{"id":17883,"date":"2021-10-20T10:01:33","date_gmt":"2021-10-20T08:01:33","guid":{"rendered":"http:\/\/www.micro-trike.co.uk\/wordpress\/?p=17883"},"modified":"2021-10-20T16:14:43","modified_gmt":"2021-10-20T14:14:43","slug":"its-started","status":"publish","type":"post","link":"http:\/\/www.micro-trike.co.uk\/wordpress\/its-started\/","title":{"rendered":"It&#8217;s started"},"content":{"rendered":"<p>After a certain amount of everyone, including the mayor, standing around talking, which seems &#8216;de rigueur&#8217; in France, engines were started earlier this morning and work began on connecting me up to electricity. It didn&#8217;t take long before the chap operating the &#8216;mini pelle&#8217; (small excavator) had uncovered the empty plastic tube (&#8216;gaine&#8217;) that was buried a few years ago and runs up from the corner of my land to the &#8216;coffre&#8217; (electric box) 80 or 90 metres away on the other side of the road.<\/p>\n<p><a href=\"http:\/\/micro-trike.co.uk\/images\/20oct21_01.jpg\"><img decoding=\"async\" src=\"http:\/\/micro-trike.co.uk\/images\/20oct21_01_s.jpg\" alt=\"null\" \/><\/a><\/p>\n<p>They have a &#8216;cable snake&#8217;, a long stiffish cable on a spool, which presumably they intend to shove up the &#8216;gaine&#8217; until it emerges at the other end and which they&#8217;ll then withdraw with a strong cord attached to it (I saw this happening when they were laying cables in the ground at my old house just before I moved). They&#8217;ll then attach the cord to the electrical cable and pull that through until it is inside the &#8216;gaine&#8217; and sticking out at both ends, ready to be connected at the &#8216;coffre&#8217; on the other side of the road and a new &#8216;coffre&#8217; that will be the source of supply on my land.<\/p>\n<p>I don&#8217;t think that I&#8217;ll be getting connected up today &#8211; I think that all they&#8217;ll do is get the cable in place, although I&#8217;m not sure &#8211; but at least everything is now getting underway and it must surely happen quite soon. Mustn&#8217;t it?<\/p>\n<p><strong>FOOTNOTE<\/strong><\/p>\n<p>It&#8217;s just after 4.00 pm as I type this and the small team has now finished, cleared away and left for the day. As I expected, they&#8217;ve only extended the main supply cable down to my land and put a box (&#8216;coffre principal&#8217;) into place ready for either Enedis or a contractor to come along and actually make the necessary connections to make it live. Here are the results of their handiwork.<\/p>\n<p><a href=\"http:\/\/micro-trike.co.uk\/images\/20oct21_02.jpg\"><img decoding=\"async\" src=\"http:\/\/micro-trike.co.uk\/images\/20oct21_02_s.jpg\" alt=\"null\" \/><\/a><\/p>\n<p><a href=\"http:\/\/micro-trike.co.uk\/images\/20oct21_03.jpg\"><img decoding=\"async\" src=\"http:\/\/micro-trike.co.uk\/images\/20oct21_03_s.jpg\" alt=\"null\" \/><\/a><\/p>\n<p><a href=\"http:\/\/micro-trike.co.uk\/images\/20oct21_04.jpg\"><img decoding=\"async\" src=\"http:\/\/micro-trike.co.uk\/images\/20oct21_04_s.jpg\" alt=\"null\" \/><\/a><\/p>\n<p>So although it&#8217;s a big advance, the project is far from finished. The big question now is, &#8216;When will my connection actually be made?&#8217; This is an imponderable. It&#8217;s not unusual to see boxes like this standing untouched for many weeks &#8211; the new boxes that were put in outside my old house that I left at the end of June still haven&#8217;t been connected up. I guess that I&#8217;ll just have to wait patiently for a bit longer to find out \ud83d\ude10<\/p>\n<!-- AddThis Advanced Settings generic via filter on the_content --><!-- AddThis Share Buttons generic via filter on the_content -->","protected":false},"excerpt":{"rendered":"<p>After a certain amount of everyone, including the mayor, standing around talking, which seems &#8216;de rigueur&#8217; in France, engines were started earlier this morning and work began on connecting me up to electricity. It didn&#8217;t take long before the chap operating the &#8216;mini pelle&#8217; (small excavator) had uncovered the empty plastic tube (&#8216;gaine&#8217;) that was &#8230; <a class=\"read-more\" href=\"http:\/\/www.micro-trike.co.uk\/wordpress\/its-started\/\">Read more<\/a><!-- AddThis Advanced Settings generic via filter on get_the_excerpt --><!-- AddThis Share Buttons generic via filter on get_the_excerpt --><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-17883","post","type-post","status-publish","format-standard","hentry","category-main-blog"],"_links":{"self":[{"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/posts\/17883","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/comments?post=17883"}],"version-history":[{"count":8,"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/posts\/17883\/revisions"}],"predecessor-version":[{"id":17891,"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/posts\/17883\/revisions\/17891"}],"wp:attachment":[{"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/media?parent=17883"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/categories?post=17883"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/www.micro-trike.co.uk\/wordpress\/wp-json\/wp\/v2\/tags?post=17883"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}