www.micro-trike.co.uk\/wordpress\/new-house-build-day-11-video-2\/","title":{"rendered":"New house-build, day 11 video"},"content":{"rendered":"<p>Here\u2019s the video from 25th July when the young workman came to install the underfloor pipework for the heat pump. He made a good job at the start but not so good a job of the area under the bedrooms and bathroom where he finished. I think that he\u2019d been told that he could only stay on my job up to a certain time by which he had to leave. As a result I spent an hour tidying up his work in readiness for the next stage.<\/p>\n<p><span class=\"youtube\"><iframe loading=\"lazy\" title=\"YouTube video player\" class=\"youtube-player\" type=\"text\/html\" width=\"640\" height=\"505\" src=\"\/\/www.youtube.com\/embed\/9p659_Y2Flk?wmode=transparent&amp;fs=1&amp;hl=en&amp;modestbranding=1&amp;iv_load_policy=3&amp;showsearch=0&amp;rel=1&amp;theme=dark\" frameborder=\"0\" allowfullscreen><\/iframe><\/span><\/p>\n<p>Sheets of reinforcing steel will now be laid on top of the heat pump pipes and then the project will be ready for a big leap forward when the concrete floor slab is laid. I was very happy when this eventually happened (see upcoming video) as up until then the polystyrene \u2018hourdis\u2019 had been exposed to UV rays from very hot sunshine over a period of several weeks that I had been worried might damage them.<\/p>\n<!-- AddThis Advanced Settings generic via filter on the_content --><!-- AddThis Share Buttons generic via filter on the_content -->","protected":false},"excerpt":{"rendered":"<p>Here\u2019s the video from 25th July when the young workman came to install the underfloor pipework for the heat pump. He made a good job at the start but not so good a job of the area under the bedrooms and bathroom where he finished. I think that he\u2019d been told that he could only &#8230; <a class=\"read-more\" href=\"http:\/\/www.micro-trike.co.uk\/wordpress\/new-house-build-day-11-video-2\/\">Read more<\/a><!-- AddThis Advanced Settings generic via filter on get_the_excerpt --><!-- AddThis Share Buttons generic via filter on get_the_excerpt --><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-19664","post","type-post","status-publish","format-standard","hentry","category-main-blog"],"_links":{"self":[{"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/posts\/19664","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/comments?post=19664"}],"version-history":[{"count":5,"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/posts\/19664\/revisions"}],"predecessor-version":[{"id":19672,"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/posts\/19664\/revisions\/19672"}],"wp:attachment":[{"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/media?parent=19664"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/categories?post=19664"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/tags?post=19664"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}